• Title/Summary/Keyword: Performance Testing System

Search Result 1,319, Processing Time 0.03 seconds

A Study on Reality and Quality Improvement of Aviation Security Equipments Performance Certification System in Korea (항공보안장비 성능 인증제의 현실과 품질개선에 관한 연구)

  • Lee, Wonjoo;You, Sangwoo;Park, Soohong;Kim, Kyunghoon;Seol, Eunsuk;Han, Soojin;Park, Seoha;Lee, Jisu;Kim, Chanhwi;Kang, Jingu;Lee, Kiyoung
    • Journal of Korean Society for Quality Management
    • /
    • v.49 no.2
    • /
    • pp.113-125
    • /
    • 2021
  • Purpose: This study focused on reality and quality improvement of aviation security equipment performance certification system. Methods: For this propose, we analyzed aviation security equipment performance certification system related legislations. Using analyzed data, we suggested advancement plan of aviation security equipment performance certification system. Results: In results, South Korea has been implementing aviation security performance certification system since October 2018. Parts for improvement of system are mutual certification with major countries that operate aviation security equipment performance certification systems, the spread of the defense industry's system, development of similar substances for handling explosives, and introduction of preliminary inspections. Conclusion: The research result could be used as a basic data for upgrading Korea's aviation security performance certification system.

Testing System for Automotive Software Using a General Purpose Development Board (범용 개발 보드를 이용한 차량용 소프트웨어 테스트 시스템 개발)

  • Kum, DaeHyun;Hong, JaeSeung;Jin, SungHo;Cho, JeongHun
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.7 no.1
    • /
    • pp.17-24
    • /
    • 2012
  • Recently automotive software has been more complex and needs to be reduced its development time. Software testing of its functionalities and performance should be conducted in an early development phase to reduce time to market and the development cost. Software functional testing can be performed through simulating the hardware, but it is not guaranteed that evaluation of real-time performance using simulation has enough accuracy. Real-time performance can be precisely evaluated with hardware-in-the-loop simulation, but it costs time and effort to set up hardware for testing. In this paper, we suggest a testing system that can evaluate functional requirements and real time properties with a general-purpose development board in the early development phase. In addition, we improve reusability of the testing system through modularized and layered architecture. With the proposed testing system we can contribute to building reliable testing system at low cost without difficulty.

A Study on the Development of Testing Models and Its Design System for the Comprehensive Performance Test of the Substation Automation System (변전자동화 종합 성능시험을 위한 시험모델 및 설계시스템 개발에 관한 연구)

  • Lee, Nam-Ho;Jang, Byung-Tae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.7
    • /
    • pp.63-71
    • /
    • 2011
  • Due to the rapid development of digital technnology and informantion communication, in the IEC 61850 based substation automation system, the innovative paradigm shift is expected and also required in many substation-related jobs, especially in the device function test area Accordingly a common testing model which can simplify the complex contents of the SAS performance test performed by test engineers has been identified, that can overcome limitations of engineers' own testing knowledge and experience. Testing models and its design system for the comprehensive performance test of the Substation Automation System is developed and the result of the study is reported in this paper.

Proposed Performance Criteria and Evaluation Procedures for Transmission System Planning in Korea

  • Kook, Kyung-Soo;Kim, Taihyun;Oh, Tae-Kyoo;Bang, Min-Jae
    • KIEE International Transactions on Power Engineering
    • /
    • v.2A no.4
    • /
    • pp.160-165
    • /
    • 2002
  • This paper describes a proposed performance criteria and evaluation procedures for transmission system planning in Korea. Performance criteria of the transmission system are expected to be used as a guideline for investment into a transmission network. Moreover, performance evaluation procedures, which are based on current practices and widely accepted theories, are suggested to achieve fair and acceptable results.

Development of Performance Testing Tool for Railway Signaling System Software

  • Hwang, Jong-Gyu;Jo, Hyun-Jeong
    • International Journal of Safety
    • /
    • v.10 no.2
    • /
    • pp.16-20
    • /
    • 2011
  • The computer application on embedded system is recently more increased in accordance of the development of computer technology. In this trend, the depending of SW in embedded system, especially railway signaling system, is being increased further. So the testing for the safety of railway signaling system software became more important. Hence, the safety assurance of the vital software on the railway signaling system is very important but yet, not many works have been done. In this paper, we represented the implementation results of development of performance testing tool in railway signaling system. The implemented testing item had referred to the international standards in relation to the software for railway system, such as IEC 61508 and IEC 62279.

