SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로 (Development of An Information System for SOC Projects)

  • 윤은상;이화기
    • 산업경영시스템학회지
    • /
    • 제26권2호
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.

LNG 플랜트 로지스틱스 단계의 효율적 정보관리를 위한 메타데이터 시스템 적용 방안 (Application of Metadata System for Efficient Information Management in Logistics of LNG plant)

  • 최창훈;원서경;한충희;이준복
    • 한국건설관리학회논문집
    • /
    • 제17권1호
    • /
    • pp.92-100
    • /
    • 2016
  • 다양한 분야에서 방대한 데이터를 효율적으로 정확하게 처리하고 데이터 처리 오류 및 처리속도를 최소화하기 위한 시스템을 적용하기 위하여 연구와 노력이 진행되고 있다. 이에 이 논문에서는 생애주기 전반에 걸쳐 방대한 데이터가 생성되는 LNG 플랜트 프로젝트 중 공사원가의 65~70% 이상을 차지하는 구매조달 단계의 Logistics 업무를 대상으로 업무 간 생성되는 데이터에 메타데이터를 적용함으로써 정보 검색 시 데이터 처리 오류 및 처리속도를 최소화할 수 있는 메타데이터 시스템을 적용하였다. 이러한 메타데이터 시스템을 통하여 정보 검색 시 시스템 사용자가 필요한 정보에 보다 정확하고 빠르게 접근할 수 있다

위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구 (A Study on the Effects of Risk Perception and Opportunism on the Project Performance)

  • 윤창수;조동혁
    • 품질경영학회지
    • /
    • 제50권1호
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.

지식경영을 위한 사례기반추론 시스템의 설계 및 구축 : 'H'기업의 플랜트 건설 프로젝트 적용사례 (Design and Implementation of Case-Based Reasoning System for Knowledge Management : The Case Study of Plant Construction Division of 'H' Cooperation)

  • 장길상
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제18권3호
    • /
    • pp.231-249
    • /
    • 2009
  • Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing case-based reasoning(CBR) system for managing knowledge like lessons learned and various documents accumulated in performing power plant construction projects which are receiving a lot of order from foreign countries such as the Middle East, etc. Our methodology is consisted of 10 steps : user requirement gathering, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface implementation, integration test. Also, to illustrate the effectiveness of proposed methodology, the real CBR system is implemented for the plant business division of 'H' company which has international competitiveness in the field of plant construction industry. At present, the implemented CBR system is successfully utilizing as storing, sharing, and reusing knowledge which is accumulated in performing power plant construction projects in the target enterprise.

  • PDF

EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발 (Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects)

  • 김동희;하민희;최재현
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.76-84
    • /
    • 2020
  • 플랜트 산업의 대형화, 복잡화 추세에 따라 플랜트 프로젝트의 수행효율을 극대화하기 위해 모듈러 플랜트의 적용비율이 높아지고 있다. 모듈러 프로젝트의 성공적인 수행을 위해서는 사업수행 전 단계에 걸친 사업수행 전략 수립 및 이행이 필수적이다. 그러나 국내 건설업체는 플랜트 사업관리기술의 정립이나 적용이 미비한 실정으로 특히 사업관리 기술의 핵심요소로써 원가와 공정의 통합관리 방법을 정립하고 체계화 하는 것이 필수적이다. 본 연구는 모듈러 플랜트 프로젝트의 원가와 공정을 통합관리하기 위한 방법론 및 지침서 개발을 목적으로 수행되었다. 모듈러 공법의 일반적인 사항, 원가·공정관리의 업무절차에 대한 이론적 고찰을 토대로 원가관리 방법론, 공정관리 방법론을 개발하고 원가·공정을 모듈단위로 통합관리 할 수 있는 방법론과 지침서를 개발하였다. 모듈러 플랜트 프로젝트에 특화된 원가·공정 통합관리 방법론 및 지침서의 적용을 통해 프로젝트 관리의 효율성을 높일 수 있을 것으로 판단된다.

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

Gas & Oil 플랜트 조달관리 프로세스 분석 (Analysis of the Procurement Management Process for the Gas & Oil Plant projects)

  • 원서경;강민우;이준복;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.491-494
    • /
    • 2007
  • 국제 고유가에 힘입어 최근 중동의 산유국 중심으로 신규 사업 잘주가 이어지고 있다. 플랜트 산업은 엔지니어링(Engineering)과 조달(Procurement), 시공(Construction)이 융합된 복합산업(EPC)으로 고부가가치 산업이다. 또한 조달부문이 전체 사업비 규모의 70% 이상을 차지하므로 구매조달의 성패가 사업의 성패로까지 이어진다. 그러나 해외에서 다양한 사업참여 주체에 의해 수행되는 사업특성 상 구매조달 업무흐름 전체를 파악하고 원활히 사업을 수행하기란 어려운 실정이다. 따라서 최근 구매 및 조달 업무의 합리화를 통한 이윤창출 노력이 이어지고 있다. 본 연구에서는 해외 프로젝트를 수행하는 국내 주요 건설회사의 기존 구매조달 업무프로세스를 조사${\cdot}$분석하여 적정프로세스를 도출하였다. 또한 업무 프로세스상의 정보 및 문서의 입출력 정보를 분석하였다. 본 연구의 결과는 향후 해외 사업에 참여하게 되는 신규 업체의 인력 교육과 실무 활용에 이해를 도울 수 있는 자료로 활용될 수 있을 것으로 기대하며, 구매조달 업무 시스템 개발을 위한 자료로 활용될 수 있을 것이다.

