• Title/Summary/Keyword: Piling Noise

Search Result 30, Processing Time 0.024 seconds

Bearing Capacity of In-situ Pile Installed using Pulse Power (펄스파워를 이용한 현장타설말뚝의 지지력 특성)

  • Kim, Tae-Hoon;Chai, Soo-Geun;Jeong, Gyu-Geom
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.521-527
    • /
    • 2005
  • In the past decades, complain about ground vibration and noise induced by pile driving has been quickly increased. Because of that, auger drilled piling methods have frequently used specially in urban area. However, the present auger drilled piling methods induce inevitable ground disturbance as well as a certain degree of vibration and noise due to the final hammering. For these reasons, a new auger drilled piling method is required to be developed. This paper introduces PDT(Pulse Discharge Technology) piling method and presents the characteristics of bearing capacity. The PDT piling method is to install in-situ piles using electric power so called Pulse. The pile installed by PDT appears to be able to develop shaft and end bearing capacity efficiently.

  • PDF

An Experimental Study on the Characteristics of Attenuation and Propagation of Construction Equipment Noise in Piling Work by SIP Method. (SIP공법에 의한 항타작업시 발생하는 건설기계소음의 전달 및 감쇠특성에 관한 실험적 연구)

  • 김재수;이병윤;박재영;곽광수;윤해동;장용채
    • Journal of the Korean housing association
    • /
    • v.9 no.2
    • /
    • pp.67-78
    • /
    • 1998
  • Construction equipment noise has caused much annoyance for a number of dwellers in nearby construction field and it has become a very serious issue in our living environment. Therefore, in our country, a practical solution and a better method of reducing construction equipment noise are highly required in construction field. Practical solutions for the construction equipment noise, however, are very difficult to obtain, because of the lack of basic data and insufficient research works. Especially, in order to establish a successful sound isolation plan for piling work noise, which has high sound pressure level, the characteristics of the impact noise should be closely monitored and analyzed. This study attempts to survey the characteristics of attenuation and propagation of construction equipment noise in piling work by SIP(soilcement injected precast pile) method. In addition, this study intends to get the basic data to establish a standard about construction noise.

  • PDF

A Study on the Characteristics and Prediction of Piling Noise by Oil Pressure Method (유압식 항타소음의 특성과 예측에 관한 연구)

  • 이병윤;윤해동;김재수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11a
    • /
    • pp.102-107
    • /
    • 2001
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Neverthless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the characteristics and prediction of piling noise in oil pressure method. On the basis of measurement value, we analysed about prediction possibility of piling noise in oil pressure method.

  • PDF

A Study on the Vertical SPL Distribution of Piling Noise in Apartment House (유압식 항타소음의 영향을 받는 공동주택의 층별 음압레벨 분포에 관한 연구)

  • 윤해동;이병윤;양만우;김재수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11a
    • /
    • pp.96-101
    • /
    • 2001
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Neverthless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the vertical SPL distribution of piling noise by oil pressure method in construction field. This study also present a basic data found a effective plans for piling noise by oil pressure method.

  • PDF

A Study on the Prediction of SIP Piling Noise by Computer Simulation (Computer Simulation을 이용한 SIP 항타소음의 예측에 관한 연구)

  • 이병윤;윤해동;김재수
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.14-21
    • /
    • 2001
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Nevertheless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the characteristics and prediction of SIP piling noise. On the basis of measurement value, we analysed about prediction possibility of SIP piling noise by computer simulation.

  • PDF

A Study of Applicability of PDT(Pulse Discharge Technology) Pile to Kyung-Geon Rail Road and the bedding Construction of a new port in Busan (경전선 복선전철 및 부산신항 노반건설공사 중 PDT말뚝 적용성 연구)

  • Hur, Eok-Jun;Park, Jae-Myung;Yun, Su-Dong;Kim, Tae-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1203-1208
    • /
    • 2007
  • In the past decades, complain about ground vibration and noise induced by pile driving has been quickly increased. Because of that, auger drilled piling methods have frequently used specially in urban area. However, the present auger drilled piling methods induce inevitable ground disturbance as well as a certain degree of vibration and noise due to the final hammering. For these reasons, a new auger drilled piling method is required to be developed. This paper introduces PDT(Pulse Discharge Technology) piling method and presents the characteristics of bearing capacity. The PDT piling method is to install in-situ piles using electric power so called Pulse. The pile installed by PDT appears to be able to develop shaft and end bearing capacity efficiently. This paper introduces PDT(Pulse Discharge Technology) piling method, which is the 512nd new construction technology. The PDT piling method is to install in-situ piles using electrical power so called Pulse power. The pulse power is physical value that indicates the energy change per unit time(dE/dt). Since the pulse power is to push ground, using the pulse power is enable a hole to be expanded as well as the ground to be improved by compaction. Therefore, The pile installed by PDT appears to be able to develop shaft and end bearing capacity efficiently. In this study, couples of pile loading tests were carried out to figure out whether or not the PDT piling method is applicable to constructions like rail road facility. As a result, it was concluded that the PDT piling technique meet the requirements for such a rail road related construction.

