Proceedings of the Korean Society of Propulsion Engineers Conference
/
2004.03a
/
pp.573-576
/
2004
KARI is achieving the KSLV program according to National Space Technology Development Program. In this paper, the authors are intended to introduce the Integrated Power Plant (abb. IPP) test facility which will be constructed for the variety of tests on KSLV program. IPP test facility refers to comprehensive testing equipment for liquid rocket launch vehicle. Using this facility, KARl can verify the adaptiveness of parts and subsystems for launch vehicle and finally can qualify the system characteristics of launch vehicle doing kinds of test including hot firing test. Using this facility, KARI can simulate the vehicle launching circumstances and it make to predict the performance of launch vehicle when its flight test.
The effect of the Wolsong Tritium Removal Facility on the change of tritium concentration in the soil water was assessed by introducing a dynamic compartment model. For the mathematical modeling, the tritium in the environment was thought to come from two different sources. Three global tritium cycling models were compared with the natural background concentration. The dynamic compartment model was used to model the behavior of the tritium from the nuclear power plants at the Wolsong site. The source term for the dynamic compartment model was calculated with the dry and wet deposition rates. The area around the Wolsong nuclear power plants was represented by the compartments. The mechanisms considered in deriving the transfer coefficients between the compartments were evaporation, runoff, infiltration, hydrodynamic dispersion, and groundwater flow. We predicted what the change of the tritium concentration around the Wolsong nuclear power plants would be after future operation of the tritium removal facility to show the applicability of the model. The results showed that the operation of the tritium removal facility would reduce the tritium concentration in topsoil water quickly.
Jae Chang Kim;Jae Young Jeong;Kihong Pak;Yong Hyun Kim;Junesic Park;Ju Hahn Lee;Yong Kyun Kim
Nuclear Engineering and Technology
/
v.55
no.10
/
pp.3692-3699
/
2023
The Rare isotope Accelerator complex for ON-line experiments in Korea houses several accelerator complexes. Among them, the µSR facility will be initially equipped with a 600 MeV and 100 kW proton beam to generate surface muons, and will be upgraded to 400 kW with the same energy. Accelerated proton beams lose approximately 20% of the power at the target, and the remaining power is concentrated in the beam direction. Therefore, to ensure safe operation of the facility, concentrated protons must be distributed and absorbed at the beam dump. Additionally, effective dose levels must be lower than the legal standard, and the beam dumps used at 100 kW should be reused at 400 kW to minimize the generation of radioactive waste. In this study, we introduce a tailored method for designing beam dumps based on the characteristics of the µSR facility. To optimize the geometry, the absorbed power and effective dose were calculated using the MCNP6 code. The temperature and stress were determined using the ANSYS Mechanical code. Thus, the beam dump design consists of six structures when operated at 100 kW, and a 400 kW beam dump consisting of 24 structures was developed by reusing the 100 kW beam dump.
The Journal of the Korea institute of electronic communication sciences
/
v.15
no.3
/
pp.495-502
/
2020
In this paper, a power management circuit was designed to drive the emergency lighting LED in the underground facility for public utilities using magnetic energy harvest. The magnetic energy harvest consists of a harvest elements and power management circuits. The proposed circuit was made of a rectifier, a battery charging circuit, and an LED driving circuit. In normal times, the battery is charged with the harvested power, and in the event of an emergency, the energy stored in the battery is used to drive the LED. As a result of the measurement, it took two minutes to charge the 47 mF capacitor. This is the amount of power that can drive an LED for emergency lighting for about three and a half minutes. Through this, it was confirmed that the power management circuit for magnetic energy harvest proposed in this paper can be used as an emergency lighting LED-driven power device in an underground facility for public utilities where it is difficult to draw separate power.
Journal of the Korean Association of Geographic Information Studies
/
v.7
no.2
/
pp.69-77
/
2004
Now, there are some problems to manage underground facilities in domestic. Specially, in the case of KEPCO(Korea Electric Power Corporation), it is so difficult to manage electronic line more stably and detailedly because the geographic information and attribute information being built is not easy to be updated in the field. KEPCO officials who are accompanying management and supervision in earthwork do not have sufficient knowledge and information about GIS but they grasp the information of geography and property which coincide with the field. Therefore they have to refer their business analysis contents sufficiently for more efficient lines management in the KEPCO, but it is problem that the existing information of electronic lines management system is not. In this study, we constructed power transmission and power distribution underground facility management system for the user to manage and maintain underground facilities more easily and safely using the information of geography and property about power transmission and power distribution underground facility which have been built by KEPCO.
