건설공사 사후평가 제도 활성화 방안 수립 (Strategies for Facilitating Post-Construction Evaluation and Management System)

  • 이강욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

건설공사 사후평가결과보고서 표준화 방안 (Standardization for Post-Construction Evaluation Report)

  • 김경훈;이찬규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

건설공사 사후평가시스템 입력오류 분석에 관한 연구 (A Study of Error Analysis for Post Evaluation System on the Construction Projects)

  • 김경훈;이두헌;김태영
    • 한국건설관리학회논문집
    • /
    • 제16권2호
    • /
    • pp.77-85
    • /
    • 2015
  • 현재 건설공사 사후평가시스템 입력과정에서 자료가 오류 및 누락이 발생되는 경우가 많아 데이터의 신뢰성이 떨어지는 경우가 많다. 이에 따라 본 연구에서는 사후평가 결과분석의 신뢰성 확보를 위해 건설공사 사후평가시스템의 입력누락 및 입력오류에 대한 세부적인 분석을 실시하였다. 분석결과, 건설사업 초기 단계일수록 자료의 미입력된 자료의 비중이 높게 나타났다. 그리고 분석된 등록오류로는 참고자료의 부정확, "원" 단위 오류, 입력항목에 대한 이해부족 등으로 나타났다.

선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발 (Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries)

  • 이강욱
    • 한국산업융합학회 논문집
    • /
    • 제25권6_2호
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

건설공사 사후평가 수행결과 활용도 개선 방안 (Improvement scheme of utilization of the results of the post-construction evaluation system)

  • 이두헌;박재우
    • 한국건설관리학회논문집
    • /
    • 제14권6호
    • /
    • pp.78-89
    • /
    • 2013
  • 건설공사 사후평가 제도는 공공건설사업 수행결과를 반영하여 향후 유사한 공공건설사업의 계획 수립 시 활용되어져야 하나, 현행 제도는 당초 기획 계획 당시에 추정한 수요, B/C비율, 공사비, 공사기간 등 예측치와 건설공사 완공후 일정기간(3년 내지 5년) 경과후에 측정한 실제 결과치를 단순히 비교하여 제시하는 수준에 그치고 있다. 또한 대부분 공공발주기관에서는 수동적인 사후평가 업무수행에 그치고 있어 제대로 환류가 이루어지않고 있다. 이에 본 연구에서는 공공발주기관을 대상으로 설문조사를 실시하여 건설공사 사후평가 제도의 수행현황을 파악하였으며, 국내 사후평가 제도와 유사한 미국과 일본의 건설사업 평가체계를 벤치마킹하였다. 또한, 건설공사 사후평가 제도와 관련된 국토부 실무담당자와의 수차례 업무회의를 실시하여 사후평가 수행의 적시성 확보 및 활용성 강화방안을 제시하였다. 이와 같이 건설공사 사후평가 제도 개선을 통해 건설사업 수행과정에서의 목표 및 성과에 대한 확인 점검 분석 체계를 내실화하고, 건설공사 특성별로 평가내용 및 방법을 차등화함으로써 발주청의 사후평가 수행에 대한 실천력이 제고될 것으로 기대된다.

A STUDY ON THE IMPROVEMENT OF POST-EVALUATION ITEM FOR PERFORMANCE MEASUREMENT IN THE BUILDING CONSTRUCTION

  • Lee, Eun-Ji;Ha, Hee-Yoon;Ko, Hyun;Kim, Jae-won;Kim, Jae-Jun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.407-416
    • /
    • 2007
  • The construction industry in South Korea is experiencing great changes: it is becoming developed on a larger scale, specialized to a high degree and rapidly incorporating with other industries. This development has resulted in higher demand of construction industry. Accordingly, the transparency and an objective method of evaluation in the process of projects in the construction industry are gaining more importance. Clients' and customers' needs also require more specific objective evaluation to find whether their projects are successfully performed or not. This study aims to discuss problems on the current post-evaluation items including the qualitative item analysis such as customer satisfaction. Moreover, this paper suggests the improved ways in which enable the application of the effective evaluation system to the construction industry.

  • PDF

도로비탈면 녹화공사의 사후환경평가 항목 제언 (Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works)

  • 김태국;김남춘;김은범;구민규
    • 한국환경복원기술학회지
    • /
    • 제21권4호
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

POST-OCCUPANCY EVALUATION (POE) AFTER THE EXPANSION OF AN APARTMENT PARKING LOT

  • Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1559-1563
    • /
    • 2009
  • Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.

  • PDF

건설공사 사후평가 전문기관 설치 필요성 연구 (A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects)

  • 이두헌;박희성
    • 대한토목학회논문집
    • /
    • 제36권2호
    • /
    • pp.285-295
    • /
    • 2016
  • 건설공사 사후평가 제도는 공공건설사업의 계획단계에서 예측한 이용수요 사업비 사업기간 등에 대한 예측치를 준공 후에 평가함으로써, 차후 유사사업 추진 시 그 평가결과를 참고하여 발주청의 시행착오를 줄이기 위한 목적으로 2000년도에 도입되었다. 그러나 객관성 및 신뢰성이 결여된 평가 수행체계 및 부재한 활용주체로 인하여 건설공사 사후평가 제도 정착 및 활성화에 걸림돌이 되고 있다. 이에 본 연구에서는 선진외국의 건설사업 평가수행 및 관리 활용 체계를 벤치마킹하여 국내 사후평가 체계 개선을 위한 시사점을 도출하였고, 공공 발주청 사후평가 담당자 및 사후평가위원회 활동경험이 있는 전문가를 대상으로 설문조사를 실시하여 사후평가 전문기관 설치의 필요성 및 전문기관에서 담당해야 할 기능 및 업무내용 등을 도출하였다. 도출된 분석결과를 바탕으로 최종적으로 본 연구결과가 실효성이 확보될 수 있도록 관련 법령 및 지침 개정안을 마련하였다. 본 연구 결과를 통해 향후 전문기관이 설치된다면 대규모 건설사업 시행과정을 면밀히 분석하여 차후 유사사업 수행 시에 많은 시행착오를 줄일 수 있으며, 관행적 반복적으로 적용되는 건설사업 수행방식을 개선하여 기술경쟁력이 제고될 수 있다.

공공공사 사후평가의 사용자 만족도 평가모델에 대한 기초연구 (A Foundation Study for User Satisfaction Degree's Estimated Model of Post-Evaluation in the public construction)

  • 김재우;조창연;신태홍;권순욱;김예상;진상윤
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.432-435
    • /
    • 2008
  • 건설공사의 품질을 확보하고 예산의 절감을 도모하는 등 건설 프로젝트의 성공 여부를 판단하기 위해서는 객관적인 평가지표와 그에 대한 투명성 확보가 필요하다. 건설부문을 포함한 공공사업의 경우 대규모 예산투입이 이루어지고 있지만 그 결과물로 인한 편익을 산정하기 어려울 경우가 많아 공공사업의 효율성과 효용성이 떨어진다고 인식되고 있다. 따라서 본 연구에서는 500억 원 이상의 공공공사 중 사후평가를 실시하는 시설물에 대한 소비자 만족도를 정량화하는 것을 범위로 하여, 공공공사 사후평가 시 체계적이고 정량적인 측정이 가능할 수 있도록 주민 호응도와 사용자 만족도 항목을 중심으로 하는 사후평가 측정기준을 제안하고자 한다.