• 제목/요약/키워드: Performance Certification

Search Result 608, Processing Time 0.029 seconds

KSR-III 1단 롤 자세제어 시스템 인증시험

  • Jung, Ho-Lac;Jeon, Sang-Woon;Kim, Ji-Hun
    • Aerospace Engineering and Technology
    • /
    • v.2 no.1
    • /
    • pp.124-132
    • /
    • 2003
  • The function and performance test of the developed sub-system should be conducted before integrating into the total system. For the successful achievement of the flight test, the integration tests of sub-systems must be performed to eliminate and prevent abnormal conditions, which may happen due to ground problems, Electro-Magnetic Interference noises, and so on. This paper describes the certification test procedure and results for the roll axis attitude control system of Korea Sounding Rocket-III.

  • PDF

A Certification Protocol based on Broadcast Invalidation Approach (브로드케스트 무효화 기법을 이용한 인증 프로토콜)

  • Sung-Ho Cho;Min-Goo Kang
    • Journal of Internet Computing and Services
    • /
    • v.3 no.6
    • /
    • pp.79-89
    • /
    • 2002
  • The performance of OCC is very sensitive to the transaction abort rate, Even if the abort probability can be reduced by re-ordering, most of re-ordering schemes have space overhead in maintaining a graph or histories, In this paper, we proposed an efficient re-ordering scheme based on a broadcast invalidation mechanism. Our scheme, called CBI, can reduce the abort probability without space overhead in maintaining a graph or histories, By simulation studies, we showed that CBI reduced the abort rate and unnecessary operations, Additionally, we showed that CBI outperforms not only BTS but also TSH with low space overhead.

  • PDF

The Sequential Rectifying Inspection for the Constraint of Motor Vehicle Emission (자동차배출(自動車排出)가스 규제(規制)를 위한 수정(修正)된 축차검사계획(逐次檢査計劃))

  • Jo, Jae-Rip
    • Journal of Korean Society for Quality Management
    • /
    • v.17 no.1
    • /
    • pp.48-59
    • /
    • 1989
  • The motor vehicle emission is expected to be constrained strongly in the future in accordance with the current policy as to prevention of air pollution. This paper establishes a sequential rectifying inspection plan which satisfies the standard motor vehicle emission for the automobile producers who are currently producting the automobiles with catalytic converts. This plan also considered the constraint of the effective motor vehicle emission by way of rectifying the certification test in the past. In order to evaluate the performance of the inspection plan, the recent certification test data have also been applied. The result of the application has proved that the rectified sequential inspection plan presented in this paper satisfies the standard motor vehicle emission and can be the optimal economic inspection plan. As a result the inspection plan given in this paper will be contributed to constrain the motor vehicle emission most effectively.

  • PDF

Reliability Assessment Criteria of Wiper Motor for Automobiles (자동차용 와이퍼 모터의 신뢰성평가기준)

  • Choi, Man-Yeop;Shin, Wae-Gyeong;Jeong, Hai-Sung;Baik, Jai-Wook
    • Journal of Applied Reliability
    • /
    • v.9 no.3
    • /
    • pp.195-218
    • /
    • 2009
  • Wiper motors are used in every automobile. They are exposed to a very diverse environment and consists of several components and, therefore needs careful approach to the enhancement and assessment of reliability of the item. In this article reliability standards for wiper motors are established in terms of quality certification test and failure rate test.

  • PDF

Organization and Qualification Documents for Generation of Composite Materials Property (복합재 물성치 생성을 위한 조직체계 및 인증문서)

  • Rhee, Seung Yun;Suh, Jang Won
    • Journal of Aerospace System Engineering
    • /
    • v.7 no.4
    • /
    • pp.55-61
    • /
    • 2013
  • In recent years, NASA, FAA and the aerospace industry, through MIL-HDBK-17 and the NASA-conceived AGATE(Advanced General Aviation Transport Experiments) program, have worked together to reduce the qualification burden imposed on individual aircraft manufacturers. AGATE is one of the most successful public/private cost-haring partnerships ever conceived, bringing together academia, the FAA, other government agencies and industry to develop affordable new technologies and accompanying industry standards and certification methods. In 2005, NASA established NCAMP(National Center for Advanced Materials Performance) with the purpose of refining and enhancing the AGATE process to a self-sustaining level to serve the entire aerospace industry in partnership with CMH-17, FAA, and SAE. In this paper, I will introduce briefly NCAMP process and explain its organization structure and core NCAMP documents. This paper can provide some help in establishing our certification system for composite materials where the NCAMP process is expected to be the most good model.

Study on Certification Policy for Stabilization of Photovoltaic Industry - A Case Study of PV Power Plant O&M - (태양광발전소 O&M 관리를 통한 발전성능 향상 방안)

  • Ahn, Hyewon;Cho, Yongsung
    • Journal of Climate Change Research
    • /
    • v.6 no.2
    • /
    • pp.105-111
    • /
    • 2015
  • With PV market extension, Operation & Maintenance (O&M) went on the floor as an effective method so solve the reduction phenomenon of Performance Ratio (PR) of PV power plant and as a new business model of photovoltaic industry. This study chose institutionalization of O&M to vitalize domestic photovoltaic industry improving level of photovoltaic technology and dominate the market in advance. The result of analyzing advanced researches and domestic cases indicates that O&M is essential of operating PV power plant, therefore, now is the time for a systematic approach to establish O&M policy.