  • PDF

A Study on the Improvement of Bearing Capacity Prediction Equation for Auger-drilled Piling (매입말뚝공법의 지지력 예측식 개선에 관한 연구)

  • 최도웅;한병권;서영화;조성한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.382-389
    • /
    • 2002
  • Recently, auger-drilled piling has been widely used in urban area to reduce the air pollution and noise. But this construction method that its basic theory was introduced from Japan may be changed depending on the each piling company and construction field condition. Therefore, the design code and management method for auger-drilled piling is not defined yet. Especially, the lack of research on the bearing capacity of auger-drilled piling leads to the absence of rational bearing capacity prediction equation. This paper presents the optimum design code and economical construction method of the auger-drilled piling by proposing the new bearing capacity prediction equation based on the site specific soil types and construction conditions. In this paper, existing bearing capacity prediction equations and current pile load tests were compared. And the end bearing capacity and skin friction characteristics were also analyzed by comparing the results of CAPWAP. From the results of analysis, a reliable bearing capacity prediction equation considered soil types is proposed.

  • PDF

Characteristics of Impulsive Noise of Waterfront Construction Site and Its Effects on Fishes (수변 공사에 의한 충격음의 특성과 어류에 미치는 영향)

  • Bae, Jong-Woo;Park, Ji-Hyun;Yoon, Jong-Rak
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.19 no.9
    • /
    • pp.928-934
    • /
    • 2009
  • Underwater impulsive sound such as underwater blasting noise, piling noise and stone breaking hammer affects marine animal hearing response and organs. This study describes the characteristics of various impulsive noise from waterfront construction site and their effect on fish. Time constant, peak pressure, energy and SEL(sound exposure level) of four different underwater impulsive sounds are quantified. Auditory and non-auditory tissue damage ranges are derived by comparing their quantities to the exposure criteria for fish. Damage ranges of auditory tissue and non-auditory tissue of underwater boring blast of 150 kg of charge, are about 100 m and 300 m, respectively. Other three impulsive sounds also gives damage effects but less than that of underwater boring blast.

Effect of the Piling Work Noise on the Behavior of Snakehead (Channa argus) in the Aquafarm (양식 가물치 (Channa argus)의 행동에 미치는 파일작업 소음의 영향에 관한 연구)

  • SHIN Hyeon Ok
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.28 no.4
    • /
    • pp.492-502
    • /
    • 1995
  • This paper describes the relationship between the behavior of the snakehead ( Channa arps) of 44cm long and the environmental noise levels due to the piling work. The experiment is conducted in the aquafarm located near Asan lake, Pyongtaek in 1993. The fish trajectory is obtained by a biotelemetry system in which a pulsed ultrasonic pinger attached onto the dorsal is tracked three dimensionally, and the noise and the vibration levels both in air and in water are measured. The results of this study are as follows: 1) The noise levels in water and in air and the vibration level measured at a distance of 90m from the noise source, increased by 36.5dB $(re\;l{\mu}Pa)$, 2308$(re\;0.0002{\mu}bar)$ and $5.9{\mu}m$ repectively compared to the levers before piling. 2) The highest variation of the swimming speed was observed right after the piling works and the width of variation decreased with the elapsed time. The average speeds of the fish before and during the works were measured as 0.8 times and 1.1 times of the body length, respectively. 3) It is found that the fish escapes into the mud of the aquafarm when a heavy shock wave occurred. Consequently, the heavy shock by the piling works could produce a considerably unfavorable effect to the fish.

  • PDF

Design criteria and Case History of Korean Railway for Auger-drilled Pilling (철도분야 매입말뚝 설계기준 및 적용 현황)

  • Lee, Su-Hyung;Choi, Jeong-Hwan;Hwang, Seon-Keun;Eum, Ki-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.541-548
    • /
    • 2008
  • Active application of auger-drilled piling is expected in Korea considering its advantage in noise and vibration problems against driven piling and its cost-effectiveness in comparison to the cast in-situ piling. The current design practice being used in Korea is adopted from the Japanese one, however the equipment and construction procedure is modified for the geotechnical conditions and construction circumstances in Korea. Therefore there is an urgent need for the establishment of the rational design criteria for the auger-drilled piling in Korea. As the preliminary work for the establishment, this paper presents the current practice in Korean railway constructions. Design criteria of Korea Railway Network Authority are introduced and its characteristics and the problems are described. Application cases of auger-drilled pile to railway construction are introduced as well.

  • PDF