• 제목/요약/키워드: Plant performance

검색결과 3,370건 처리시간 0.034초

원전 터빈사이클 성능 데이터의 검증 모델에 의한 성능분석 기법의 개발 (Development of Performance Analysis Methodology for Nuclear Power Plant Turbine Cycle Using Validation Model of Performance Measurements)

  • 김성근;최광희
    • 대한기계학회논문집B
    • /
    • 제24권12호
    • /
    • pp.1625-1634
    • /
    • 2000
  • Verification of measurements is required for precise evaluation of turbine cycle performance in nuclear power plant. We assumed that initial acceptance data and design data of the plant could provide correlation information between performance data. The data can be used as sample sets for the correct estimation model of measurement value. The modeling was done practically by using regression model based on plant design data, plant acceptance data and verified plant performance data of domestic nuclear power plant. We can construct more robust performance analysis system for an operation nuclear power plant with this validation scheme.

SIEMENS DCS 환경에서 화력발전소 성능감시 시스템 구현 (Implementation of Performance Monitoring System for Thermal Power Plant in SIEMENS DCS)

  • 김승민;문태선;조창호
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.37-37
    • /
    • 2000
  • This paper introduces the Performance Monitoring System(PMS) in a thermal power plant. The purpose of the PMS is to offer the operator current performance information of plant which could be an index of plant status or information to improve plant efficiency. The PMS of Bukcheju thermal power plant unit #2&3 is implemented under the SIEMENS DCS which supplies about 150 function blocks for performance calculation and all measured signals. The performance of unit, boiler, turbines, feedwater heaters, condenser, airpreheaters, feedwater pumps will be monitored and updated for every 5 minutes in PMS of Bukcheju TPP.

  • PDF

Performance Prediction of a Combined Heat and Power Plant Considering the Effect of Various Gas Fuels

  • 주용진;김미영;박세익;서동균
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제3권2호
    • /
    • pp.133-140
    • /
    • 2017
  • The performance prediction software developed in this paper is a process analysis tool that enables one to foretell the behavior of processes when certain conditions of operation are altered. The immediate objective of this research is to predict the process characteristics of combined heat and power plant under varying operating conditions. A cogeneration virtual power plant that mimics the mechanical performance of the actual plant was constructed and the performance of the power plant was predicted in the following varying atmospheric conditions: temperature, pressure and humidity. This resulted in a positive outcome where the performance of the power plant under changing conditions were correctly predicted as well as the calorific value of low calorific gas fuel such as shale gas and PNG. The performance prediction tool can detect the operation characteristics of the power plant through the performance index analysis and thus propose the operation method taking into consideration the changes in environmental conditions.

300MW 태안 IGCC 플랜트 종합성능 특성 (Overall Performance characteristic for 300MW Taean IGCC Plant)

  • 김학용;김재환
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 추계학술대회 초록집
    • /
    • pp.129.2-129.2
    • /
    • 2010
  • As a part of the government renewable energy policy, KOWEPO is constructing 300MW IGCC plant in Taean. IGCC plant consists of gasification block, air separation unit and power block, which performance test is separately conducted. Overall performance test for IGCC plant is peformed to comply with ASME PTC 46. Major factors affected on the overall efficiency for IGCC plant are external conditions, each block performance(gasification, ASU, power block), water/steam integration and air integration. Performance parameters of IGCC plant are cold gas efficiency, oxygen consumption, sensible heat recovery of syngas cooler for gasification block and purity of oxygen, flow amount of oxygen and nitrogen, power consumption for air separation unit and steam/water integration among the each block. The gas turbine capacity applied to the IGCC plant is 20 percent higher than NGCC gas turbine due to the low caloric heating value of syngas, therefor it is possible to utilize air integration between gas turbine and air separation unit to improve overall efficiency of the IGCC plant and there is a little impact on the ambient condition. It is very important to optimize the air integration design with consideration to the optimized integration ratio and the reliable operation. Optimized steam/water integration between power block and gasification block can improve overall efficiency of IGCC plant where the optimized heat recovery from gasification block should be considered. Finally, It is possibile to achieve the target efficiency above 42 percent(HHV, Net) for 300MW Taean IGCC plant by optimized design and integration.

  • PDF

Ansys를 활용한 플랜트 시설물 내화성능에 대한 해석적 연구 (Analytical Study of Fire Resistance Performance of Plant Facilities using Ansys)

  • 최두찬;양민혁;오수민;양소진
    • 한국재난정보학회 논문집
    • /
    • 제19권4호
    • /
    • pp.958-967
    • /
    • 2023
  • 연구목적: 본 연구는 화재위험도가 높은 플랜트 시설물에 적용하고 있는 국내 내화성능을 분석하고 적합한 내화저항성능을 확보하여 플랜트 시설물의 화재 안전성을 확보하고자 한다. 연구방법:유한요소해석 프로그램인 Ansys를 활용하여 화재하중과 내화피복을 변수로 열전달 해석과 구조해석을 수행하고 해석 결과에 따른 플랜트 시설물의 내화성능을 분석하였다. 연구결과: 국내 플랜트 시설물에 적용된 내화피복은 UL 1709에 제시된 탄화수소화재의 화재하중을 적용하였을 때 내화성능을 확보하지 못하였으며 화재 후 강재의 변형 또한 크게 나타남을 확인하였다. 결론:현재 플랜트 시설물에 적용된 국내의 내화성능은 석유화학 플랜트 등과 같이 급격한 화재성장과 큰 화재하중에서 내화성능을 확보할 수 없으며 플랜트 시설물의 성능평가를 통해 적합한 내화성능을 평가하여 화재 안전성을 확보하여야 한다.

