Necessity to install control towers has been studied to acquire overseas energy resources and to secure funds. At present, domestic energy companies do business independently. Institutions which support plant EPC companies as partners of package deal are separated. This causes the low records at package deal for overseas resources acquisition. Except UK and USA, nations which have major companies developed overseas energy resources early by promoting a large national company. Consequently, they currently have good records. This study suggests the necessities to install integrated control tower for overseas energy resources acquisition and securing funds and the following are the ways ; 1) promote a large national company by consolidation of separate energy companies, 2) install plant EPC promotion department which support private plant EPC companies, 3) make a integrated control tower in high level government office to connect between a large national company and plant EPC promotion department.
Promoting policy to involve plant EPC companies for package deal has been studied to acquire overseas energy resources. The effectiveness of the package deal with the plant EPC companies has not been successful because the participation of the plant EPC companies is very rare. It is difficult for the plant EPC companies to join the package deal due to the lack of the fully responsible organization to support the plant EPC companies participating in a package deal. The followings are suggested as the ways to promote the participation of the plant EPC companies for package deal in this study; 1) financial support of the government for plant EPC companies 2) political support of the government for plant EPC companies 3) specialization of the advanced countries for public-private cooperation.
The capability of design and engineering of global EPC companies has long been equalized through past similar construction experiences. Among various key factors in the success of EPC project, the capability of engineering is considered to be the most important factor since the engineering is preceding activities of EPC contract. The failure of engineering may adversely affect the subsequent procurement & construction activities and in turn may cause cost overrun or schedule delay. Therefore, an EPC company needs to continue to improve the engineering capabilities for the success of project. The engineering capabilities can be further improved if the EPC company should prevent recurrence of similar design faults that were previously committed. This study is intended to present how to make the most of the failure examples from previous projects towards a success of project. Failure is but a stepping stone to success. The EPC company can obtain useful lessons from the analysis of past failure examples.
Promoting policy to involve plant EPC companies for package deal has been studied to acquisite overseas energy resources. The effectiveness of the package deal with the plant EPC companies has not been successful because participation of the plant EPC companies is very low. It is difficult for the plant EPC companies to join the packaged deal due to the lack of the whole responsibility organization to support that plant EPC companies participate in package deal. The followings are suggested as the ways to promote the participation of the plant EPC companies for package deal in this study. 1) financial and policy support of governmen 2) specialization of the advanced countries.
Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.375-380
/
2009
Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.
플랜트 산업은 여러 가지 요소기술이 복합적으로 적용되고, 엔지니어링, 기자재 제작기술, 컨설팅, 파이낸싱 등의 지식서비스를 필요로 하는 차세대 성장동력 산업임에도 불구하고, 국내의 실정은 프로젝트 사업관리가 체계적이지 못했던 것이 사실이다. 따라서 관련 기술력에 대한국가차원의 선진화 전략과 프로젝트 수행단계별 업무절차의 정립이 요구되고 있다. 이에 본 논문은 사업관리 효율증대를 위한 표준화된 업무절차 정립을 목적으로 다음의 연구를 수행하였다. 첫째, 국내외 업무절차서와 관련된 문헌조사 및 12개 대형플랜트건설사의 업무절차서를 수집하였다. 둘째, 수집된 업무절차서의 분석을 통해 현재 산업계에서 사용하고 있는 업무절차서의 문제점을 분석하고 개선방안을 도출하였다. 셋째, 미국 PMI의 프로젝트관리 지식체계의 모태인 PMBOK의 이론과 CMAA의 건설사업환기 업무범위를 활용하고 국제표준화기구가 제정하고 시행하는 ISO 9001:2000 규정을 착용하여 EPC프로젝트의 효율적인 관기를 위해 필요한 EPC수행단계별 21개의 중점관리요소를 포함한 업무절차 매트릭스를 도출하였고, 전문가 자문을 통한 '계획 및 설계단계', '구매조달단계', '시공 및 시운전단계'별 176개의 '주요단위업무'를 도출하였다. 넷째, 도출된 EPC 수행단계별 주요단위업무를 Business Process 관점으로 재설계하고, 전문가 자문과 검증을 통하여 총176개의 업무절차 BPM모델을 개발하였다. 최종단계로, 'EPC 수행단계별 업무절차BPM모델'의 시스템 개발모델을 제안하였다.
PLM system has been widely used in whole industry. Specially, in case of the company that constructs the engineering plant, PLM can be a key success tool for the innovation with ERP and Enterprise IT Systems. This paper describes the innovation strategy for engineering plant PLM including Master Data management, EPC project management, full 3D modeling and quality management.
The use of packaged skid in oil and gas plant has increased dramatically over the decades, replacing loose supply equipment. Most equipment is installed on structural skid in manufacturer's shop. As Oil and Gas Plants are constructed at inaccessible area, the demands of packaged skids are increased. The packaged skid have advantages comparing to loose supply equipment in inaccessible area. The packaged skid is small complex plant consists of process, mechanical, piping, instrument, electrical and structural steel. This paper examines advantages and problems of packaged skid, based on previous experience. EPC company consider key factors such as manufacturing period, construction periods, equipment quality and costs.
This study aims to develop a strategy for South Korean companies to penetrate into the global NPP(nuclear power plant) market with their strength as the sixth biggest nuclear power generator in the world. With 20 nuclear plants in commercial operation and 6 more in construction, South Korea has the best technology in construction and operation of NPP. Despite these capabilities as demonstrated on its domestic market, Korean companies' constraint to enter and play a key role in global NPP market would be the lack of experience in overseas NPP projects, original technologies, and diplomatic effectiveness. This study analyzes the competitiveness of Korean standardized nuclear power plant, construction management skills, construction technologies, manufacturing equipment and materials and operation skills. In this research the current status of existing NPP and the forecast of building NPP according to countries was analyzed in order to work out strategies with technology, cost-effectiveness, and diplomatic consideration.
The public-private cooperation in package deal has been studied for the overseas energy resources acquisition. The effectiveness of the package deal has not been successful because the deal has led by the government organizations. It is difficult for the plant EPC companies to join the packaged deal due to the lack of the whole responsibility organization to support the participation of the package deal. The followings are suggested as the ways to strengthen of the public-private cooperation in this study. 1) the relevant public enterprise privatization 2) establishment of the joint model for leading the plant EPC companies to the package deal 3) establishment of the whole responsibility organization for the public-private cooperation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.