Proceedings of the Korean Society of Precision Engineering Conference
/
1992.04a
/
pp.250-255
/
1992
This paper discusses how to develop a standard time for face cutting. The discussion focusses especially on the useful experert and law data for automated generate standard time purposes. Make standard time is a means to realize the process planning. Also process planning is a process which expresses design. In past times, a process planning was done using only experience of expert. But nowadays many people try to make automated process planning. This paper discusses standard time of the face cutting, but except making process sequence. In order to make standard time, some rules have to be generated and some industrial data found out. So we can calulate standard time in die. This is to easer and to correct calulate standard time. Using some rules that are application oriented to every parts of die.
Journal of the Korean Institute of Rural Architecture
/
v.3
no.3
/
pp.47-55
/
2001
For several years by discussion and research, the designing plan and detail plans of year 2000 has been unified. By this result the District Standard Planning as well as the following existing town to control all sorts of living surrounding problems and to make a delightful arranged town are the purpose, which is carrying out all over the country. It is true that the expectation was high to the District Standard Planning. Because of this plan it could use and control the District special quality. Such as, it could rise the ability of beautiful sight and make a advisable town. But in this study the first preceding subject is a problem by the constructing work that the restriction and the standard application has been strong. So the District Standard Planning had many problems. And also by the problems here, as a immoderate volition and stiffen about the operation, the system and equipment lack about the environment improving work, problems with areas by the exciting plannings, the attitude of the executive agency that can't accept the inhabitants will. From these backgrounds we thought the research has not to be standardize in only newtown concept, but has to breath with the exciting towns and the rural areas that the District Planning has been applied. And to revive the special quality of the area and local government by a positive and logical research. Consequently in this study, we researched about the problems of architectures that had issues with the District Standard Planning of architectural part of operation guide which has been assisted form Single-Detached House in Eomsa District Dooma-Myun Nonsan which is located in Chungnam province.
The manufacturing industry with Make-to-Order production system is difficult to decide the standard information for the product and the demand is variable to estimate. In this paper, we concerned with the process planning method using data mining in the manufacturing industry with Make-to-Order environment. The subject of our study is the industry transformer plant which is received an diverse order of customer and then produced the product. Currently, process planning method is classified the standard information by hand based on the acquired knowledge through the experience. The standard information stored the various information, such as work sequence, time and so on. This process planning method needs an experts which possesses the field experience for several years. For the product specification which is varied in each order, current process planning method is not efficient due to need many times To solve this problem, we extract the information using data mining process for each processing time, and then construct the knowledge base. We propose a method which is the process planning of the industry transformer product in Make-to-Order environment using the knowledge base.
International Journal of Precision Engineering and Manufacturing
/
v.2
no.3
/
pp.69-78
/
2001
This paper presents a process and operation planning system and an NC code post-processor for effective machining of press dies for production of cars. Based on the machining feature, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor adjusts feedrates along the tool path to reduce machining time while maintaining the quality. The adjustment rule is selected based on the machining load estimated by virtual machining.
Journal of the Korean Society for Precision Engineering
/
v.17
no.5
/
pp.108-115
/
2000
This paper presents a variant type process planning system for machining of dies for auto-body production. Through the analysis of dies and their manufacturing processes, the authors categorized the press dies into 15 groups according to the similarity of machining features. After critically reviewing current manufacturing procedures, a standard process plan was defined for each group. The authors present MP3D the process planning system built on the standard process plan database, and show how they apply it at the die manufacturing plant of an automobile company. MP3D is expected to reduce major losses in machining such as reworking caused by mistakenly uncut features and eventually to help to accumulate the knowledge of operators. The operation sheet MP3D produces is also used in monitoring the progress of manufacturing of dies. This paper explains the whole development cycle of a process planning system from process analysis to application so that it can help readers to develop and apply a process planning system to their machine shops.
Sin, Dong-Mok;Lee, Chang-Ho;Choi, Jae-Jin;Noh, Sang-Do;Lee, Ki-Woo
Journal of the Korean Society for Precision Engineering
/
v.18
no.1
/
pp.63-73
/
2001
This paper presents a process and operation planning system with an NC code post-processor for effective machining of press dies for production of cars. Based on the machining features, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor we developed adjusts feedrates along the tool path to reduce machining time. The adjustment rule is selected based on the metal removal rate estimated by virtually machining with virtual cutting tool.
Journal of the Korean Institute of Rural Architecture
/
v.1
no.3
/
pp.27-34
/
1999
The purpose of this study was to provide basic information on the rural house planning through the research on the use of the standard plans, architectural characteristics, importance of the planning points and housing satisfaction of the residents. 25 rural households scattered around Chungchong provinces-south and north- were surveyed for this study through the questionnaire method. The results of this study were as follows. The importance considered first was the low construction costs, and therefore the standard plans were not fully acknowledged and commonly used. Most real plans are the single-floor houses with 3 rooms, having 25-30 pyong magnitude. The planning points stressed highly were the storage space, convenience of the plan and size of the living room. Housing satisfaction level was high on direction of the facade, size of the living room and position of the bath/washing room, but low for the storage space.
Proceeding of Spring/Autumn Annual Conference of KHA
/
1992.11a
/
pp.91-101
/
1992
The aim of this study is to offer the basic data concerning the architectural characteristics of the recently constructed farmhouses built by the residents’ self-planning after 1987, compared with the standard housing plan, for the desirable farmhouse planning. The 77 farmhouses, scattered in Milyang-gun, Yangsan-gun and Ulsan-gun near Ulsan city, were selected for the field measurement and the data, compared with the 14 standard housing plans, were analysed by the qualitative method. The farmhouses studied here showed average size of 25-pyongs(82.5m2) and took the flat slab type of roof by the masonry construction of the red blicks. The characteristics in planning were \circled1 the Anbang placed adjacent above the living room, \circled2 a pare of double-sliding doers for the Anbang. \circled3 a pare of double-sliding doors between the living room and the yard for the openness of the living room, \circled4 a door between the living room and the kitchen, \circled5 the multiuse-room by the kicthen for supplemental use, and \circled6 the storage space as attics secured indoor. The standard housing plans, different from these of the recently constructed farmhouses, placed emphasis on the separativeness of each space using the one hinged doors. The farmhouses built recently therefore were not affected by the characteristics of the standard housing plans.
The Journal of Sustainable Design and Educational Environment Research
/
v.11
no.1
/
pp.1-10
/
2012
Establishing public kindergarten is very important in social welfare aspects. So far almost public kindergarten were built up as attached style in primary school. More independent style kindergarten is being requested for small land area, shorter commuting distance. But the standard design guideline of the independent public kindergarten is insufficient. The purpose of this study is to examine the architectural Planning direction for the standard design guideline of the independent public kindergarten. A result of this study can be suggested what kind of architectural Planning direction of independent public kindergarten is needed more acutely.
This study explains the planning practical training that researches the process of functional game planning approach by developing functional games. The main focus of this study is the practical training process of planning which is an important part of game development jobs by developing games with proper functional materials, 'Framework of Planning Functional Game', and the verification of framework by developing functional games. This paper suggests that the functional game planning approach with the right function requires progressive/quantitative standard, which is different from typical process. Therefore, this paper is useful as reference materials of a functional game education through the cases of games developed by the progressive/quantitative approach standard.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.