• 제목/요약/키워드: Performance and Cost Analysis.

검색결과 2,454건 처리시간 0.032초

PC level 병렬 구조해석법 개발을 위한 PCG 알고리즘 (PCG Algorithms for Development of PC level Parallel Structural Analysis Method)

  • 박효선;박성무;권윤한
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1998년도 가을 학술발표회 논문집
    • /
    • pp.362-369
    • /
    • 1998
  • The computational environment in which engineers perform their designs has been rapidly evolved from coarse serial machines to massively parallel machines. Although the recent development of high-performance computers are available for a number of years, only limited successful applications of the new computational environments in computational structural engineering field has been reported due to its limited availability and large cost associated with high-performance computing. As a new computational model for high-performance engineering computing without cost and availability problems, parallel structural analysis models for large scale structures on a network of personal computers (PCs) are presented in this paper. In structural analysis solving routine for the linear system of equations is the most time consuming part. Thus, the focus is on the development of efficient preconditioned conjugate gradient (PCG) solvers on the proposed computational model. Two parallel PCG solvers, PPCG-I and PPCG-II, are developed and applied to analysis of large scale space truss structures.

  • PDF

공조시스템용 지열히트펌프의 실증평가에 관한 연구 (In-situ Performance Evaluation of a Ground Source Heat Pump for an Air Conditioning System)

  • 박윤철;박성구
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제32권1호
    • /
    • pp.66-72
    • /
    • 2008
  • In this study, the ground source heat pump was installed at a research center in Jeju Island to verify the performance of the system and to give an information for a economic feasibility. The performance test was conducted until the heat storage tank temperature reached at $5^{\circ}C$ from $50^{\circ}C$ in the cooling operation, and until the storage temperature goes up to $50^{\circ}C$ from $10^{\circ}C$ in the heating mode. As results, the system performance shows that $2.2{\sim}3.5$ for the cooling operation and $2.5{\sim}3.5$ for heating operation. It is found that the underground is good heat source for the heat pump with $3{\sim}10^{\circ}C$ variation range. The ground source heat pump could be connected one of air conditioning system without any problem in system performance. Based on the economic analysis, the initial cost for the ground source heat pump will be compensated after 4 years operation. If the system runs 20 years, approximately 300 million Won will be saved when the air conditioning system adapt the ground source heat pump based on Life Cycle Cost analysis.

최근 3년간 수입 유연탄 분석 및 연소열성능 해석을 활용한 석탄화력 발전소 탄종 경제성 평가 연구 (Economic Evaluation of Coals Imported in Last 3 Years for Power Plant Based on Thermal Performance Analysis)

  • 백세현;박호영;고성호
    • 한국연소학회지
    • /
    • 제18권3호
    • /
    • pp.44-53
    • /
    • 2013
  • In this study, the economic evaluation for imported coals was conducted for power plant based on thermo-dynamical performance analysis. The number of coal types considered was 1,755 imported by five power generation companies in Korea during the 2010-2012. The higher heating value (HHV) of the coals ranged 4,000-6,500 kcal/kg, mostly sub-bituminous. The 1D thermo-dynamical performance modeling was performed for a 500 MWe standard power plant using PROATES code. It was founded that the low rank coals had negative effects on the plant efficiency mainly due to the increased heat loss by moisture, hydrogen and flue gas. Based on the performance analysis, the economic performance of the coals was evaluated. The apparent price of low-rank coals tended to be significantly lower than design coal; for example, the unit price of coal with a HHV of 4,000 kcal/kg was 57% of the reference coal having 6,080 kcal/kg. Considering the negative effects leading to a decrease in the thermal performance, heating value compensation, and increased parasite load, the corrected unit cost for the coal with 4,000 kcal/kg was 90.7% of the reference coal. Overall, the cost saving by imported coals was not high as expected.

