• Title/Summary/Keyword: Potential Cost

Search Result 1,822, Processing Time 0.053 seconds

Indicators of Economic Evaluation and Case Studies on New & Renewable Energy (신재생에너지 경제성 평가 결과 분석 및 평가지표 연구)

  • Ahn Eun-Young;Kim Seong-Yong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.600-603
    • /
    • 2005
  • U.S. National Research Council proposed benefits framework for energy R&D project as economic benefits, environmental benefits, security benefits and knowledge benefits. Following this framework, U.S. National Renewable Energy Laboratory evaluated the projected benefits of Federal Energy Efficiency and Renewable Energy Programs in the indicators of energy-expenditure savings, energy system cost savings, $CO_2$ emissions reductions. oil savings, natural gas saving and avoided additions to central conventional power. As this result, geothermal energy have predominant position in the energy-expenditure savings, natural gas saving and avoided addi t ions to central conventional power to FY2050. The projected benefits, in monetary value, of the whole supply-potential of geothermal energy in Korea were evaluated as 480.2 billion Won, 43.1 billion Won and 135.8 billion Won for the private energy-cost savings, social environmental-cost savings, and import energy-cost saving, respectively.

  • PDF

Cost-effectiveness Analysis and Application of DSM Program (DSM 프로그램의 비용효과 분석 및 적용)

  • Park, J.J.;Rhee, C.H.;Jo, I.S.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.692-694
    • /
    • 1996
  • Recently, rapid increase in electricity demand, tremendous financial need for new power plant construction, and environmental problem have led to search for more efficient energy production and energy conservation technologies. Due to the potential energy and cost savings to electric utilities, DSM plays an important role in the electric resource planning. However, implementation of cost-effective DSM program requires appropriate analysis methodologies and procedures. In this study, we present the cost-effectiveness analysis model for DSM program evaluation. We also present a case study to analyze DSM program.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

P-RAM 기술의 전망

  • Jeong Hong-Sik
    • Proceedings of the Korean Society Of Semiconductor Equipment Technology
    • /
    • 2006.05a
    • /
    • pp.21-40
    • /
    • 2006
  • [ ${\Box}$ ] Opportunities for PRAM Nearly ideal memory characteristics Potential for high density & low cost memory ${\Box}$ Technical Challenges Writing current reduction is the most urgent issue. ${\to}$ chalcogenide, programming volume, current density, heat loss control Improvement of writing speed, reliability ${\Box}$ Prospects (PRAM as a Mainstream Memory) Evenn, We have demonstrated 256Mb PRAM Realization of high density and low cost PRAM with good reliability will be key succss factor. We need to develop PRAM specific applications.

  • PDF

The evaluation of cost-of-illness due to use of cost-of-illness-based chemicals

  • Hong, Jiyeon;Lee, Yongjin;Lee, Geonwoo;Lee, Hanseul;Yang, Jiyeon
    • Environmental Analysis Health and Toxicology
    • /
    • v.30 no.sup
    • /
    • pp.6.1-6.4
    • /
    • 2015
  • Objectives This study is conducted to estimate the cost paid by the public suffering from disease possibly caused by chemical and to examine the effect on public health. Methods Cost-benefit analysis is an important factor in analysis and decision-making and is an important policy decision tool in many countries. Cost-of-illness (COI), a kind of scale-based analysis method, estimates the potential value lost as a result of illness as a monetary unit and calculates the cost in terms of direct, indirect and psychological costs. This study estimates direct medical costs, transportation fees for hospitalization and outpatient treatment, and nursing fees through a number of patients suffering from disease caused by chemicals in order to analyze COI, taking into account the cost of productivity loss as an indirect cost. Results The total yearly cost of the diseases studied in 2012 is calculated as 77 million Korean won (KRW) per person. The direct and indirect costs being 52 million KRW and 23 million KRW, respectively. Within the total cost of illness, mental and behavioral disability costs amounted to 16 million KRW, relevant blood immunological parameters costs were 7.4 million KRW, and disease of the nervous system costs were 6.7 million KRW. Conclusions This study reports on a survey conducted by experts regarding diseases possibly caused by chemicals and estimates the cost for the general public. The results can be used to formulate a basic report for a social-economic evaluation of the permitted use of chemicals and limits of usage.