설비관리 업무를 위한 성과평가 기반의 대시보드 시스템 개발 (Performance Assesment based Dashboards for Maintenance Management System)

  • 김광만
    • 대한안전경영과학회지
    • /
    • 제16권4호
    • /
    • pp.417-426
    • /
    • 2014
  • Plant management have a greatest influence on the corporate variety of tasks such as production, quality, environment. So, various performance indices for plant management are operating. But plant management tasks can be carried out effectively, so that all of how to organize and efficiently manage indicators is lacking real condition In this paper, improved profitability, cost savings by applying the concept for the performance assessment, plant management services, such as the key indices for performance according to the objectives of the firm. Dashboard for plant management work using me to develop a system that manage.

온라인 웹기반 원전 터빈 사이클 열성능 분석 시스템 (Web-Based On-Line Thermal Performance Analysis System for Turbine Cycle of Nuclear Power Plant)

  • 최기상;최광희;지문학;홍승열;김성근
    • 대한기계학회논문집B
    • /
    • 제29권3호
    • /
    • pp.409-416
    • /
    • 2005
  • We need to develop a on-line thermal performance analysis system for nuclear power plant to determine performance status and heat rate of turbine cycle. We have developed PERUPS(PERformance Upgrade System) to aid the effective performance analysis of turbine cycle. Procedures of performance calculation are improved using several adaptations from standard calculation algorithms based on PTC(Performance Test Code). Robustness in the on-line performance analysis is increased by verification & validation scheme for measured input data. The system also provides useful web interfaces for performance analysis such as graphic heat balance of turbine cycle and components, turbine expansion lines, automatic generation of analysis report. The system was successfully applied for YongGwang nuclear plant unit #3,4.

추정모델에 의한 화력발전 플랜트 계측데이터의 검증 및 유효화 (Estimation Model-based Verification and Validation of Fossil Power Plant Performance Measurement Data)

  • 김성근;윤문철;최영석
    • 한국정밀공학회지
    • /
    • 제17권2호
    • /
    • pp.114-120
    • /
    • 2000
  • Fossil power plant availability is significantly affected by gradual degradations of equipment as operation of the plant continues. It is quite important to determine whether or not to replace some equipment and when to replace the equipment. Performance calculation and analysis can provide the information. Robustness in the performance calculation can be increased by using verification & validation of measured input data. We suggest new algorithm in which estimation relation for validated measurement can be obtained using correlation between measurements. Input estimation model is obtained using design data and acceptance measurement data of domestic 16 fossil power plant. The model consists of finding mostly correlated state variable in plant state and mapping relation based on the model and current state of power plant.

  • PDF

고층 건물의 실외기실에 위치한 응축기 성능분석 (Analysis of the Condenser Performance Installed in the Air-Conditioning Plant Room of a High-Rise Building)

  • 최석호;이관수;김병순
    • 설비공학논문집
    • /
    • 제15권7호
    • /
    • pp.586-594
    • /
    • 2003
  • The performance of the condenser installed in the air-conditioning plant room of a high-rise building was studied numerically. The effect of the draft direction on the performance of an air-conditioner was analyzed. The on-coil temperature of the condenser was investigated by varying the arrangement and location o( the condenser in the air-conditioning plant room. The performance of an air-conditioner was also evaluated by using COP (coefficient of performance) and CGPI (condenser group performance indicator). The condenser in an air-conditioning plant room should be arranged in such a manner that the fan of the condenser is facing the outside of the building to exhaust the hot air directly, The model by which the condenser is located at the lower-left end of an air-conditioning plant room can prevent the hot air from reentering, and allow indrafting of fresh air. When the direction of draft is to the frontal face of the building, the performance of the condenser above 30th floor is degraded.

하수처리수를 이용한 소수력발전소 설계 및 성능예측 (Design and Performance Prediction of Small Hydropower Plant Using Treated Effluent in Wastewater Treatment Plant)

  • 이철형;박완순;김원경;김정연;채규정
    • 한국태양에너지학회 논문집
    • /
    • 제33권2호
    • /
    • pp.78-83
    • /
    • 2013
  • A methodology to predict the output performance of small hydro power plant using treated effluent in waste water treatment plant has been studied. Existing waste water treatment plant located in Kyunggi-Do were selected and the output performance characteristics for these plants were analyzed. .Based on the models developed in this study, the hydrologic performance characteristics for SHP sites have been analyzed. The results show that the flow duration characteristics of small hydropower plant for waste water treatment plant have quite differences compared with small hydropower plant for the river. As a result, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power in waste water treatment plant. Additionally, primary design specifications such as design flowrate, capacity, operational rate and annual electricity production were estimated and discussed. It was found that the models developed in this study can be used to decide the design performance of small hydropower plant for waste water treatment plant effectively.