• Title/Summary/Keyword: Plan S

Search Result 7,670, Processing Time 0.041 seconds

Supportive House Plan for Home-based Business;focused on businessman of online shopping mall (주거공간의 재택근무 지원 계획;온라인 쇼핑몰 사업가를 중심으로)

  • Yoon, Nam-Kyung;Kwon, Oh-Jung
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.396-400
    • /
    • 2006
  • Because of rapid growth of economy and development of the communication technology of modem society, office space's shape and business contents are highly diversified. And these changes made a new working style, homeworkers who work in their house. For increasing homeworker's working efficiency, it needs a space plan which can coexist home's original functions and business functions. The purpose of this study was designed a multiplex house used a co-operative house's concept which based on the data which collected by man to man case research about operators of online shopping malls.

  • PDF

A Study on the Remodeling Case of General Hospitals in Korea - Focused on the Case of S Hospital - (국내 종합병원의 리모델링 사례 연구 - S 병원을 중심으로 -)

  • Kim, Ha-Jin;Kim, Boong-Sik;Yang, Nae-Won
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.8 no.1
    • /
    • pp.21-28
    • /
    • 2002
  • As hospitals change continuously and rapidly, the way of growth and change becomes another important factor in the design of a hospital. The hospitals are adapted for the continuous growth and change during their life span. But the hospitals built in 1970's and 80's have been expanded and reconstructed without any plan of growth and change. So, there is required to the architectural planning on the remodeling and modernization strategy of general hospitals. The purpose of this study is to provide the fundamental data for the reasonable design planning and the basic principles of the construction plan in the hospital remodeling. Thus, this study is to investigate and analyze the characteristics of hospital remodeling, the remodeling planning, and the scheduling process in terms of construction. As a result, this study would apply to design guideline for the remodeling of general hospitals.

  • PDF

A Time Truncated Two-Stage Group Sampling Plan for Weibull Distribution

  • Aslam, Muhammad;Jun, Chi-Hyuck;Rasool, Mujahid;Ahmad, Munir
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.1
    • /
    • pp.89-98
    • /
    • 2010
  • In this paper, a two-stage group sampling plan based on the time truncated life test is proposed for the Weibull distribution. The design parameters such as the number of groups and the acceptance number in each stage are determined by satisfying the producer's and consumer's risks simultaneously when the group size and the test duration are specified. The acceptable reliability level is expressed by the ratio of the true mean life to the specified life. It was demonstrated from the comparison with single-stage group sampling plans that the proposed plan can reduce the average sample number or improve the operating characteristics.

An Improved Group Sampling Plan Based on Time-Truncated Life Tests

  • Aslam, Muhammad;Pervaiz, Muhammad Khalid;Jun, Chi-Hyuck
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.3
    • /
    • pp.319-326
    • /
    • 2010
  • In this paper, a new group sampling plan for the lot acceptance is proposed for the time truncated life test, which can be utilized when multi-item testers are implemented. The design parameters are found using the two-point approach such that the producer's and consumer's risks are satisfied simultaneously at the acceptable reliability level and the lot tolerance reliability level, respectively. The case of Weibull distribution is described to illustrate the procedure that can be used when the quality level is expressed by a multiple of the specified life. The advantage of the proposed plan is demonstrated by comparing with the existing plan in terms of the sample size required. The tables are constructed and some examples are given to illustrate the procedure developed here.

Site and Erection of the Government Complex Seoul in Capital Seoul (수도 서울에서 정부종합청사의 입지와 건립)

  • Lee, Sumin;Woo, Don-Son
    • Journal of architectural history
    • /
    • v.27 no.2
    • /
    • pp.51-62
    • /
    • 2018
  • This study examines the site and erection of the Government Complex Seoul which was a project attempted to assemble dispersed government buildings in a certain place. The study focuses on the fact that the project is situated between the 1960s' making of capital Seoul and Seoul urban planning, and the way how the project achieved symbolism in capital Seoul. The project, one of the 1960s' Major Government Buildings, led both plan of capital Seoul and transforming city Seoul. The 1960s' Major Government Building Plan had identical drive with the 1950's Major Government Building Plan, however the 1960s' had additional layer: Seoul urban planning. After restoration of the Capital building, Sejongro the capital street was planned to the site arranging government offices. The Government Complex Seoul was set to be a modern building on a site with historical context according to the plan. Because of the site, the Government Complex Seoul was constructed in aware of other buildings that represented a competitive high-rise atmosphere in the late 1960s, including the Capital building nearby. PAE International's plan was completed through a series of design modification, and it boasted a vertical aspect, unlike the horizontal-looking plan that was already won after the design competition. The Government Complex Seoul tried to acquire the symbolism in the central space of the capital Seoul and high-rised city Seoul. "The new construction method" was a requirement to achieve the height.

A Study on the Present Condition of Color Plan considering the Resident's Characteristic in Housing Space (거주자특성을 고려한 주거공간 색채계획 현황조사 연구 - 거주자 특성을 고려한 주거공간 색채계획에 관한 연구 I -)

  • Kim, Soon-Mi;An, Ok-Hee;Seo, Ji-Eun
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.11a
    • /
    • pp.235-239
    • /
    • 2009
  • The purpose of this study is to apply the basic data of the color plan to satisfy the internal desire of residents by considering residents's special in housing space. So we analyzed and surveyed the current condition of color plan in housing space where age units of 30~40 are living. The results of this study are as followed. when the current place of color distribution was observed, ceiling and general wall showed that N(white) systems and YR of bright tone was mostly distributed. On other hand the bottom showed that the calm tone YR was mostly distributed. we could know that residents wanted to show the special of rooms by using point wall. This tendency more presented in privacy room than public room. Through this study, we could evaluate that the special of residents is not presented in color plan of the housing space where age units of 30~40 are living. So we could think that it is needed methods of color plan considered the special of residents for discriminative characteristic of the design in housing space.

