• Title/Summary/Keyword: Performance Testing System

Search Result 1,319, Processing Time 0.033 seconds

Monitoring and Analysis of 3kW Grid-Connected PV System for Performance Evaluation

  • So Jung-Hun;Jung Young-Seok;Yu Gwon-Jong;Choi Ju-Yeop;Choi Jae-Ho
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • v.5B no.1
    • /
    • pp.57-62
    • /
    • 2005
  • Grid-connected photovoltaic (PV) systems were installed and monitored at the field demonstration test center (FDTC) in Korea in October 2002. Before long-term field testing of installed PV systems, the performances of PV components were evaluated and compared through short-term performance tests of each of the PV system components such as power conditioning system and PV module under standard test conditions. A data acquisition system has been constructed for measuring and analyzing the performance of PV systems to observe the overall effect of environmental conditions on their operation characteristics. Performances of PV systems have been evaluated and analyzed not only for component perspective (PV array, power conditioning unit) but also for global perspective (system efficiency, capacity factor, electrical power energy) by review of the field test and loss factors of the systems. These results indicate that it is highly imperative to develop an optimum design technology of grid connected PV systems. The objective of this paper is not only to evaluate and analyze the performance of domestic PV systems application through long-term field testing at FDTC but also to develop evaluation, analysis and optimum technology for long-term stability and reliability of grid-connected PV systems in Korea.

A Development of Eddy Current Testing System for Steam Generators Inspection in Nuclear Power Plants (원전 증기발생기 와전류검사 시스템 개발)

  • Moon, Gyoon-Young;Cho, Chan-Hee;Yoo, Hyun-Joo;Lee, Tae-Hun;Cho, Yong-Bae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.9 no.1
    • /
    • pp.40-47
    • /
    • 2013
  • The capacity factor of nuclear power plant in Korea is the highest level in the world. However, the integrity assessment of nuclear power plant is depended on foreign country. Especially, most eddy current testing systems for inspecting steam generators in nuclear power plant are currently imported from USA, Canada, and so on. Therefore, the eddy current testing system can react more active and adaptive from economic and managerial standpoint for actual nuclear power plants in Korea is required. In this paper, an eddy current testing system for inspecting steam generators in nuclear power plants is introduced. Frequency generator, analog circuit, analog digital converter circuit, and digital control circuit are composed in eddy current testing system. A benchmarking of acquisition system and acquisition software, eddynet 11i made by Zetec, and modifications are carried out based on the test environment of Korea nuclear power plants. Finally, all eddy current apparatus are integrated to inspect steam generator tubes in nuclear power plants.

Interlaboratory Study for Proficiency Testing on the Water Toxicity Determinations by Acute Toxicity Test with Daphnia magna (국내 생태독성 분석기관에 대한 숙련도시험 결과 평가)

  • Kim, Jongmin;Shin, Kisik;Yu, Soonju;Kim, Myeong Ock;Choe, Sung Hun
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.6
    • /
    • pp.632-637
    • /
    • 2014
  • Proficiency testing by interlaboratory comparisons is used to determine the performance of individual laboratories. In order to verify the quality of acute toxicity testing with Daphnia magna, National Institute of Environmental Research in South Korea is regularly organizing interlaboratory comparisons to estimate the analytical accuracy of different laboratories. Total 58 laboratories located in South Korea took part in interlaboratory proficiency testing scheme with three proficiency testing samples. TU(Toxic Unit) values of each laboratory were determined and robust z-score was calculated in order to evaluate the proficiency levels. Based on the robust z-score classification, 74% of the participant laboratories showed a satisfactory performance (43 laboratories). The main reason of 'unsatisfactory' performance seemed to be considered that the unsuitable management of test organism incubation system and the lack of experience on the identification of the test organism condition by effect of toxicity.

The Study about Performance Test of Wind turbine (풍력발전기 출력성능 평가에 대한 연구)

  • Ko, Suk-Whan;Jang, Moon-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1348-1349
    • /
    • 2011
  • In this paper, The case of power performance test for 3MW wind-turbine system is introduced. For the verification of power curve and the certification of wind-turbine, power performance test is very important. This paper described the power testing results of a 3MW wind turbine and analysed an uncertainty about the testing. The measured power curves are very closely coincide with the calculated. Total uncertainty of measured data for Power Curve is 120~200kW in the rated power.

  • PDF

Standardization of Remote Testing Service for Mobile Applications (모바일 어플리케이션의 원격 시험 서비스에 대한 표준화 연구)

  • Han, Young-Geun;Chun, Jun-Ho;Lee, Hyun-Noh
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.281-287
    • /
    • 2015
  • The objective of this study is to provide mobile application developers with a standard testing system and service method. By using this testing service, the developers can test the functional performance and quality of their applications from remote sites through Internet. This service standard helps to test applications quickly, easily, and cheaply through the intuitional scenario graphical environment, and becomes a base for constructing a testing system which can be shared by developers, users, and the third parties.

