A Study of Applicability of PDT(Pulse Discharge Technology) Pile to Kyung-Geon Rail Road and the bedding Construction of a new port in Busan

경전선 복선전철 및 부산신항 노반건설공사 중 PDT말뚝 적용성 연구

  • Published : 2007.11.08

Abstract

In the past decades, complain about ground vibration and noise induced by pile driving has been quickly increased. Because of that, auger drilled piling methods have frequently used specially in urban area. However, the present auger drilled piling methods induce inevitable ground disturbance as well as a certain degree of vibration and noise due to the final hammering. For these reasons, a new auger drilled piling method is required to be developed. This paper introduces PDT(Pulse Discharge Technology) piling method and presents the characteristics of bearing capacity. The PDT piling method is to install in-situ piles using electric power so called Pulse. The pile installed by PDT appears to be able to develop shaft and end bearing capacity efficiently. This paper introduces PDT(Pulse Discharge Technology) piling method, which is the 512nd new construction technology. The PDT piling method is to install in-situ piles using electrical power so called Pulse power. The pulse power is physical value that indicates the energy change per unit time(dE/dt). Since the pulse power is to push ground, using the pulse power is enable a hole to be expanded as well as the ground to be improved by compaction. Therefore, The pile installed by PDT appears to be able to develop shaft and end bearing capacity efficiently. In this study, couples of pile loading tests were carried out to figure out whether or not the PDT piling method is applicable to constructions like rail road facility. As a result, it was concluded that the PDT piling technique meet the requirements for such a rail road related construction.

Keywords