  • PDF

플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구 (Improved Scheme to Manage Engineering Man-hour in a Plant Project)

  • 신지로;문승재;이재헌
    • 플랜트 저널
    • /
    • 제5권1호
    • /
    • pp.51-59
    • /
    • 2009
  • The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

  • PDF

국내외 수전해 기술 및 대규모 실증 프로젝트 진행 현황 (Current Status of Water Electrolysis Technology and Large-scale Demonstration Projects in Korea and Overseas)

  • 백종민;김수현
    • 한국수소및신에너지학회논문집
    • /
    • 제35권1호
    • /
    • pp.14-26
    • /
    • 2024
  • Global efforts continue with the goal of transition to a "carbon neutral (net zero)" society with zero carbon emissions by 2050. For this purpose, the technology of water electrolysis is being developed, which can store electricity generated from renewable energies in large quantities and over a long period of time as hydrogen. Recently, various research and large-scale projects on 'green hydrogen', which has no carbon emissions, are being conducted. In this paper, a comparison of water electrolysis technologies was carried out and, based on data provided by the International Energy Agency (IEA), large-scale water electrolysis demonstration projects were analyzed by classifying them by technology, power supply, country and end user. It is expected that through the analysis of large-scale water electrolysis demonstration projects, research directions and road maps can be provided for the development/implementation of commercial projects in the future.

지식 기반 플랜트 건설 공정 계획 시스템의 개발 (A Knowledge-based Approach to Plant Construction Process Planning)

  • 김우주
    • 지능정보연구
    • /
    • 제7권1호
    • /
    • pp.81-95
    • /
    • 2001
  • 플랜트 건설 프로젝트는 다른 분야의 프로젝트에 비하여 상대적으로 높은 불확실성과 위험을 수반하게 되며, 이는 정확한 플랜트 건설 프로젝트의 관리가 프로젝트의 성공에 있어 매우 중요해진다는 것을 의미한다. 특히 프로젝트 관련 초기 단계에서 이루어지는 공정 계획과 일정 계획 작업의 성패가 곧 전체 플랜트 건설 프로젝트 수행의 성패를 결정하는 주요한 요인으로 인식되고 있다. 그럼에도 불구하고 대부분의 플랜트 건설 사업은 그 특유의 비구조성과 환경의 역동성으로 인해 적시에 정확하고 체계적인 공정 및 일정 계획 수립을 수행하고 있지 못한 실정이다. 따라서 본 연구에서는 이와 같은 문제점을 해결하기 위하여 첫째, 플랜트 건설에 필요한 공정 지식을 모듈화하고, 둘째, 플랜트 건설 문제의 체계적 표현 방법을 마련하였으며, 셋째, 문제에 따라 필요한 공정들을 구성하고 계획을 수립하는 전문가의 지식에 대한 표현 기법과 이의 추론 방법론을 개발하였다. 또한 이렇게 수립된 공정 계획을 바탕으로 프로젝트 초기 단계에서의 일정 계획을 수립하는 휴리스틱 기반 일정 계획 방법론을 제안함으로써 보다 빠르게 공정 계획의 수행 가능성과 경제성을 여러 가지 측면에서 고려해 볼 수 있게 된다. 이와 같은 자동화된 프로젝트 초기 단계의 공정 계획 수립은 계획 수립 소요를 극적으로 단축시키며 따라서 불확실한 상황이나 여건에 대한 고려를 체계적으로 그리고 충분히 수행할 수 있게 함으로써 보다 수립된 공정 계획의 완전성과 정확성을 높이게 될 수 있다. 본 연구에서는 또한 이상의 접근 방법을 시스템으로 구현하였으며, 구현된 플랜트 건설 공정 계획과 일정 계획 수립 시스템은 국내 최대 건설회사의 열병합 발전소와 하수처리장 건설을 위한 실제 프로젝트 관리 업무에 적용하여 그 성과를 경험적으로 중명하였다. 특히 이와 같은 실제 적용 사례는 본 방법론이 다른 플랜트 건설 분야에서도 쉽게 적용되어 프로젝트 관리 업무의 질적 향상과 생산성의 제고에 기여할 수 있음을 시사하고 있다.

  • PDF