GBAS Ground Testing and Performance Analysis at Gimpo International Airport (김포국제공항의 GBAS 지상시험 및 성능 분석)

  • Jeong, Myeong-Sook;Choi, Yunjung;Yun, Youngsun;Bae, Joongwon;Jun, Hyang-Sig;Lee, Young Jae
    • Journal of Advanced Navigation Technology
    • /
    • v.19 no.1
    • /
    • pp.22-32
    • /
    • 2015
  • Ground based augmentation system (GBAS) is a next generation radio navigation aids to support precision approach of aircraft. Recently, airports installing GBAS and providing GBAS service are increasing all over the world. For the first time in Korea, SLS-4000 which is the GBAS ground equipment of Honeywell had been installed at Gimpo International Airport in 2013, and evaluated its functionality and performance of through the ground testing. This paper introduces a ground test and evaluation criteria on the CAT-I GBAS system, and describes testing methods for GBAS ground testing of Gimpo International Airport. In addition, detail testing methods and analysis results on major five of 12 ground test items are described.

The Development on Train Detection System and Performance Testing on Automatic Changeover System in Neutral Section (절연구간 자동통과 열차검지시스템 개발 및 성능시험)

  • Han, M.S.;Chang, S.H.;Shin, M.C.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.3
    • /
    • pp.431-436
    • /
    • 2013
  • A neutral section is installed around feeding substation(SS) and sectioning post(SP) that M phase and T phase are isolated in AC feeding system. Electric Train under "Notch-OFF" is operated by inertia within the neutral section. It causes disturbing the operation of electric trains for speed drop and driver's mistakes. A automatic changeover system with thyristor recently have taken under development. In the paper, it is introduced the configuration of train detection system and performance testing on automatic changeover system..

Development of Charger/Discharger to Test Performance for EDLC (EDLC를 위한 성능시험용 충방전기 개발)

  • Kim, Geum-Soo;Moon, Jong-Hyun;Cho, Hyun-Cheol;Kim, Dong-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.7
    • /
    • pp.16-22
    • /
    • 2012
  • With the increase of consumption of new renewable energy, the use of Electric Double Layer Capacitor(EDLC) is being gradually widened as the next generation energy storage device. In order to expand the market of EDLC which is recently receiving a lot of attraction as a new promising area, development of a charge/discharge cycle tester to measure and test performance, is essential. Therefore, this research designed a circuit to measure capacity and internal resistance and a circuit to measure voltage maintenance properties, based on EDLC's basic charging/discharging properties so it is able to measure the state of charge and discharge at high speed. When evaluating performance characteristics, the 5[V]/100[A] prototype-EDLC charge/discharge testing system developed for this research showed ${\pm}0.1$[%] of accuracy of voltage and current measurement. It was also proved that the developed charge/discharge testing system for EDLC can be applied to the actual industry, when testing the entire system using a program produced for data monitoring and acquisition.

Performance Evaluation of SG Tube Defect Size Estimation System in the Absence of Defect Type Classification (결함 형태 분류 과정이 필요없는 SG 세관 결함 크기 추정 시스템의 성능 평가)

  • Jo, Nam-Hoon
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.30 no.1
    • /
    • pp.13-19
    • /
    • 2010
  • In this paper, we study a new estimation system for the prediction of steam generator tube defects. In the previous research works, defect size estimators were independently designed for each defect types in order to estimate the defect size. As a result, the structure of estimation system is rather complex and the estimation performance gets worse if the classification performance is degraded for some reason. This paper studies a new estimation system that does not require the classification of defect types. Although the previous works are expected to achieve much better estimation performance than the proposed system since it uses the estimator specialized in each defect, the performance difference is not so large. Therefore, it is expected that the proposed estimator can be effectively used for the case where the defect type classification is imperfect.

Development and Reliability Verification of Quality Control System for Compaction Grouting Method (컴팩션 그라우팅 공법의 품질관리 시스템 개발 및 신뢰성 검증)

  • Seo, Seok-Hyun;Lee, Jung-Sang;Jung, Eui-Youp;Park, Sang-Yeong;Lee, Hyo-Bum
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.4
    • /
    • pp.11-20
    • /
    • 2020
  • This study introduced the compact grouting method that can be used for improving soft ground and restoring buildings with unequal subsidence. The pump used in the traditional compact grouting method is a system that injects one hole each, which reduces the construction efficiency, and the analog injection method manually manages the construction by field workers, making it difficult to manage consistent quality. Pump and quality control system were developed to solve problems in existing construction. Since field supervisor determines amount of injected materials by using analog equipment and controls manually, it is difficult to manage consistent quality of construction. Therefore, the quality control system was developed in order to solve that problem. The quality control system consists of automatic mixing system of injection materials, multiple simultaneous injection pumps, and injection management monitoring system. Performance of the quality control system was verified through on-site testing, and ground improvement performance was verified through quality testing after testing and testing of the compact grouting method. Therefore, it is expected that the integrated quality control system developed will improve the quality assurance and efficiency and stability of construction at sites where construction and quality verification are difficult.