Optimal Design of a Covering Network

  • Myung, Young-Soo
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.19 no.1
    • /
    • pp.189-199
    • /
    • 1994
  • This paper considers the covering network design problem (CNDP). In the CNDP, an undirected graph is given where nodes correspond to potential facility sites and arcs to potential links connecting facilities. The objective of the CNDP is to identify the least cost connected subgraph whose nodes cover the given demand points. The problem difines a demand point to be covered if some node in the selected graph is present within an appropriate distance from the demand point. We present an integer programming formulation for the problem and develop a dual-based solution procedure. The computational results for randomly generated test problems are also shown.

  • PDF

Development of Potential-Function Based Motion Control Algorithm for Collision Avoidance Between Multiple Mobile Robots (포텐셜함수(Potential Function)를 이용한 자율주행로봇들간의 충돌예방을 위한 주행제어 알고리즘의 개발)

  • 이병룡
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.6
    • /
    • pp.107-115
    • /
    • 1998
  • A path planning using potential field method is very useful for the real-time navigation of mobile robots. However, the method needs high modeling cost to calculate the potential field because of complex preprocessing, and mobile robots may get stuck into local minima. In this paper, An efficient path planning algorithm for multiple mobile robots, based on the potential field method, was proposed. In the algorithm. the concepts of subgoals and obstacle priority were introduced. The subgoals can be used to escape local minima, or to design and change the paths of mobile robots in the work space. In obstacle priority, all the objects (obstacles and mobile robots) in the work space have their own priorities, and the object having lower priority should avoid the objects having higher priority than it has. In this paper, first, potential based path planning method was introduced, next an efficient collision-avoidance algorithm for multiple mobile robots, moving in the obstacle environment, was proposed by using subgoals and obstacle priority. Finally, the developed algorithm was demonstrated graphically to show the usefulness of the algorithm.

  • PDF

Evaluation of wind power potential for selecting suitable wind turbine

  • Sukkiramathi, K.;Rajkumar, R.;Seshaiah, C.V.
    • Wind and Structures
    • /
    • v.31 no.4
    • /
    • pp.311-319
    • /
    • 2020
  • India is a developing nation and heavily spends on the development of wind power plants to meet the national energy demand. The objective of this paper is to investigate wind power potential of Ennore site using wind data collected over a period of two years by three parameter Weibull distribution. The Weibull parameters are estimated using maximum likelihood, least square method and moment method and the accuracy is determined using R2 and root mean square error values. The site specific capacity factor is calculated by the mathematical model developed by three parameter Weibull distribution at different hub heights above the ground level. At last, the wind energy economic analysis is carried out using capacity factor at 30 m, 40 m and 50 m height for different wind turbine models. The analysis showed that the site has potential to install utility wind turbines to generate energy at the lowest cost per kilowatt-hour at height of 50 m. This research provides information of wind characteristics of potential sites and helps in selecting suitable wind turbine.

Comparison Analysis of a Cost Price for Dental Prosthetic Restoration (치과기공물 원가계산의 비교분석)

  • Park, Myoung-Ho;Lee, Sang-Rak
    • Journal of Technologic Dentistry
    • /
    • v.22 no.1
    • /
    • pp.153-178
    • /
    • 2000
  • Dental prosthetic restoration shows a big difference of cost per itemized unit depending on the size of dental labs, facility standard, manpower, and performance. Even the same dental labs have distinctive cost according to manufacturing performance, inflation, and the number of workers. However, in apite of such a change of circumstances, it appears to be quite stable in the relative cost per itemized unit unless the manufacturing trend of particular item changes dramatically. Therefore, if the relative number of cost per itemized unit, which is produced by costing, is indicated, we are able to utilize it effectively as a standard wage estimate. If the wage of dental prosthetic restoration is determined on the basis of cost, it is desirable that the relative value of cost and that of wage are identical. But, by means of comparative analysis, since the relative value of wage reveals mostly lower than that of cost depending on an item, it is considered that the wage is not reflecting the cost approproately. Due to the subdivision and the profession of medical technology, the new development of wage items for dental prosthetic restoration is required. This means that the need for the establishment of new wage items should be presented as the general concept of dental prothetic restroation changes and the level of pathologic technology increases. The current wage structure has differences in the degree of difficulty accroding to unit items and in the cost factors. Nevertheless, the differences are not reflected enough to the wage, so there is potential to lower the medical quality through the use of low-proce materials to avoid the increase of cost and the work process which skips a manufacturing step. The new items of dental prosthetic restoration also increases, but the development of proper numerical value system is not supported. Thus, the right proce is set mostly by applying to the wage of a similar item. Since most wages are established by an individual agreement between the dental clinic institute and the dental labs, the propriety of wage level lacks. Therefore, it is urgent to provide and promote the system of a fair work charge by a standard cost which can be applied to all medical institute.

  • PDF