• Title/Summary/Keyword: Planning Stage

Search Result 1,490, Processing Time 0.029 seconds

The application and development of the Evaluation Indicators in accordance with the Planning Stages of Low-Carbon City -in relevance with the stage of urban planning establishment, design and operation of urban structure, management and maintenance- (저탄소 도시계획의 단계별 평가지표 설정 및 적용 연구 -도시계획 수립, 설계 및 운영, 유지·관리 단계를 중심으로-)

  • Oh, Deog-Seong;Sung, Jae-Wook;Lee, Seo-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.9
    • /
    • pp.4560-4571
    • /
    • 2013
  • Current global issue of climate change is growing and greenhouse gases occur in most cities. To solve the problem of climate change, the city should be changed to low-carbon structure. Low-carbon city planning is a step-by-step plan from the initial establishment, from design and operation of urban structure, to maintenance and management should be considered as an integrated whole process. Under this background, this study evaluated the whole process of low-carbon urban planning ways. For this step, divided into three steps and eight divisions, 30 sub-indicators are derived. Through domestic and foreign cases analysis studies and survey of the relevant experts, results were derived. In order to improve these points, in the intial planning establishment stage, planning of urban policy and institutional steps should be made and the plan should be appropriate to the local characteristics. In the design and operation of urban structure stage, detailed and feasible approach is needed and maintenance and management stage, participation of various stakeholders, including establishing governance and management practices could see the need.

A Study on Urban Energy Consumption Estimation on the Urban Planning Stage (도시계획단계의 에너지 수요예측 방안에 관한 연구)

  • Yeo, In-Ae;Yoon, Seong-Hwan
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.506-510
    • /
    • 2012
  • This study suggested an improved algorithm of urban energy consumption estimation on the urban planning stage which concerns calculation accuracy. The results are as follows. (1) Urban energy consumption was estimated and managed per unit space using E-GIS DB which contains facility information per mesh. (2) Urban energy consumption was reflected by the urban facility classified and standardized by the characteristics of energy use. (3) Calculation accuracy of energy consumption was approached by separately suggested as summer algorithm reflecting urban heat island on summer energy use and winter algorithm reflecting heating system normally used in Korea.

  • PDF

Design Alternative Assessment Method using Discrete Event Simulation and Building Information Model (이산사건 시뮬레이션과 BIM을 활용한 설계대안 평가에 관한 연구)

  • Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.158-159
    • /
    • 2016
  • Construction project consists of several stages such as planning, design, construction, operation/maintain, etc. Decisions made in the planning and design stage have a significant impact on the construction and operation/maintain stages. Identifying key resources contributing to duration and cost of design alternatives is an important measure to achieve effective coordination between design and construction. This study proposes a method which finds an optimal design alternative by taking into account of resource planning, expected duration, and cost in construction stage. Base on literature review relative to the assessment of design alternatives, a method which predicts required resources, duration, and cost of the design alternative is established. Then, a method that identifies an optimal design alternative based on the preference of a certain project criteria is developed. Finally, a case study is presented.

  • PDF

Application Examples of CFD at the Planning Stage of High-Rise Buildings

  • Hiroto, Kataoka;Yoshiyuki, Ono;Kota, Enoki;Yuichi, Tabata;Satoko, Kinashi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.145-156
    • /
    • 2022
  • Application examples of computational fluid dynamics (CFD) in the planning stage of high-rise buildings are introduced. First, we introduce examples of applications in the environmental field. The pedestrian wind environment was one of the earliest practical examples of CFD. CFD was also employed to validate the heat island mitigation measures proposed as part of the new construction plan. Second, application examples of wind-force evaluations are introduced. Prediction examples are presented for the peak wind pressure around a complex-shaped building and the wind force evaluation for a base-isolated building. The results prove that the results of the proper execution of CFD are equivalent to those of the wind tunnel experiment. As examples of CFD applications of other issues related to high-rise building planning, we introduce snow accretion on outer walls and high-temperature exhaust from emergency generators. Finally, the future prospects for the use of CFD are discussed.

Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods - (초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 -)

  • Hyun, Dong-Myung;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

Cognition-based Navigational Planning for Mobile Robots (인지에 기반한 이동 로봇의 운항계획)

  • Lee, In-K.;Lee, Dong-J.;Lee, Suk-Gyu;Kwon, Soon-H.
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.14 no.2
    • /
    • pp.171-177
    • /
    • 2004
  • In this paper, we propose a cognition-based navigational algorithm for mobile robots in dynamic environments. The proposed algorithm consists of two main stages: (i) the fuzzy logic-based perception stage that constructs knowledge from the sensory data for subsequent usage in reasoning, and (ii) the planning stage that identifies the path between a starting and a goal position within its environment on the basis of the knowledge base on the environment and information from the perception stage. A mobile robot reasons places and moves to goal using ambiguous information and ambiguous knowledge through ‘perception’ and ‘planning’. We provide computer simulation results for a mobile robot in order to show the validity of the proposed algorithm.

