• 제목/요약/키워드: Plant control system

검색결과 2,983건 처리시간 0.03초

화력 발전소 보일러 제어 시스템의 구성에 관한 연구 (Configuration of a Boiler Control System in Thermal Power Plant)

  • 변승현;박두용;김병철;신만수
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.168-168
    • /
    • 2000
  • In this paper, a boiler control system for thermal power plant is configured. The boiler control system for thermal power plant is largely composed of an ABC(Automatic Boiler Control) system and a MBC(Mill Burner Control) system. ABC system controls analog process values, so almost all analog control logic is dealt with in ABC system. On the other hand, MBC system relates to sequence control logic such as MFT logic, Furnace Purge, Safety related logic. Advanced control systems made from advanced countries deal with an ABC system and MBC system in a distributed control system. In this paper, we adopt a DCS as an ABC system and adopt a PLC system as a MBC system to configure a boiler control system for thermal power plant using domestic control system. Finally the validity of the configured boiler control system is shown via simulation using digital simulator for boiler system in thermal power plant.

  • PDF

영광 3,4호기 Foxboro 제어시스템 모델링 및 시뮬레이션 (Modeling and simulation of foxboro control system for YGN#3,4 power plant)

  • 김동욱;이용관;유한성
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1997년도 한국자동제어학술회의논문집; 한국전력공사 서울연수원; 17-18 Oct. 1997
    • /
    • pp.179-182
    • /
    • 1997
  • In a training simulator for power plant, operator's action in the MCR(Main Control Room) are given to plant process and computer system model as an inputs, and the same response as in real power plant is provided in real time. Inter-process communication and synchronization are especially important among various inputs. In the plant simulator, to simulate the digital control system such as FOXBORO SPEC-200 Micro control system, modification and adaptation of control card(CCC) and its continuous display station(CDS) is necessary. This paper describes the modeling and simulation of FOXBORO SPEC-200 Micro control system applied to Younggwang nuclear power plant unit #3 & 4, and its integration process to the full-scope replica type training simulator. In a simulator, display station like CDS of FOXBORO SPEC-200 Micro control system is classified as ITI(Intelligent Type Instrument), which has a micro processor inside to process information and the corresponding alphanumeric display, and the stimulation of ITI limits the important functions in a training simulator such as backtrack, replay, freeze and IC reset. Therefore, to achieve the better performance of the simulator, modification of CDS and special firmware is developed to simulate the FOXBORO SPEC-200 Micro control system. Each control function inside control card is modeled and simulated in generic approach to accept the plant data and control parameter conveniently, and debugging algorithms are applied for massive coding developed in short period.

  • PDF

태양열발전 제어시스템 (A Control System for Solar Thermal Power Plant)

  • 박영칠
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.693-697
    • /
    • 2007
  • A control system for solar thermal power plant is the control system to coordinate the whole system's operation, including management of distributed control systems, process control for optimal operation of total system, monitoring system operating conditions and doing administrative functions. This work, as a progress report, presents the results obtained so far in building a control system for the 1MW solar thermal power plant. To make the control system, we first defined the control system's hierarchy and classified the role of each layer. Then, as the first stage of making control system, we designed and developed the sun tracking control system for heliostat.

  • PDF

석탄화력발전소 보일러 연료제어 알고리즘과 분산제어시스템의 개발 (The Development of Boiler Fuel Control Algorithm and Distributed Control System for Coal-Fired Power Plant)

  • 임건표;이흥호
    • 전기학회논문지P
    • /
    • 제62권1호
    • /
    • pp.36-44
    • /
    • 2013
  • This paper is written for the development and application of boiler fuel control algorithm and distributed control system of coal-fired power plant by the steps of design, coding, simulation test, site installation and site commissioning test. Fuel control algorithm has the upper algorithm and it is boiler master control algorithm that controls the fuel, feed water, air by generation output demand. Generation output demand by power load influences fuel control. Because fuel can not be supplied fast to the furnace of boiler, fuel control algorithm was designed adequately to control the steam temperature and to prevent the explosion of boiler. This control algorithms were coded to the control programs of distributed control systems which were developed domestically for the first time. Simulator for coal-fired power plant was used in the test step. After all of distributed control systems were connected to the simulator, the tests of the actual power plant were performed successfully. The reliability was obtained enough to be installed at the actual power plant and all of distributed control systems had been installed at power plant and all signals were connected mutually. Tests for reliability and safety of plant operation were completed successfully and power plant is being operated commercially. It is expected that the project result will contribute to the safe operation of domestic new and retrofit power plants, the self-reliance of coal-fired power plant control technique and overseas business for power plant.

Supplementary Control of Conventional Coordinated Control for 1000 MW Ultra-supercritical Thermal Power Plant using Dynamic Matrix Control

  • Lee, Youngjun;Yoo, Euiyeon;Lee, Taehyun;Moon, Un-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권1호
    • /
    • pp.97-104
    • /
    • 2018
  • This paper proposes supplementary control of conventional coordinated control of a power plant which directly affects network frequency. The supplementary control with dynamic matrix control is applied for 1000 MW power plant with ultra-supercritical (USC) once-through boiler. The supplementary control signal is added to the boiler feedforward signal in the existing coordinated control logic. Therefore, it is a very practical structure that can maintain the existing multi-loop control system. This supplementary controller uses the step response model for the power plant system, and on-line optimization is performed at every sampling step. The simulation results demonstrate the effectiveness of the proposed supplementary control in a wide operating range of a practical 1000 MW USC power plant simulator. These results can contribute the stable operation of power system frequency.