치과기공물 원가계산의 비교분석 (Comparison Analysis of a Cost Price for Dental Prosthetic Restoration)

  • 박명호;이상락
    • 대한치과기공학회지
    • /
    • 제22권1호
    • /
    • pp.153-178
    • /
    • 2000
  • Dental prosthetic restoration shows a big difference of cost per itemized unit depending on the size of dental labs, facility standard, manpower, and performance. Even the same dental labs have distinctive cost according to manufacturing performance, inflation, and the number of workers. However, in apite of such a change of circumstances, it appears to be quite stable in the relative cost per itemized unit unless the manufacturing trend of particular item changes dramatically. Therefore, if the relative number of cost per itemized unit, which is produced by costing, is indicated, we are able to utilize it effectively as a standard wage estimate. If the wage of dental prosthetic restoration is determined on the basis of cost, it is desirable that the relative value of cost and that of wage are identical. But, by means of comparative analysis, since the relative value of wage reveals mostly lower than that of cost depending on an item, it is considered that the wage is not reflecting the cost approproately. Due to the subdivision and the profession of medical technology, the new development of wage items for dental prosthetic restoration is required. This means that the need for the establishment of new wage items should be presented as the general concept of dental prothetic restroation changes and the level of pathologic technology increases. The current wage structure has differences in the degree of difficulty accroding to unit items and in the cost factors. Nevertheless, the differences are not reflected enough to the wage, so there is potential to lower the medical quality through the use of low-proce materials to avoid the increase of cost and the work process which skips a manufacturing step. The new items of dental prosthetic restoration also increases, but the development of proper numerical value system is not supported. Thus, the right proce is set mostly by applying to the wage of a similar item. Since most wages are established by an individual agreement between the dental clinic institute and the dental labs, the propriety of wage level lacks. Therefore, it is urgent to provide and promote the system of a fair work charge by a standard cost which can be applied to all medical institute.

  • PDF

건설공사 공종별 재작업 비용의 정량적 분석 (Quantitative Analysis of Work Type's Rework Cost in Construction Project)

  • 지성준;박정은;차용운;한상원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.237-238
    • /
    • 2016
  • Rework is a major cause that adversely affects the performance of a construction project, such as schedule delay or cost overrun. In order to prevent rework, research has been mainly conducted to analyze the cause of rework, but limited to quantitatively measure cost of rework and analyze its impact on project performance. Therefore, this paper aims to analyze impact of rework cost using 369 rework items collected from 3 construction site. This research is expected to accurately determine control target of rework and to improve efficiency of business operations in construction project.

  • PDF

품질개선분야에서의 품질코스트모델의 적용 (Application of Quality Cost Model ln Quality Improvement Area)

  • 정영배;김연수
    • 산업경영시스템학회지
    • /
    • 제34권3호
    • /
    • pp.71-78
    • /
    • 2011
  • This parer proposes application of quality costing system in quality improvement area. Cost of quality in quality improvement area provides a valuable of both providing the need for improvement and giving a starting point for project. WQCMS(Web-based Q-Cost Management System) have ability to collect and analyze quality data generated from various different departments in the inside or outside of the enterprise without any limitations, if end-users are able to access wide area network. It provides the capability to integrate quality information from database and to generate various easy analysis reports to management's needs using built-in analysis tool modules with real-time. Web-based quality cost management system to measure the performance of quality improvement activities in the business firms. This paper proposes standard model for quality cost process in quality improvement area.

다점포 운영 푸드서비스 기업의 효율성 측정에 관한 연구 - DEA 및 효율, 수익 매트릭스 분석을 중심으로 - (The Analysis of Contract-Foodservice Operational Efficiency using Data Envelopment Analysis and Efficiency-Profit Matrix)