The Influence of the Propensity to Consume of the Domestic Consumer Eating Out on the Satisfaction of Visiting the Themed Restaurant (국내 외식소비자의 소비성향이 테마 레스토랑 방문 만족에 미치는 영향 - 레스토랑 선택을 조절효과 중심으로 -)

  • Yang, Dong-Hwi;Kim, Chan-Woo
    • Culinary science and hospitality research
    • /
    • v.22 no.8
    • /
    • pp.17-26
    • /
    • 2016
  • This study conducted to identify the influence of consume propensity on the visiting satisfaction among 253 people who visited the themed restaurants across the country within two months from the date of January 7, 2016. The result of this study are as following: Sociality, impulsivity, and planning are used for estimating the propensity to consume, and sociality (${\beta}=.551$, p<.001), impulsivity (${\beta}=.094$, p<.05), and planning (${\beta}=.328$, p<.001) had the significant positive (+) influence on satisfaction. Second, the choice of the themed restaurant had the significant positive (+) influence on the all variables of consume propensity in the first stage model that the propensity to consume of consumers was considered as an independent variable. In the second stage input model, the choice of restaurant (${\beta}=0.228$, p<.01) had the significant positive influence. That is, the choice of restaurants generally elevated the satisfaction of visiting the themed restaurants. In the third stage that the interaction between the propensity to consume of consumers was considered as an independent variable. The results show there was the significant positive (+) regulation effect with sociality (${\beta}=.108$, p<.05) and planning (${\beta}=.167$, p<.05), but there was no influence with impulsivity.

Design Procedure for System in Package (SIP) Business

  • Kwon, Heung-Kyu
    • Proceedings of the International Microelectronics And Packaging Society Conference
    • /
    • 2003.09a
    • /
    • pp.109-119
    • /
    • 2003
  • o In order to start SIP Project .Marketing (& ASIC team) should present biz planning, schedule, device/SIP specs., in SIP TFT prior to request SIP development for package development project. .In order to prevent (PCB) revision, test, burn-in, & quality strategy should be fixed by SIP TFT (PE/Test, QA) prior to request for PKG development. .Target product price/cost, package/ test cost should be delivered and reviewed. o Minimum Information for PCB Design, Package Size, and Cost .(Required) package form factor: size, height, type (BGA, QFP), Pin count/pitch .(Estimated) each die size including scribe lane .(Estimated) pad inform. : count, pitch, configuration(in-line/staggered), (open) size .(Estimated) each device (I/O & Core) power (especially for DRAM embedded SIP) .SIP Block diagram, and net-list using excel sheet format o Why is the initial evaluation important\ulcorner .The higher logic power resulted in spec. over of DRAM Tjmax. This caused business drop longrightarrow Thermal simulation of some SIP product is essential in the beginning stage of SIP business planning (or design) stage. (i.e., DRAM embedded SIP) .When SIP is developed using discrete packages, the I/O driver Capa. of each device may be so high for SIP. Since I/O driver capa. was optimized to discrete package and set board environment, this resulted in severe noise problem in SIP. longrightarrow In this case, the electrical performance of product (including PKG) should have been considered (simulated) in the beginning stage of business planning (or design).

  • PDF

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

A Computer-Aided Inspection Planning System for On-Machine Measurement - Part II : Local Inspection Planning -

  • Cho, Myeong-Woo;Lee, Hong-Hee;Yoon, Gil-Sang;Choi, Jin-Hwa
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.8
    • /
    • pp.1358-1367
    • /
    • 2004
  • As a part II of theis research, new local inspection planning strategy is proposed in this paper based on the proposed inspection feature extraction method. In the local inspection planning stage, each feature is decomposed into its constituent geometric elements for more effective inspection planning. The local inspection planning for the decomposed features are performed to determine: (1) the suitable number of measuring points, (2) their locations, and (3) the optimum probing paths to minimize measuring errors and times. The fuzzy set theory, the Hammersley's algorithm and the TSP method are applied for the local inspection planning. Also, a new collision checking algorithm is proposed for the probe and/or probe holder based on the Z-map concept. Finally, the results are simulated and analyzed to verify the effectiveness of the proposed methods.