Park Jin Beak;Park Joo Wan;Lee Eun Yong;Kim Chang Lak
Nuclear Engineering and Technology
/
v.35
no.5
/
pp.387-398
/
2003
For reference human intrusion scenarios constructed in previous study, a probabilistic safety assessment to derive the radionuclide concentration limits for the low- and intermediate- level radioactive waste disposal facility is conducted. Statistical approach by the Latin Hypercube Sampling method is introduced and new assumptions about the disposal facility system are examined and discussed. In our previous study of deterministic approach, the post construction scenarios appeared as most limiting scenario to derive the radionuclide concentration limits. Whereas, in this statistical approach, the post drilling and the post construction scenarios are mutually competing for the scenario selection according to which radionuclides are more important in safety assessment context. Introduction of new assumption shows that the post drilling scenario can play an important role as the limiting scenario instead of the post-construction scenario. When we compare the concentration limits between the previous and this study, concentrations of radionuclides such as Nb-94, Cs-137 and alpha-emitting radionuclides show elevated values than the case of the previous study. Remaining radionuclides such as Sr-90, Tc-99 I-129, Ni-59 and Ni-63 show lower values than the case of the previous study.
Journal of Advanced Marine Engineering and Technology
/
v.34
no.6
/
pp.906-913
/
2010
Recently, lots of researches are carried out to develop hybrid power generation system for ocean facility. Normally, the stand-alone type power system is used in the ocean facility, which is influenced by weather condition. To improve the efficiency, a various charging strategy with switching algorithm has been studied. In this paper, the power system using multi-level type is proposed. The simulation results based on actual data of photovoltaic and wave hybrid power system are presented. The results show that the rate of charging time is increased 5~11% and 7~47% respectively to compare the conventional technique.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2002.05a
/
pp.867-872
/
2002
A high intensity acoustic test facility is constructed at Korea Aerospace Research Institute (KARI) by 2003. The reverberant chamber of the facility has a volume of 1,228 cubic meters and shall provide an acoustic environment of 152 dB over the frequency range of 25 Hz to 10,000 Hz. The facility consists of a large scaled reverberant chamber, acoustic power generation systems, gases nitrogen supply systems, and acoustic control systems. This paper describes how the basic parameters of a chamber and power generation systems are controlled to meet the requirement of the test. The volume of a reverberant chamber is controlled by the size of test objects and the reverberant characteristics of a chamber. The capacity of acoustic power generation systems is determined by the energy absorption of a chamber and the efficiency of acoustic modulators. Simple math is employed to calculate the required power of acoustic modulators. Moreover, the paper explains how the distribution of sound pressure level at low frequency is checked by analytical and numerical methods.
Kim, Kwang-Hwa;Yi, Sang-Hwa;Lee, Heun-Jin;Kang, Dong-Sik
Journal of Electrical Engineering and Technology
/
v.6
no.5
/
pp.677-683
/
2011
The present paper describes the setup of standard partial discharge calibrator for measuring partial discharge and estimating uncertainties. The standard PD calibrator was designed and set up, consisting of a digital pulse generator, capacitor modules, and a digital oscilloscope controlled by software developed in the laboratory. Using this software, averages of charges and rising times and their standard deviations in the measured pulses can also be calculated. The standard PD calibrator generates five types of pulses: single, double, random, oscillating, and long-rising. The coefficient sensitivities to estimate the uncertainties of pulses were extracted in the model circuit of the standard PD calibrator. The uncertainties of charges and rising times in pulses of the standard PD calibrator were estimated with single pulses. These values were 0.3%-1.4% in charges and 1.9%-7.0% in rising time; however, these values are lower than the limit values in IEC 60270.
Kim, Young-Il;Shin, Jin-Ho;Song, Jae-Ju;Yi, Bong-Jae
The KIPS Transactions:PartD
/
v.15D
no.2
/
pp.263-270
/
2008
Research of ubiquitous computing becomes more popular topic along with the rapid development of wireless technologies. Firstly, research and development on RFID focuses on manufacturing and retail sectors, because it can improve supply chain efficiency. But, it changes to USN (Ubiquitous Sensor Network) by adding a sensor and wireless network technologies on it. In this research, we design and implement the electric facility management service framework to collect real time information of electric facility using RFID/USN. In electric power industry, it is important the supply of energy must be guaranteed. So many power utilities control and supervise the transmission line to avoid power failures. Utilities install many types of sensor to monitor important facilities by wired network such as optical cable and PLC. In this research, we develop the sensor node which is small, easy to install and using wired network. We design the service framework for electric facility management to collect data using RFID tag, reader and wireless sensor nodes and implement the electric facility management service.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.