발전소 제어 시스템 유지보수 방향 (Maintenance and repair of power plant control system)

  • 이종희;하달규
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1987년도 한국자동제어학술회의논문집; 한국과학기술대학, 충남; 16-17 Oct. 1987
    • /
    • pp.625-630
    • /
    • 1987
  • Technology associated with power plant control system has been heavily rely on foreign technology. The main reason is that the system has tomaintain stringent reliability and stability. Localization of this system can be started from localization of modules necessary for maintenance and repair in hydraulic and thermal power plant. Gradually and eventually system engineering capability can be built up to design and develop nuclear power plant control system through technology accumulation. Methods are presented to achieve this goal.

  • PDF

제어 검증용 발전소 시뮬레이터 개발 (Development of Power Plant Simulator for Control System Verification & Validation)

  • 변승현;황도현
    • 한국시뮬레이션학회논문지
    • /
    • 제19권1호
    • /
    • pp.41-51
    • /
    • 2010
  • 500MW급 초임계압 표준 석탄 화력 발전소에의 실증 적용을 목표로 국산 분산제어시스템의 개발 연구가 진행되고 있다. 시뮬레이터는 원자력발전소의 디지털 제어시스템 업그레이드나 아날로그 제어 시스템의 디지털 제어시스템으로의 개체시 제어 시스템의 검증용으로 활용되고 있으며, 국내에서도 중용량 석탄 화력 보일러 제어 시스템 검증에 활용된 바 있다. 본 논문에서 는 500MW급 표준 석탄 화력 발전소에의 적용을 목적으로 개발 중인 제어 시스템을 검증하기 위해 제어 검증용 시뮬레이터를 개발하였다. 제어 검증을 위한 제어 모델을 개발하는데 있어서 현장 제어 시스템 데이터와 시뮬레이션 개발 환경에서 현장 데이터를 활용가능하게 하는 변환 프로그램, 제어 시스템 제작사 매뉴얼에 기반하여 제어 모델을 개발하였다. 개발한 시뮬레이터는 열평형상태시험, 부하변동 시험, 고장모사시험 등을 통하여 효용성을 확인하였으며, 개발 중인 제어 시스템을 검증하고, 기존 제어 시스템의 분석 및 개선에 유용하게 활용할 수 있을 것으로 기대한다.

한국표준형 초 임계압 관류형 보일러의 급수제어 (Feed Water Flow Control of Super Critical Once Through Boiler in Korea Standard Power Plant)

  • 김은기;장용창;조수현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.251-251
    • /
    • 2000
  • Tangjin Power Plant is modern Korean standard plant which is made up Once Through Super Critical Boiler, Turbin, Generator and Flue Gas Desulfarization System. INFI-90 system fur control of the 500 MW Korean standard super critical once through boiler Mark-V for Turbine, EX-2000 fer Generator, WDPF for FGD were installed in Tangiin thermal power plant. There were two BFPTs, BFPM, 25% control valve, 35% control valve to control boiler feed water flow. It is very difficult to tune the Separator Tank level control system and change the mode from Wet to Dry. This paper focuses on test results and modification control logic for feed water control system in Tangjin power plant.

  • PDF

발전소 보일러 제어기에 대한 내고장성 제어 시스템의 적용에 관한 연구 (A Case Study on Application of Fault Tolerant Control System to Boiler Controller in Power Plant)

  • 조영조;문봉채;김병국
    • 대한전자공학회논문지
    • /
    • 제27권1호
    • /
    • pp.10-19
    • /
    • 1990
  • A fault tolerant control system, in which a digital back-up controller system is added on the existing analog control system, is developed for enhancing reliability of boiler control system in power plant. The digital back-up controller system(DBCS) has a multi-processor structure with capabilities of fault diagnosis, back-up control, self test, and graphic monitoring. Specifically, switching mechanism composed of expandable modules is designed so that back-up controller takes over any faulty control loops and the number of back-up control loops is determined as that of simultaneous faults. A process simulator that simulates the boiler analog control system is developed for safety test and performance evaluation prior to real plant application. DBCS is installed at the Ulsan thermal power plant, and fault tolerant control performance is assured under the faults that some controller modules are pulled out.

  • PDF

조력발전용 수차발전기의 기동·정지시스템에 관한 연구 (A Study on Start·Stop System at Water Turbine-Generator for Tidal Power Plant)

  • 오민환;박철원
    • 전기학회논문지P
    • /
    • 제63권2호
    • /
    • pp.113-118
    • /
    • 2014
  • Tidal power is one of new and renewable energy sources. Tidal power is generated by using the gap in the water level between the water outside and inside the embankment. All tidal power plant in Korea were being operated by import of turn-key from abroad. The know-how and technology which are the most important to build predictive control system has become increasingly difficult to obtain from advanced countries because most of them avoid to transfer, which the domestic development of the control system is needed. In this paper, a study on start stop system at water turbine-generator for tidal power plant at the beginning of development was presented. For improvement the efficiency and develope of core technology of the start stop system, the technique and characteristics of tidal power, modeling, maximum generation calculation method, and optimal control of joint control system in Sihwa tidal power plant were studied.