• Title/Summary/Keyword: Post-project environmental management

Search Result 28, Processing Time 0.023 seconds

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

A study on the effectiveness of Senior living environmental improvement through remodeling of old apartment complex (노후 임대아파트단지 리모델링을 통한 노인거주환경개선효과에 관한 연구)

  • Kwon, Soonjung;Kang, Hyojin;Oh, Ga Young;Kim, Seok Jun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.23 no.4
    • /
    • pp.93-104
    • /
    • 2017
  • Purpose: Korean society has already entered an aged society but there aren't many evidence-based studies on the elderly-friendly design elements in the apartment environment, which is the main residential type in Korea. The main purpose of this study is to verify the necessity and expandability of the outdoor environment design in the public rental apartment complex through the evaluation of the effectiveness and satisfaction of SMG(Seoul Metropolitan Government) Cognitive Health Design Project in GR 1 apartment complex. Methods: The research subjects were GR 1-complex as experimental group and the nearby Wolgye Deer 1-complex as control group, both public rental apartment and located in Seoul. As a research method, the survey was conducted before and after the implementation of SMG project for residents of the apartment. A total of 200 preliminary surveys and 203 post surveys were conducted. Results: As a result of this study, residents' accidents related safety have decreased, and both the frequency of use and satisfaction of most facilities have increased. It is noteworthy that the increase in cognitive items in the post-survey. Also, 74.5% of the residents evaluated that the complex was better to live after the project was implement. Implications: The fact that the preliminary surveys were not conducted for the same person is considered as the limitation of the study, but it is meaningful in that it systematically assesses the effectiveness of the project on the cognitive health of the outdoor residential environment towards age-friendly city.

The Residents' Perceptions on the Revitalization Project of Rural Centers Utilizing IPA - The Case of Janggye-myeon of Jangsu-gun - (IPA를 활용한 농촌중심지 활성화 사업에 대한 거주민 인식 - 장수군 장계면을 중심으로 -)

  • Kim, Young-Jin;Son, Yong-hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.3
    • /
    • pp.133-145
    • /
    • 2017
  • The purpose of this study is to assess residents' perception of the revitalization projects of the rural center and to evaluate their views of the projects' importance and their levels of satisfaction with how they have been carried out. In this study, we measured the residents' perceptions and preferences regarding these projects by using Importance-Performance Analysis (IPA). Results showed that residents' perceptions and satisfaction were the highest for the projects providing welfare facilities, even though this project has little relevance to the overall project goal. Residents were dissatisfied with construction projects such as the building of cultural facilities and urban parks, even while recognizing their importance. It is necessary to establish what problem the people perceive and to manage them appropriately. Next, the residents did not appreciate the community empowerment projects, nor did they evaluate the contents of the program positively. It can therefore be seen that the community empowerment projects have not been carried out well. Finally, the street landscape improvement project was not successfully implemented compared to other projects. The residents have negatively perceived the installation of facilities that they do not want, rarely use, or are poorly operated. this shows that the evaluation of residents is significant. They become the users of the revitalization project for the rural center. It is necessary to overcome problems such as project items chosen by professionals without local consultation and obvious design in the revitalization project of the local center. There is a need to ascertain the residents' opinion of each project and to encourage them to participate directly in the management operation.

A Study on the Environmental Friendly Noise and Vibration Management Method for the Construction Project (건설사업의 소음 $\cdot$ 진동 관리방안에 관한 연구)

  • Ko Kwang-il;Kim In-ho;Seo Sang-wook;Lee Chan-sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.110-117
    • /
    • 2004
  • The environmental-related disputes and claims are steeply increasing recently. Among them the number of disputes and claims on noise and vibration incurred in the process of construction is more than $85\%$. Since those disputes and claims cause cost overrun and or penalty and bad impression for the construction company, it is necessary to develop a systematic management method for solving them. This study presents a environmental management structure based on the examining many kinds of environmental-related laws including 'The Act on Regulation of Noise and Vibration' furthermore, through analysing various dispute and claim cases, and surveying literatures we suggest environmental study noise and vibration management method using for the preconstruction phase, the construction phase and the post construction phase, respectively.

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF

Consistency Analysis between Predicted and Measured PM10 and NO2 Air Quality During Environmental Impact Assessment of Linear Construction Projects (선형사업에 대한 환경영향평가 시 대기질 예측치와 실측치의 정합성 분석 - PM10과 NO2를 중심으로 -)

  • No Ol, Lim;Hyun Chan, Sung;Sun Jeong, Kim;Ji Young, Kim;Seong Woo, Jeon
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.6
    • /
    • pp.378-387
    • /
    • 2022
  • Since air pollution has become a global issue to be managed, the Republic of Korea (ROC) is protecting air quality by predicting the air condition before a construction project starts through EnvironmentalImpact Assessment (EIA) and measuring the air condition afterwards the construction project ends through Post-environmental Impact Assessment (PEIA). The aim of this study consists on verifying the predicted and measured concentration data and analyzing their consistency in order to deduce improvement directions. Linear EIA projects which the investigation during operation period have been concluded between years 2017 and 2019 were used. As a result, the following improvement directions were suggested: reduction of EIA air quality standards, strengthen the management of projects with construction duration longer than 5 years, incorporation of first or second quarter (winter or spring) into the investigation period, consideration of construction equipment or conditions for better prediction. The strength of this study is that we arranged and utilized EIA predicted and PEIA measured data to understand the present EIA procedure and made meaningful suggestions through the consistency analysis contributing to air quality maintenance and investigation methodology enhancement.

