• Title/Summary/Keyword: Power Train System

Search Result 651, Processing Time 0.026 seconds

The Conceptual Design of Korea High Speed Train System (한국형 고속전철 차량시스템의 개념설계)

  • 김경택;정경렬
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.172-180
    • /
    • 1999
  • The major subject of this paper is to develop the concept fur a Korea high speed train system and recommend to train configuration. High speed train configurations are basically concerned traction power(train configurations with concentrated; CPT or distributed Power system: DPT) and train design(single car as compared with articulated bogies). The result of configuration, a advantages and disadvantaged were necessitated by different train configurations; -distributed underfloor power have an increased length for the seats by 15% as compared with the concentrated power trait - articulated trainsets are characterised by less of number of bogies and reduced values of mass, train resistance, noise and vibration. from the result, the optimized train concept combining high seat capacity per train length with low weight and train resistance is 400m long, single -floor train composed of two symmetrically arranged half trainsets. Therefore, at this work recommended distributed train system However, the final decision of Korea high speed train configuration was concentrated power train and articulated bogie system. The configuration of trainset was 20cars included 2 power cars, 4 motorized cars and 14 trailer cars.

  • PDF

Development of a Train Performance Simulation S/W for The Performance Analysis of High Speed Railway System(2) (고속전철 시스템 성능해석을 위한 열차 주행시뮬레이션 S/W 개발(2))

  • Lee, Tae-Hyung;Hyun, Seung-Ho;Chung, Heuing-Chai;Hwang, Hee-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1381-1383
    • /
    • 2000
  • A multi-train operation simulation software is under development, in this G7 Project for a High Speed Train System, to simulate the running performance, power consumption, signalling and operation. In the first stage, a Train Performance Simulation (TPS) software is introduced in this paper. This is a core module of whole system and gives some parameters of a train, e.g., its position, speed traction and braking power and electric power system state, etc. In this paper, calculation technique was used for voltage drop at the train's positions and major posts along the catenary line. The final program will be used as an evaluation tool for system performance in constructing a new line or introducing a new train system.

  • PDF

A Case study on the plan for the ESC integrating optimized train operation system for Fire & power failure accident in subway (도시철도 화재$\cdot$단전시 최적 열차운행을 위한 통합운영체계 구축방안에 관한 연구)

  • Kim Young-Wook;Choi Se-Wan;Kim Young-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1185-1192
    • /
    • 2004
  • Recently heavy traffic is getting worse because increasing population of transportation in urban area. In order to solve this problem. subway is realized with high speed, high density, highly efficiency. When fire accident happened in Dae-Gu subway in February 2003, there happened loss of people and lots of damage because of not being able to control even though fire alarm which was set up in the station rang. This thesis has constructed a simulation integrating operation system using a Database construction, operating program analysis in order to build up the most efficient train operation system. The result of simulation integrating operation system with emergency virtual situation like station and train fire, train failure, power line failure, all trains running on the rail were secured safety by train operation control system. With integrating operation of each train control system, train system, power system, machine facility system, the most efficient integrating operation system should have been constructed at the time the subway fire and power failure broke out.

  • PDF

Modeling for Power Supply Substation in Maglev Train System (자기부상열차 급전변전소의 모델링)

  • Lee, Yun-Seong;Kim, Jin-O;Kim, Hyung-Chul;Kim, Ju-Rak;Lee, Jun-Kyung
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.3
    • /
    • pp.278-282
    • /
    • 2010
  • Since a power supply substation of the magnetic levitation train system includes a inverter which is necessary to change the frequency of power, it has a different characteristic comparing to any other railway system. Nowaday a study for determining rating of facilities constituting a power supply system and modeling that system is undergoing. In this paper, a analysis model for the power supply system of the magnetic levitation train using the 3-level inverter is proposed. And the analysis for output characteristic is performed using the PSCAD/EMTDC program. The control method about the output of 3-level inverter for supplying power to loads in magnetic levitation train system is also described.

Development of a Turbine Based Flywheel Energy Storage System Using Traveling Wind Power of an Urban Train (도시철도차량 주행풍을 이용한 터빈형 플라이휠 에너지 저장시스템 개발에 관한 연구)

  • Seo, Yong-Bum;Im, Jae-Moon;Shin, Kwang-Bok
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.23 no.5
    • /
    • pp.443-449
    • /
    • 2014
  • This study aims to develop a Flywheel Energy Storage System (FESS) that uses wind power produced when an urban train is in motion, by utilizing a mounted turbine. This system was designed to generate and store electric power from wind power of a travelling urban train. The flywheel was designed to continue rotation using a one-way clutch bearing installed in the turbine shaft pulley, even in cases where the urban train decelerates or stops. This FESS can generate an additional 44% of electric power in comparison to a system not equipped with a flywheel. The generated power and operational features of the FESS were evaluated and verified through a wind tunnel test. The results show that the electric power stored in the FESS could supply auxiliary power for urban train components or service equipment, such as charging mobiles, Wi-Fi modules, and electric lights.