  • 김태희;박주연
    • 동아시아식생활학회지
    • /
    • 제20권5호
    • /
    • pp.823-835
    • /
    • 2010
  • The research aimed to measure the efficiency of using multi stores in a foodservice company using by DEA (data envelopment analysis) which is a new management science technique. The study also attempted to identify relevant variables affecting DEA efficiency in order to suggest methods for improving efficiency. The data were collected from 148 contract foodservice operations, which were operated in similar fashion in October 2009. The DEA efficiency was calculated as an output-oriented BCC Model. Sales, and CSI (customer satisfaction index) were used as output variables whereas food cost, labor cost, and management expense were used as input variables to calculate the DEA efficiency. Operation process variables of the unit consisted of the were consist of ratio of regular employee, ratio of housekeeper, meal counts, meal price, food cost per meal, contract period, number of menu items, forecasting accuracy, order accuracy, inventory turnover, use of processed food, deviation of food cost, number of new menus, and number of events. According to the BCC score and profitability, units were classified into four groups: High efficiency-high profitability (HEHP), High efficiency-low profitability (HELP), Low efficiency-high profitability (LEHP), and Low efficiency-low profitability (LELP). The HEHP group contained 54 units, which mostly contracted management fee type and had a high meal price. The units were also very large and, served three meals. Twenty of the units were operated with high labor cost: most of these were factories and hospitals. The LEHP group contained 20 units, that were mainly office stores of large scale and medium price. Fifty-four LELP group had a low meal price. A high performance group must have high efficiency, profitability, and satisfaction. The BCC score was over 0.969, the meal price was over 4,116 won, the food cost was over 2,077 won, and meal counts per month were over 10,212 meals.

신뢰성 보정된 발사체 개발비용 추정방안 연구 (Studies for Reliability-corrected Cost Estimation Methodology of Launch Vehicle Development)

  • 김홍래;유동서;장영근
    • 한국항공우주학회지
    • /
    • 제40권4호
    • /
    • pp.364-374
    • /
    • 2012
  • 본 연구에서는 발사체의 개념설계 단계 동안 성능 변수뿐만 아니라 신뢰성에 따른 개발비용 추정방안을 분석하고자 하였다. 과거에는 발사체의 개발비용을 예측하기 위해서 주로 발사체의 성능과 건조 질량 등을 독립변수로 하는 추정 방법이 많이 이용되었다. 이러한 접근 방법은 비교적 근사하였지만 신뢰성 수준에 따른 비용 변화를 반영할 수 없기 때문에 원하는 신뢰성을 가진 발사체의 개발비용을 근접하게 예측하기는 쉽지 않았다. 본 논문에서는 이러한 비용추정 방법의 한계를 개선하기 위해 성능과 질량을 기반으로 한 비용 모델인 TRANSCOST에 신뢰성 개념을 도입하여 발사체 비용을 추정할 수 있는 방법론을 제시하였다. 이를 기반으로 신뢰성에 따른 한국형발사체(KSLV- II)의 개발비용을 추정했다.

Adaptive and optimized agent placement scheme for parallel agent-based simulation

  • Jin, Ki-Sung;Lee, Sang-Min;Kim, Young-Chul
    • ETRI Journal
    • /
    • 제44권2호
    • /
    • pp.313-326
    • /
    • 2022
  • This study presents a noble scheme for distributed and parallel simulations with optimized agent placement for simulation instances. The traditional parallel simulation has some limitations in that it does not provide sufficient performance even though using multiple resources. The main reason for this discrepancy is that supporting parallelism inevitably requires additional costs in addition to the base simulation cost. We present a comprehensive study of parallel simulation architectures, execution flows, and characteristics. Then, we identify critical challenges for optimizing large simulations for parallel instances. Based on our cost-benefit analysis, we propose a novel approach to overcome the performance constraints of agent-based parallel simulations. We also propose a solution for eliminating the synchronizing cost among local instances. Our method ensures balanced performance through optimal deployment of agents to local instances and an adaptive agent placement scheme according to the simulation load. Additionally, our empirical evaluation reveals that the proposed model achieves better performance than conventional methods under several conditions.

FORECASTING THE COST AND DURATION OF SCHOOL RECONSTRUCTION PROJECTS USING REGRESSION ANALYSIS

  • Wei Tong Chen;Ying-Hua Huang;Shen-Li Liao
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.892-896
    • /
    • 2005
  • This paper collected 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake. Regression analysis was implemented to build the prediction model of the cost and the duration for the collected projects. It is found that the cubic regression models are capable for predicting the cost and the duration of the projects contracted by the central agency of which the contracting awarding approach was based on the most advantageous tendering (MAT) approach. On the other hand, power regression models are capable for predicting the cost and the duration of the projects contracted through the low bid tendering (LBT) approach. It is also found that the performance of the regression prediction model differs in accordance with organizations that contracted the reconstruction projects.

  • PDF