An Empirical Study on the Relationship among the Objectives of the Certification System, the Preparation and Results of Certification, and the Performance of Perceived Certifications in the Institutional Accreditation System of College (전문대학의 기관평가인증제에 있어서 인증제의 목표, 인증의 준비와 결과, 지각된 인증의 성과 간의 관계에 관한 실증연구)

  • Yun, Mun-Do;Seo, Young Wook
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.6
    • /
    • pp.524-540
    • /
    • 2019
  • We researched about the relationship among the Purpose of Assessment Certificate System, the preparation result, certificate, and, the performance of the assessment certificate on the purpose of the empirical analysis. For the testing of a research model, we tested 170 samples that our colleges tested by The Assessment Certificate System. As a result of the analysis; there are positive and causal effect relationships among the three variables. This study result will expansion and help to maintain performance growth in the college. In the future, the research about the improvement of management performance are needed.

A Study on Floor Slip Resistance Standard and Test Method for BF Certification (BF인증을 위한 바닥 마감재 미끄럼 성능기준 및 측정방법에 대한 연구)

  • Shin, Dong-Hong;Seong, Ki-Chang;Park, Kwang-Jae
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.25 no.3
    • /
    • pp.75-83
    • /
    • 2019
  • Purpose: There are no clear criteria for slip performance in the BF certification process, so the evaluator relies on subjective judgments depending on the field situation. Physical criteria for determining the slip performance of various floor finishes are not clear. C.S.R., the only criterion currently being used to check slip performance, may raise questions about its coverage, feasibility and reliability. Method: For an analysis of domestic standards and status, KS L 1001, KS M 3510, and KS F 2375. External standards are analyzed for ADA Standard, ANSI Standard, and BS EN Standard. Analyze the test methods and evaluation criteria of O-Y-PSM, BPT, and the dynamic slip resistance test used in these criteria. It also presents an improvement plan for the rational presentation of standards. Results: To date, various kinds of test methods and measuring devices of the slip resistance coefficient have been developed, but there are not many ways to trust useful results related to user safety. Reliability and thoroughly verified test methods and criteria should be used to assess the slip performance of the floor. In order to improve the standard for the evaluation of slip performance in Korea, the existing standard should first be raised to the same level as the overseas standard, and the application of the discriminatory standard should be applied considering the characteristics and usage patterns of each space. Implication: Currently, Korean standards propose various test methods, but the proper use of test methods, scope and assessment criteria are not established, so improvement of the comprehensive standard is necessary.

A Review on the Performance Criteria of Equipment Required for Asbestos Removal (석면 해체.제거 작업에서 사용되는 장비의 성능 기준에 관한 고찰)

  • Lee, Naroo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.23 no.3
    • /
    • pp.212-221
    • /
    • 2013
  • Objectives: Asbestos fibers are accumulated in negative pressure unit (NPU) or vacuum cleaner in asbestos removal. Failure of operation or poor use performance of the NPU or vacuum cleaner causes asbestos fibers to spread in the air. Asbestos contractors should have an NPU fitted with a HEPA , vacuum cleaner, decontamination area, respirators, wetting equipment, and differential pressure manometer to register with the Ministry of Employment and Labor. There should be performance criteria of equipment used in asbestos removal. But there are none such criteria used in asbestos removal. This study was performed to investigate international or national performance criteria of equipment used in asbestos removal. Methods: Regulations, approved code of practice, guidance and national standards of the UK, USA and Korea were reviewed. A survey was done to investigate the requirements for equipment used in asbestos removal in Korea. Results: Air flow of NPUs used in Korea usually covers from$500m^3/h$ to over $3000m^3/h$. Some requirements for NPUs used in Korea were missing compared to the requirements of British standards for NPUs. All NPUs have different missing requirements. The UK also has separate British standard for leak tests for NPUs. Highly hazardous class vacuum cleaners should be used in asbestos removal in the UK. It has national standards on the operation of vacuum cleaners used in asbestos removal. There is only a certification system for less than 2.5kw rated voltage vacuum cleaners for home use in Korea. Powered (-assisted) respirators with mask are recommended in asbestos removal. Type 5 coveralls should be used in asbestos removal in the UK. There are international standards for requirements and leak tests of type 5 coveralls. A manometer for measuring differential pressure is needed in asbestos removal. The manometer's measuring range should cover less than ${\pm}125$ Pa and the gradation of manometer should be less than 2.5 Pa. The definition of decontamination area should be corrected. Installation of airlock and minimum area should be considered in decontamination area. Conclusions: Equipment should be used in asbestos removal proper performance and no leaks. There should be a certification system for equipment used in asbestos removal. This study can help to a certification system for equipment used in asbestos removal in Korea.

Analysis of the Weight for the Required Performance Items of Lightweight Wall through the Test-bed and AHP Method (테스트베드 구축과 AHP기법을 통한 경량벽체 요구성능의 중요도 분석)

  • Lee, Hak-Ju
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.105-106
    • /
    • 2015
  • As the Long-life certification system is recently introduced in the Housing Law in Korea, it is expected that an application of the lightweight wall panel will be increased in apartment construction as the main wall system. However, the performance criteria for lightweight wall is in the early phase of its action. Therefore, it is necessary to establish the performance criteria properly by investigating performance requirement in the user's perspective. The purpose of this study is to identify of the weight of the required performance items for the lightweight wall in apartment house. To analyze the priority in the performance, an interview survey is performed; after monitering the test-bed of the lightweight walls, user and experts evaluate the performance requirements. The weight of the performance requirement is developed by AHP method.

  • PDF