Study on the Development of High-speed Rotary Tilling System for Power Tiller (경운기의 고속 로터리 경운시스템 개발에 관한 연구)

  • 이승규;김성태;우종구;김재영
    • Journal of Biosystems Engineering
    • /
    • v.26 no.5
    • /
    • pp.423-430
    • /
    • 2001
  • The purpose of this study is to develop high-speed rotary tillage system for a power tiller by improving the rotary blade and the power train of transmission. Mechanical structure of gear train of rotary drive of conventional power tiller was simplified so that power can be transmitted directly from second shaft to tilling speed change shaft by rotating freely the transfer gear which changes the direction of rotation of shafts using needle bearing installed into middle shaft. A new gear train suitable for the single-edged rotary blade and high-speed rotary drive was developed with the rotational speed of rotary shaft faster than 7.5% at 1st-speed and 1.4% at 2nd-speed the one of conventional system by changing the numbers of teeth of gears of middle shaft, tilling speed change shaft and PTO shaft. Using the developed gear train for high-speed rotary drive, field tests were performed to compare tillage performances by the developed single-edged blade and by the conventional double-edged blade. The results showed that the performances by the single-edged blade compared with the one by the double-edged blade was improved about 18% in field capacity, about 34% in fuel consumption, and 9.4% in soil crushing ratio. Therefore, it may be concluded that tillage performance by the single-edged blade was improved compared to the one by the conventional blade. Evaluation of the developed system consisting of single-edged blade and gear train for high-speed rotary drive in field revealed that tillage performance of the developed system was similar to the one of field test conducted using the system consisting of single-edged blade and gear train for rotary drive of conventional power tiller However, considering the higher cone index of the upland field where evaluation was carried out compare to the one of the ordinary paddy field, it may be concluded that tillage performance of the developed rotary tilling system better than the one of conventional system.

  • PDF

Development of Loader with Four Wheel Driving and Four-Type Wheel Steering System (4륜 구동 및 4방식 조향장치를 적용한 로더 개발)

  • Cho, Huyn-Deog
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.3 no.3
    • /
    • pp.71-78
    • /
    • 2004
  • The loader of this study is an agriculture machine for a stock farmer. We has much researched about power train and steering system in order to develop a new stock machine. So, the loader developed in this study has a 4 wheel driving system and a 4-type wheel steering system. Though the technological region is some large and general, these technologies are very important and their technical life may be very long. The power train of the loader is consisted of many units as follows, engine, clutch, transmission, and axles. And, the 4-type wheel steering system is consisted of oil tank, oil pump, steering valve, solenold valve, electronic controller, hydraulic cylinders, and touch sensors. This study shows construction logics of power train and steering system. We could know from many working tests that the developed loader with 4-type steeling system has many advantages when driving in a narrow corral.

  • PDF

Power System Simulation in Seoul matropolitain subway Line-6 system (서울 지하철 6호선에 대한 전력계통 시뮬레이션)

  • Lee, Tae-Shik;Moon, Young-Hyun;Sung, Soo-Young;Yoon, Kap-Koo
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.137-139
    • /
    • 1993
  • This paper details methods used to verify the adquacy of a dc traction power supply for design in Seoul matropolitain subway Line-6 system. Examples of the approach are given for a major subway presently under construction. The performance of trains operating at maximum system design capacity is modelled using a train simulation program. Using a dc network analyser program, the maximum train operating timetable, and a model of the ac and dc electrical suppy system, the electrical performance of the entire system can be modelled over a 24-hour period. The results of this analysis are used to determime: train voltage at a level sufficient to ensure train schedules: adequacy of traction transformers, rectifier, and switchgear ratings; sizes of the overhead contact systern conductors, and ac and de feeder cables: and power and energy demands at the utility company's supply points for inital and final timetable operations.

  • PDF

A Modeling and Analysis of Electric Railway System Using Constant Power Model (정전력모델을 이용한 전기철도 시스템의 회로 모델링 및 해석기법)

  • 홍재승;김주락;오광해;창상훈;김정훈
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.116-122
    • /
    • 2000
  • This paper presents a simulation method with constant power model for the train load. In power system simulation loads could be modeled as a constant power, constant current, constant Impedance or a function of voltage and frequency. At this time, however, representing a train load as the function is difficult because of the lack of data. Therefore as a first step, simulation method with a constant power model fer a train is studied, and the test result is compared with the simulation result using the constant Impedance model.

  • PDF

Combined test of Power Supply System for Korean High Speed Train (고속전철용 보조전원장치 시스템 조합시험)

  • Cho, Hyun-Wook;Kim, Yuen-Chung;Kim, Tae-Hwan;Jang, Kyung-Hyun;Kim, Chul-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.619-625
    • /
    • 2008
  • Electrical Power supply System conditions of korea high speed train consists of main transformer, four AC-DC PWM converter of Auxiliary Block, Battery Charger in Power Car and Trailer Car, Trailer Inverter, Auxiliary inverter. Main transformer, at nominal voltage of 25kv supplied to secondary winding nominal output Voltage 383Vac, The Auxiliary block consists of AC-DC converters for generating 670VDC power, Auxiliary inverters for ventilation and air compressor, Trailer car inverter provide three phase power supplies at 440Vac for air conditioning and heating. The Battery charger Trailer and Power car supplies 72VDC all necessary equipment to energize the trainset equipment and suppy essential control. This Paper introduces the combined test results of the power supply system for korea high speed train. The main purpose of this combined test is to verify the performance of the power supply system that is designed to operate up to full load test.

  • PDF