  • PDF

A Variables Repetitive Group Sampling Plan for Minimizing Average Sample Number (평균 샘플 수 최소화를 통한 계량형 반복 샘플링 검사의 설계)

  • Park, Heekon;Moon, Young-gun;Jun, Chi-Hyuck;Balamurali, S.;Lee, Jaewook
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.3
    • /
    • pp.205-212
    • /
    • 2004
  • This paper proposes the variables repetitive group sampling plan where the quality characteristic following normal distribution has upper or lower specification limit. The problem is formulated as a non-linear programming problem where the objective function to minimize is the average sample number and the constraints are related to lot acceptance probabilities at acceptable quality level (AQL) and limiting quality level (LQL) under the operating characteristic curve. Sampling plan tables are constructed for the selection of parameters indexed by AQL and LQL in the cases of known standard deviation and unknown standard deviation. It is shown that the proposed sampling plan significantly reduces the average sample number as compared with the single or the double sampling plan.

The Application of 3D Bolus with Neck in the Treatment of Hypopharynx Cancer in VMAT (Hypopharynx Cancer의 VMAT 치료 시 Neck 3D Bolus 적용에 대한 유용성 평가)

  • An, Ye Chan;Kim, Jin Man;Kim, Chan Yang;Kim, Jong Sik;Park, Yong Chul
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.32
    • /
    • pp.41-52
    • /
    • 2020
  • Purpose: To find out the dosimetric usefulness, setup reproducibility and efficiency of applying 3D Bolus by comparing two treatment plans in which Commercial Bolus and 3D Bolus produced by 3D Printing Technology were applied to the neck during VMAT treatment of Hypopahrynx Cancer to evaluate the clinical applicability. Materials and Methods: Based on the CT image of the RANDO phantom to which CB was applied, 3D Bolus were fabricated in the same form. 3D Bolus was printed with a polyurethane acrylate resin with a density of 1.2g/㎤ through the SLA technique using OMG SLA 660 Printer and MaterializeMagics software. Based on two CT images using CB and 3D Bolus, a treatment plan was established assuming VMAT treatment of Hypopharynx Cancer. CBCT images were obtained for each of the two established treatment plans 18 times, and the treatment efficiency was evaluated by measuring the setup time each time. Based on the obtained CBCT image, the adaptive plan was performed through Pinnacle, a computerized treatment planning system, to evaluate target, normal organ dose evaluation, and changes in bolus volume. Results: The setup time for each treatment plan was reduced by an average of 28 sec in the 3D Bolus treatment plan compared to the CB treatment plan. The Bolus Volume change during the pretreatment period was 86.1±2.70㎤ in 83.9㎤ of CB Initial Plan and 99.8±0.46㎤ in 92.2㎤ of 3D Bolus Initial Plan. The change in CTV Min Value was 167.4±19.38cGy in CB Initial Plan 191.6cGy and 149.5±18.27cGy in 3D Bolus Initial Plan 167.3cGy. The change in CTV Mean Value was 228.3±0.38cGy in CB Initial Plan 227.1cGy and 227.7±0.30cGy in 3D Bolus Initial Plan 225.9cGy. The change in PTV Min Value was 74.9±19.47cGy in CB Initial Plan 128.5cGy and 83.2±12.92cGy in 3D Bolus Initial Plan 139.9cGy. The change in PTV Mean Value was 226.2±0.83cGy in CB Initial Plan 225.4cGy and 225.8±0.33cGy in 3D Bolus Initial Plan 224.1cGy. The maximum value for the normal organ spinal cord was the same as 135.6cGy on average each time. Conclusion: From the experimental results of this paper, it was found that the application of 3D Bolus to the irregular body surface is more dosimetrically useful than the application of Commercial Bolus, and the setup reproducibility and efficiency are excellent. If further case studies along with research on the diversity of 3D printing materials are conducted in the future, the application of 3D Bolus in the field of radiation therapy is expected to proceed more actively.

A Study on the Reformation of Long-term Unexecuted Urban Plan Facilities using GIS (GIS을 활용한 장기 미집행 도시계획시설 재정비에 관한 연구)

  • Ahn Hyung-June;Lee Mi-Ji;Koh June-Hwan;Lee Sang-Mi
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.491-494
    • /
    • 2006
  • Many urban-plan facilities were settled by the government in the need of infrastructure due to the rapid urbanization. The Constitutional Court judged that the exclusion of land-owners' private right to use their land did not accord with the Constitution, and the infringement of their right because of currently unexecuted facilities became the urgent task to be solved due to the revision of the Urban plan law revised on January 28, 2000. Accordingly, the government needed to establish a complete plan to review and rearrange the long-term unexcuted urban plan facilities. For this plan to be successful, we have constructed the database of unexecuted urban plan facilities by using GIS analysis technique in this research. Further, we will construct a basic database to manage the unexecuted urban plan facilities by utilizing the database we have constructed, computerized geographical information files of LMIS, urban plan facilities data of UPIS, and other information.

  • PDF

Design of a Life Test Sampling Plan Based on the Cost Model

  • Kwon, Young-Il
    • International Journal of Reliability and Applications
    • /
    • v.6 no.1
    • /
    • pp.31-39
    • /
    • 2005
  • An economic life test sampling plan for products with exponential lifetime distribution is developed. To reduce test time, a test plan with curtailed Type II censoring is considered. A cost model is constructed which involves three cost components; test cost, accept cost, and reject cost. Determination of optimal plan minimizing the expected average cost per lot is discussed with a constraint related to consumer's risk. Some numerical examples are provided.

  • PDF