  • PDF

The study on construction of the practical testing ground of grid-connected photovoltaic system (태양광발전 계통연계 실증시험장 구축에 관한 연구)

  • Kim, Euihwan;Jang, Juyeon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.65.2-65.2
    • /
    • 2010
  • Currently the variety of governmental business support and research for supplying solar energy have been actively progressed. As of now, however, There are no practical testing infrastructures of grid-connected photovoltaic system which test performance of solar power facility in domestic. Therefore, in KEPRI, there is in progress construction of practical testing ground of 500 kW class grid-connected PV System for developing the evaluation of the performance technology including the Module, PCS, and etc, that is the important instrument of the PV System, in Gochang area. It analyzed the site creation work for constructing the practical testing ground and new construction of control room and the unit standards, specifications and capacity of required equipment. For the system detailed design, configuration, instrument-specific parameters established, power generation predictions of Array Type and the components of testing ground are needed to build.

  • PDF

Testing method analysis for performance verification in Light Rail Transit signalling system (LRT 신호시스템에서 성능검증을 위한 시험방법 분석)

  • Cho, B.K.;Hwang, H.C.;Lee, H.Y.;Ryu, S.H.
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1722-1728
    • /
    • 2007
  • This study analysed testing method for performance verification in the phase of signalling system development for application in the Light Rail Transit(LRT). The main focus in this study therefore includes development of vehicle location detection system by first GPS and analysis of performance verification method by field testing. The comprehensive testing method has been analysed for the signalling system for LRT high speed operation. The signalling system for LRT high speed operation deals with vehicle location identification through vehicle location information using the second GPS and decision for whether the high speed proceed signal and departure inhibition output is feasible or not and for signalling output to the corresponding vehicle.

  • PDF

A Hybrid Cloud Testing System Based on Virtual Machines and Networks

  • Chen, Jing;Yan, Honghua;Wang, Chunxiao;Liu, Xuyan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.4
    • /
    • pp.1520-1542
    • /
    • 2020
  • Traditional software testing typically uses many physical resources to manually build various test environments, resulting in high resource costs and long test time due to limited resources, especially for small enterprises. Cloud computing can provide sufficient low-cost virtual resources to alleviate these problems through the virtualization of physical resources. However, the provision of various test environments and services for implementing software testing rapidly and conveniently based on cloud computing is challenging. This paper proposes a multilayer cloud testing model based on cloud computing and implements a hybrid cloud testing system based on virtual machines (VMs) and networks. This system realizes the automatic and rapid creation of test environments and the remote use of test tools and test services. We conduct experiments on this system and evaluate its applicability in terms of the VM provision time, VM performance and virtual network performance. The experimental results demonstrate that the performance of the VMs and virtual networks is satisfactory and that this system can improve the test efficiency and reduce test costs through rapid virtual resource provision and convenient test services.

An Experimental Study on the Fire Resistance Performace of Intumescent Coating System by Environmental Testing Procedure (환경시험방법에 의한 내화도료의 내화성능에 관한 실험적 연구)

  • Park, Soo-Young;Sung, Si-Chang;Choi, Dong-Ho;Kim, Dae-Hoi;Lee, Sea-Hyun;Lee, Jong-Chan
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.69-72
    • /
    • 2008
  • This study is designed to understand changes in fire resistance performance of intumescent coating system through follow-up tests on temperature of unexposed surface for the domestic intumescent coating system by environmental testing procedure.

  • PDF

The Analysis of COVID-19 Pooled-Testing Systems with False Negatives Using a Queueing Model (대기행렬을 이용한 위음성률이 있는 코로나 취합검사 시스템의 분석)

  • Kim, Kilhwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.4
    • /
    • pp.154-168
    • /
    • 2021
  • COVID-19 has been spreading all around the world, and threatening global health. In this situation, identifying and isolating infected individuals rapidly has been one of the most important measures to contain the epidemic. However, the standard diagnosis procedure with RT-PCR (Reverse Transcriptase Polymerase Chain Reaction) is costly and time-consuming. For this reason, pooled testing for COVID-19 has been proposed from the early stage of the COVID-19 pandemic to reduce the cost and time of identifying the COVID-19 infection. For pooled testing, how many samples are tested in group is the most significant factor to the performance of the test system. When the arrivals of test requirements and the test time are stochastic, batch-service queueing models have been utilized for the analysis of pooled-testing systems. However, most of them do not consider the false-negative test results of pooled testing in their performance analysis. For the COVID-19 RT-PCR test, there is a small but certain possibility of false-negative test results, and the group-test size affects not only the time and cost of pooled testing, but also the false-negative rate of pooled testing, which is a significant concern to public health authorities. In this study, we analyze the performance of COVID-19 pooled-testing systems with false-negative test results. To do this, we first formulate the COVID-19 pooled-testing systems with false negatives as a batch-service queuing model, and then obtain the performance measures such as the expected number of test requirements in the system, the expected number of RP-PCR tests for a test sample, the false-negative group-test rate, and the total cost per unit time, using the queueing analysis. We also present a numerical example to demonstrate the applicability of our analysis, and draw a couple of implications for COVID-19 pooled testing.