A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

An Investigation of Project Completion Time Estimation Method in PERT Network for Planning and Management in Large-Scale Systems (대규모 시스템의 모사와 관리를 위한 PERT네트워크 완료일자 추정기법에 관한 고찰)

  • Lee, Jae-Myung;Yi, Ho-Jae;Park, Mee-Jeong;Lee, Jeong-Jae
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.695-699
    • /
    • 2005
  • Propriety of PERT network for planning and management in large-scale systems was investigated. We also review the example of small and middle size system to compare the appropriateness of PERT analysis method. For comparing the appropriateness of PERT analysis method the calculation time, and the variances were estimated. Eventualy, we proposed the criteria of PERT analysis method for planning and management large-scale systems.

  • PDF

The Activation Strategy of Electronic Payment Industry Using Scenario Planning : Focusing Simple Payment (시나리오 플래닝을 통한 국내 전자결제 산업의 활성화 전략 : 간편결제를 중심으로)

  • Han, Chejin;Cho, Keuntae
    • Korean Management Science Review
    • /
    • v.33 no.1
    • /
    • pp.59-75
    • /
    • 2016
  • The domestic simple payment service was not activated yet compared to foreign countries and there are many things to complement in the legal, institutional, and technical aspects. The future image of the domestic electronic payment propulsion was considered by the scenario planning focusing on the simple payment. Total 6 future scenarios were drawn through the scenario planning, and 3 major strategy directions for attaining the preferred future scenario were drawn. This study drew a meaningful scenario through various analyses and industry specialist questionnaire about the future of the simple payment service which will be a crucial change of the domestic electronic payment under the uncertain future situation, and suggested an implication for the government and every interested party who provides the industrial service to prepare for the future.

WORKFORCE INFORMATION DATABASE AND RFID TECHNOLOGY TO TRACK AND MANAGE WORKFORCE INFORMATION

  • Yong-Woo Kim;Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1094-1099
    • /
    • 2009
  • Workforce information is important in production planning because production planning requires matching a production unit's capacity to loads of assignments. However, tracking and managing workforce information such as skills and accident history is not an easy job. This paper describes a prototype database system for a workforce database system that employs RFID technology. This system tracks daily workforce production capacity on sites. A pilot project is described to explore the benefits and possibility of using radio-frequency identification (RFID) to track and manage workforce information, and is followed by the results of a survey to identify benefits. In addition to the survey identifying the benefits of the database system, the paper also presents a list of challenges through a series of interviews.

  • PDF

Practitioners' Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.1-12
    • /
    • 2014
  • Construction management has been suffering from many problems, which need to be solved or better understood. Most of construction projects have not achieved efficiency as expected. In this context, waste was also considered as a problem of efficiency decrease, and poor production planning was considered as a cause for waste. This study was conducted on the basis of waste concepts and production planning processes based on the philosophies of Lean Construction. A survey to find out the relationship between them was carried out through questionnaire, which was answered by experienced people in construction projects. The results have shown that frequency of wastes occurrence is quite high, and production planning processes are superficially performed in construction phase. There is a significant negative relationship between production planning and waste occurrence (r = -0.262). Weekly Work Plan (WWP) is the most dominant plan for waste control with seventeen in total of nineteen waste factors, and phase plan is the most dominant plan for two remaining waste factors. A case study was adopted to validate the relationship between production planning and waste occurrence. The results showed that the better the project was planned, the fewer the waste would occur on construction sites.

Improvement Strategy of Law-System for Rural Landscape Planning (농어촌 경관계획 관련 법제도의 개선방향 검토)

  • Park, Chung-Shin;Kim, Seung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.15 no.3
    • /
    • pp.25-32
    • /
    • 2013
  • This study aims to suggest the improvement strategy of law-system for rural landscape planning. The results are as follows. First, for the establishment of the rural and fishing village landscape planning, it is necessary to change the concept of the scene into Landscape to watch from Landscape to feel from now on. Second, it is necessary to establish a rural and fishing village landscape planning of the local unit to manage the rural and fishing village landscape systematically. In addition, it is necessary to cooperate with the Scenic Conservation Act in contents of the basic planning when we perform rural and fishing village development business. Third, it is necessary to make an extra landscape management planning to consider local landscape resources to develop a rural and fishing village. Finally, with an improvement direction of the plan establishment, the action to practice and management in the future is necessary. This method may do wider public information with establishing the management mechanism of the rural and fishing village landscape.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

IS Characteristics for Planning Decision Making : Contingent on Planning Modes (기획의사결정을 위한 정보시스템 특성 : 기획방식에 따른 상황적응적 접근)

  • Jo, Se-Hyeong
    • Asia pacific journal of information systems
    • /
    • v.3 no.2
    • /
    • pp.117-144
    • /
    • 1993
  • MIS researches involve, in particular, the problems of developing appropriate IS for given MIS environments and lay emphasis on identifying prominant IS characteristics pertaining to the system in issue. This study deals with the IS characteristics for the management task of "planning". It investigates empirically the impacts of IS characteristics, under a set of proposed hypotheses, with particular respect to users' information satisfaction and performance in carrying out the task of planning. Futhermore, it examines whether the IS characteristics have different effects depending on the planning modes on the part of IS users. Based on a group of hypotheses accepted, the IS characteristics for planning decision making are not only proposed according to planning modes: preactive, reactive and proactive, but also classified into six subsystem categories: input, process, ouput, storage, interface and communication. Finally, the implications of the findings are discussed.

  • PDF

A complementary approach to strategic information systems planning

  • Han, Jaemin;Shin, Young-J.;Yang, Jeong-Sik
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1990.04a
    • /
    • pp.61-70
    • /
    • 1990
  • The information revolution is sweeping through the global economy. The strategic significance of the information and information technology have been some what underestimated. Now they are transforming the structure of competition. Information technology must be applied to improve and sustain an organization's competitive advantage. The successful implementation of information technology is dependent on the effectiveness of information systems planning. However, the selection of the right methodology still remains a open question. This paper describes the existing methodologies for information system planning. A complementary approach to strategic information systems planning, which was developed for a steel company, is suggested. The approach attempts to combine Business Systems Planning of IBM and Critical Success Factors Analysis for effective information systems planning. Although this approach is in the experimental stage it looks to be of benefit to large organizations which require information planning for managerial level.

  • PDF

조선 중일정계획시스템을 위한 공정계획 객체 설계에 관한연구

  • 최해주;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.290-293
    • /
    • 2001
  • The mid-schedule planning of the ship is making a schedule about the process from cutting to erection. The ship consists of lots of blocks. This block has different process because of the shape of the block varies in accordance with the ship-type and the part position of the ship. The type and order of each block process initially must be generated for the mid-schedule planning. In this paper, the process planning, described as above is preparing the basic information before scheduler make a plan with the prepared manhour. The scheduling is done with this process planning which includes the information of the process order. This paper shows the research about three methods to design the process planning. First, investigate the expression method about information of the process planning for the mid-schedule planning in real workplace. Second, design the object of the process planning on the basis of investigating the expression method. Finally, develop the prototype of object on the basis of this designed process planning and then find the practical use in the mid-schedule planning. The object, which is developed in this paper, contains the main algorithm. In case of developing The Mid-Schedule Planning System, this object is expected to be utilized very easily as consisting another object.