Landscape structure is important to understand a complex patterns and interaction with adjacent habitat in rural area. The aim of this study is to analyze relationship between landscape structure and insect spatial distribution in rural area to suggest applicable possibility of landscape structure as biological indicator. For this purpose, first, four landscape structure criteria such as distance from the forest; density of farmland-forest ecotone; landscape continuity; and field size are selected. Secondly, these criteria are applied to Gangsang-myeon, Yangpyeong-gun where mosaic feature are conserved at various spatial scale. Thirdly, application of landscape structure criteria is verified using correlation with species number, species diversity, and species richness of insect. As a result, it could be suggested that the landscape structure criteria are useful for explaining insect spatial distribution.
In this paper, quantitative and systematic procedures for establishing Key Performance Indicators (KPI's) of R&D departments are presented. The proposed methodology is composed of 4 steps : 1) identification of critical success factors, 2) identification of potential KPI's, 3) determination of KPI's and 4) monitoring and execution. A Strategy Map has been presented to better align KPI's with a company's competitive strategies. Also, Analytical Hierarchy Planning (AHP) is used to determine weights of KPI's and Data Envelopment Analysis (DEA) is used to analyze the effectiveness of R&D departments. To demonstrate its validity of the proposed method, it has been applied to the R&D divisions of a semiconductor company.
The purpose of this study is to develop the sustainability indicators for assessing environmental sustainability of building. This reseach focused on evaluating indicators for passive design in the stage of site planning and building massing. In order to achieve the aims of this study, first priority was given to set up systematic framework of sustainability indicators for passive design. Based on the framework, the assessment categories and indicators by each category were established. Secondly, the weighted value of each indicators were obtained by questionnaire survey of the experts. As the result of the analysis of questionnaire of experts, feasible indicators were obtained and the grades of measured values were deduced. Finally, this paper presented comprehensive environmental sustainability indicators which is related to the passive design.
The 3th International Conference on Construction Engineering and Project Management
/
pp.914-919
/
2009
The research investigates for the relationship between the operating performances of the make-ready process and project production performance. To this end, the researchers proposed a metric of PCR (Percentage of Constraint Removal) to measure the make-ready performance. The study measured the production performance in two ways: production planning reliability and progress performance. We hypothesized that how well the make-ready process is performed has an impact on the degree of production performance. The statistical analyses are used to investigate that how operating performance of the make-ready process affects project production performance. The results of the regression analysis support our hypotheses (p<0.25) and correlation coefficients for the relationship between project production performance and make-ready performance are also significant (p<0.05).
Demands for digital transformation of the construction industry are increasing to improve the accuracy of the construction operation planning and the performance of the construction operation. Even though large number of studies are being conducted to this date, most of the studies are not likely to be available on the real sites. Therefore, this study provides construction managers with a methodology of drawing construction performance indicators based on productivity analysis using Artificial Neural Network (ANN) models and Web-CYCLONE. This methodology is expected to have high utilization and precision of construction operation planning and management.
Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
Journal of Construction Engineering and Project Management
/
제5권2호
/
pp.11-15
/
2015
The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).
This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of substation bank system. In this paper, firstly, proper sphere of supply area by each district which could be standardized with respect to its supply capacity is established under assumption of long term load forecasting. Secondly, goal of utilization ratio based on configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents. Finally, it is set up for optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio. To verify proposed algorithm, at first, after adopting a part of Kangnam area in Seoul as area for testing, it is divided into several regions for this area according to power branches of power utility. Secondly, by deriving correlation factor between load demand and economic indicators in these region respectively, the regional load forecasting was performed with economic growth and city plan scenario. Finally, based on the predicted load demand by region and land use data which is identified from air-photographic, the load demand by district was predicted. Also, planning for substation considering contingency is formulated to expand taking into account computing utilization factor which is based on configuration of substation bank respectively.
Purpose: The Intensive Care Unit (ICU) is an important inpatient care area where critical patients are treated intensively with advanced medical technology. The level of care of ICU and the modernization of related facilities is an important indicator of health care quality. At the present time, when the Regional public hospitals are frequently expanding, the rational planning of the ICU has become an important part of the medical institutions treating the ICU. The purpose of this study is to present basic data with net area which can be used in the architectural planning of the ICU. Methods: The investigation and analysis of the ICUs were conducted on 26 medical facilities, based on theoretical analysis through relevant guidelines, articles, and documents, and on the basis of the actual space composition and net area analysis through the architectural drawings. Results: This study provides basic data such as zone division, spatial composition, relationship between main activities and zones, composition of facilities in the zone and area ratio within each zone. Implications: The results of this paper are expected to be effective reference materials for future research for rational spatial organization and efficient operation of the Intensive Care Unit in regional public hospitals.
본 연구의 주요 목적은 참여기업이 만족할 수 있는 지역 산학협력 R&D 과제를 선정하기 위한 지표를 발견하는데 있다. 기존의 산학협력 R&D 과제는 수요자인 참여기업에 대한 고려가 부족했다. 하지만, 우수한 연구 성과를 목표로 하는 연구개발 사업과는 달리 기업의 경쟁력 향상을 목표로 하는 지역 산학협력 R&D 과제의 경우 참여기업 중심의 과제 기획 및 선정이 필요하다. 따라서 본 연구에서는 산학협력 R&D 사업에 참여했던 기업들을 대상의 설문조사 결과를 기반으로 일원분산분석, 회귀분석 등의 통계적 분석을 통해 기업의 만족도에 영향을 미치는 요인들을 찾아내고 이를 선정기준으로 정리하였다. 연구결과 기업만족도에 영향을 미치는 요인으로는 협력시간, 사업화계획 수립시점, 기술이전 여부, 목표달성 수준 등이 있었으며, 이는 선정단계에서 구체적인 인원투입계획, 사업화 계획에 대한 평가가 필요하다는 것을 시사한다. 본 연구는 만족도를 사업 시스템 개선에 활용한 시도로서 의미가 있으며, 수요자 중심의 사업기획과 운영에 활용될 수 있기를 기대한다.
본 연구는 경상북도 봉화군에 대하여 생태관광, 생태마을 또는 퍼머켤쳐 등의 새로운 환경친화적 계획 패러다임을 적용한 자원평가 지표체계에 의하여 GIS를 사용하여 이들 지역들에 대한 자원평가를 시행하였다. 이 때, GIS를 이용하여 가중치를 반영한 지점별 평가가 이루어지도록 하였으며, 면별로 평가 점수를 비교하였다. 그 결과, 봉화읍 중에서도 닭실마을이 있는 지역이 가장 높은 점수를 받았으며, 면별 평균점수를 비교하였을 때, 봉화읍이 1위, 소천면이 2위, 춘양면이 3위의 점수를 받았다. 종합적으로 평가할 때, 상대적으로 높은 점수를 받은 지역은 봉화읍의 평지지역과 닭실마을, 춘양면의 북동부지역, 소천면의 북서부지역과 남동부지역 등으로 나타났다. 본 연구에서는 자원평가 지표체계에 의하여 GIS를 사용한 자원평가를 수행하였으며, 그 과정에서 발견되는 문제점에 대한 해결방안을 제시하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.