Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 1993.07a
- /
- Pages.137-139
- /
- 1993
Power System Simulation in Seoul matropolitain subway Line-6 system
서울 지하철 6호선에 대한 전력계통 시뮬레이션
- Lee, Tae-Shik (Yonsei Univ.) ;
- Moon, Young-Hyun (Yonsei Univ.) ;
- Sung, Soo-Young (YOU-SHIN ENG.) ;
- Yoon, Kap-Koo (ACE ENGINEERING, INC)
- Published : 1993.07.18
Abstract
This paper details methods used to verify the adquacy of a dc traction power supply for design in Seoul matropolitain subway Line-6 system. Examples of the approach are given for a major subway presently under construction. The performance of trains operating at maximum system design capacity is modelled using a train simulation program. Using a dc network analyser program, the maximum train operating timetable, and a model of the ac and dc electrical suppy system, the electrical performance of the entire system can be modelled over a 24-hour period. The results of this analysis are used to determime: train voltage at a level sufficient to ensure train schedules: adequacy of traction transformers, rectifier, and switchgear ratings; sizes of the overhead contact systern conductors, and ac and de feeder cables: and power and energy demands at the utility company's supply points for inital and final timetable operations.