Status of Government Funded Projects for "Laboratory Safety" ('연구실 안전' 관련 정부연구개발사업 동향 분석)

  • Suh, Jiyoung;Kim, Hyemin;Bae, Sunyoung;Park, Jeongim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.31 no.4
    • /
    • pp.396-416
    • /
    • 2021
  • Objectives: This study was conducted to analyze the trends of government R&D (R&D) projects related to laboratory safety over the past 20 years. Methods: We collected publications from various databases(DBs) with words such as laboratory(ies), lab(s), researcher(s), laboratory worker(s), safety, environment, hazard(s), risk(s), and so on. Selected publications were analyzed by the research funds and the number of projects according to the investment subject and research characteristics. Results: About 93% of the total R&D budget went to government policy projects, not scientific research. Second, from the perspective of 'safety management activities', most of the research is related to management and inspection at the organizational level. Issues that need to be discussed at the national level like policy governance are not included. Third, focusing on the 'safety management cycle', there were few studies related to 'prediction' or 'post-response'. Fourth, when an analysis framework combining the perspectives of 'safety management activities' and 'safety management cycle' is applied, most of the budget is spent on infrastructure such as digital management systems, whereas basic knowledge for prevention and production of evidence was very few. Conclusions: In order to prevent policy planning without policy evaluation, implementation without strategy, and evaluation without evidence, it is necessary to expand investment in empirical research on risks, research on the effectiveness of current application methods, and research on theory development. The government budget for laboratory safety-related projects should be managed separately from the R&D budget for scientific research. Although less than 5% of the budget allocated to scientific research is the total budget, an optical illusion occurs because both the project budget and the scientific research budget are counted as R&D budgets.

A Preliminary Study on the Status and Improvement of the Environmental Assessment of Coastal Erosion in Korea (해안침식 환경평가 현황 및 개선방안 연구)

  • Cho, Kwang-Woo;Maeng, Jun-Ho;Shin, Hyun-Hwa;Joo, Yong-Jun
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.2
    • /
    • pp.174-181
    • /
    • 2009
  • The present study is a preliminary attempt to effectively incorporate the environmental issue of coastal erosion into the environmental assessment process of Korea. We assess the status of the environmental assessment on coastal erosion for the previous development plans and provide potential directions for the improvement. The considerable project plans should be screened for the impact of coastal erosion, which occupies about 20% of the total project plans reviewed, and the ratio increased with project scale. In addition to screening process, most process including scoping, baseline study, impact assessment, and follow-up need to be improved. The potential directions of improvement are provided in terms of appropriate guideline development, employment of cumulative impact assessment, follow-up improvement and rearrangement of the preparation regulation of environmental assessment. Emphasis is given for follow-up process to review post-monitoring period, to employ science compensation, and to consider the establishment of relevant institution. Final suggestion is made for the establishments of comprehensive national plan to manage coastal erosion and streamlined environmental process from strategic to project levels based on the national plan.

Methodological Status and Improvement of Additional Evaluation of Health Impact Items in Environmental Impact Assessment (환경영향평가서 내 건강영향 항목 추가·평가의 방법론적 현황과 개선)

  • Ha, Jongsik
    • Journal of Environmental Impact Assessment
    • /
    • v.29 no.6
    • /
    • pp.453-466
    • /
    • 2020
  • The addition and evaluation of health impact items in Environmental Impact Assessment document are written in hygiene and public health items only for specific development projects and are being reviewed. However, after the publication of the evaluation manual on the addition and evaluation of health impact items in 2011, there is a demand for continuous methodology and improvement plans despite partial improvement. Therefore, in order to propose a methodological improvement of the evaluation manual, this technical paper identified detailed improvement requirements based on the consultation opinions on hygiene and public health items, and investigated and suggested ways to solve this problem by reviewing the contents of the research so far. As for the improvement requirements, the contents related to mitigation plan, post management, effect prediction, assessment, and present-condition investigation were presented in Environmental Impact Assessment documents for the entire development project at a frequency of 93%, 85%, 80%, 74%, and 67%, respectively. Particularly, the detailed improvement requirements related to mitigation plan consisted of an establishment direction and a management of development project. Considering the current evaluation manual and the frequency of improvement requirements, this paper proposed concrete methods or improvement plans for major methodologies for each classification of hygiene and public health items. Furthermore, a comprehensive evaluation methodology related to whether a project is implemented was proposed, which is not provided in the current assessment manual.

Sediment Unit Loads from Developing Areas during Storms (개발사업장에서의 강우시 토사 유출원단위 산정)

  • Kim, Cheol Min;Lee, Eun Ju;Lee, So Young;Kim, Young Chol;Kim, Lee Hyung
    • Journal of Wetlands Research
    • /
    • v.10 no.1
    • /
    • pp.59-68
    • /
    • 2008
  • Three phases of development in construction projects (i.e. pre-development, construction and post construction) diversely effect the environment, hydraulics and ecosystem. Currently, the domestic environmental policy is in control of the various environmental hazards produced after completion of development operations. Nevertheless, with the enforcement of water pollution total amount management system, improving the water quality; also the water and ecosystem preservation law recommends enforcing the sediment management for development operations in order to lessen the negative impacts to the environment. Recently, the country is experiencing difficulties in various development project locations due to insufficiency of interpreting the fundamental data for sediment loss and miscalculation of soil loss unit loads of sediment. This research utilizes data from 2000 to 2005 discussing a total of 1,036 environment impact assessment projects gathered from various ministries and offices namely Ministry of Environment (MOE), Ministry of Agriculture, the Office of Forestry, and Ministry of Construction and Transportation. Moreover, quantity of sediment from high land agriculture reports involving contaminant discharge characteristic investigation previously did concerning old land agriculture and So-Yang lake non-point pollution source management area as well as management measured data from MOE. The findings of this study reveal that the highest soil loss rate occurred from mountain district for pre-development and post construction and sports facility during construction.

  • PDF