• Title/Summary/Keyword: Peak operation

Search Result 806, Processing Time 0.032 seconds

A Study on Effective Operation of Wage Peak System in Korean Enterprises (임금피크제의 효과적 운용방안)

  • Park, Su-young;Lee, Sang-kyung
    • Journal of the Korea society of information convergence
    • /
    • v.5 no.2
    • /
    • pp.49-58
    • /
    • 2012
  • Korea has entered into an aging society at an exceptionally high speed. Increasing aged workers give pressure on Korean companies with seniority based pay system with labor costs. The wage peak system has been introduced to Korean companies as an alternative to early retirements. The wage peak system currently adopted in Korea is mainly the aging-limit-security model. But in the future we should actively adopt the employment-extension model. To operate wage peak system successfully, I suggest introduction of the individual wage peak system, development of suitable jobs for the aged, selective application by job classification, incentive graded by performance evaluation, and working hour reduction with the decreased rate of wage.

  • PDF

Development of Optimal Operation Algorithm about CES Power Plant (CES 발전소의 최적운용 알고리즘 개발)

  • Kim, Yong-Ha;Park, Hwa-Yong;Kim, Eui-Gyeong;Woo, Sung-Min;Lee, Won-Ku
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.2
    • /
    • pp.61-70
    • /
    • 2012
  • Recently due to the increasing of the importance on the green energy is getting higher by implementing EERS(Energy Efficiency Resource Standards) and NA(Negotiated Agreement) such as lacks of natural resources and The United Nations Framework Convention on Climate Change. And the most practical solution is CHP(Combined Heat and Power) which performs the best energy efficiency. This paper developed optimal operation mechanism of CES(Community Energy System) for enhancement of energy efficiency using CHP(Combined Heat and Power), PLB(Peak Load Boiler) and ACC(ACCumulator) capacities. This method optimally operated these capacities calculated the maximum profits by Dynamic Programing. Through the case studies, it is verified that the proposed algorithm of can evaluate availability.

Comparative Analysis of Charging Modes of Series Resonant Converter for an Energy Storage Capacitor (에너지저장 커패시터의 최적 충전을 위한 직렬공진형 컨버터의 운용 모드 비교)

  • Lee, Byung-Ha;Kang, Tae-Sub;Cha, Han-Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.3
    • /
    • pp.394-400
    • /
    • 2012
  • In this paper, charging modes of series resonant converter for a high voltage energy storage capacitor are compared in terms of charging time, peak resonant current, normalized peak resonant current and voltage in each operation mode. Operating principles of the full bridge series resonant converter with capacitor load are explained and analyzed in discontinuous and continuous operation mode. Based on the analysis and simulation result, $0.6{\omega}_r$ < ${\omega}_s$ < $0.75{\omega}_r$ and $1.3{\omega}_r$ < ${\omega}_s$ < $1.4{\omega}_r$ are evaluated to the best range of switching frequency for charging of an high voltage energy storage capacitor. 1.8 kJ/s SRC prototype is assembled with TI 28335 DSP controller and 40 kJ, 7 kV energy storage capacitor. Design rules based on the comparative analysis are verified by experiment.

Selection of Coupling Factor for Minimum Inductor Current Ripple in Multi-winding Coupled Inductor Used in Bidirectional DC-DC Converters

  • Kang, Taewon;Suh, Yongsug
    • Journal of Power Electronics
    • /
    • v.18 no.3
    • /
    • pp.879-891
    • /
    • 2018
  • A bidirectional dc-dc converter is used in battery energy storage systems owing to the growing requirements of a charging and discharging mode of battery. The magnetic coupling of output or input inductors in parallel-connected multi modules of a bidirectional dc-dc converter is often utilized to reduce the peak-to-peak ripple size of the inductor current. This study proposes a novel design guideline to achieve minimal ripple size of the inductor current under bidirectional power flow. The newly proposed design guideline of optimized coupling factor is applicable to the buck and boost operation modes of a bidirectional dc-dc converter. Therefore, the coupling factor value of the coupled inductor does not have to be optimized separately for buck and boost operation modes. This new observation is explained using the theoretical model of coupled inductor and confirmed through simulation and experimental test.

An Estimation method for Characteristic Parameters in a Low Frequency Signal Transformed by High Frequency Signals (고주파 신호에 의하여 변형된 저주파신호에서의 특성변수 추정 기법)

  • Yoo, Kyung-Yul
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.51 no.2
    • /
    • pp.86-88
    • /
    • 2002
  • An estimation method for the characteristic parameters in the low frequency signal is proposed in this paper. A low frequency signal is assumed to be modulated or distorted by high frequency terms. The algorithm proposed in this paper is designed to select set of local maximums in a successive manner, hence it is denoted as the iterative peak picking(IPP) algorithm. The IPP algorithm is operating in the time domain and is using only the comparison operation between two neighboring samples. Therefore, its computational complexity is very low and the delay caused by the computation is negligible, which make the real-time operation possible with economic hardware. The proposed algorithm is verified on the pitch estimation of speech signal and blood pulse estimation.

A study on the Operating Characteristics of the Capsule-type Ice Storage System (캡슐형 빙축열 시스템의 운전특성에 관한 연구)

  • Kim, Kyung-Hwan;Cho, Sung-Woo;Choi, Jeong-Min;Ha, Suk-Young
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.199-204
    • /
    • 2005
  • The decrease of summer peak electric load of our country is very important. The government is arranging a lot of support policies and statutes. etc. to decrease of peak electric load. And ice storage system is known as one of the alternatives. The purpose of this study is to collect basic data for operating characteristics to plan the most suitable operation of capsule-type ice storage system. The storaging tank is designed to take charge 40% of total cooling load in building, In operation condition the storage tank took charge 50%. Coefficient Of Performance of daily screw refrigerator is around 4.

  • PDF

Input Current Ripple Reduction Algorithm for Interleaved DC-DC Converter (다상 DC-DC 컨버터의 입력 전류 리플 저감 제어 알고리즘)

  • Joo, Dong-Myoung;Kim, Dong-Hee;Lee, Byoung-Kuk
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.19 no.3
    • /
    • pp.220-226
    • /
    • 2014
  • Input current ripple and harmonic components of the power device are main causes of electromagnetic interference (EMI). Although the discontinuous conduction mode (DCM) operation can reduce harmonic components of the power device by reducing reverse recovery current of diode and turn-off voltage spikes of the switch, input current ripple increases due to high peak to peak inductor current. Therefore, in this paper, frequency control algorithm is proposed to reduce the input current ripple of DCM operated interleaved boost converter. In the proposed algorithm, duty ratio is fixed either 0.33 or 0.67 to minimize the input current ripple and the switching frequency is controlled according to operating conditions. 600 W 3-phase interleaved boost converter prototype system is built to verify proposed algorithm.

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( II ) - Simulation of Historical Flood Events - (퍼지제어모형을 이용한 다목적 댐의 홍수조절모형 (II) - 과거홍수사상에 대한 적용 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.1 s.12
    • /
    • pp.41-50
    • /
    • 2004
  • The objective of this study is to investigate the feasibility of the developed Fuzzy control techniques in dam operation. The simulated results for the 1984, 1990, and 1995 flood events are compared with historical operation results in the view of flood control and disaster prevention. The three models developed in this study determine the outflows based on the two conditions the first one is to consider only two inputs such as reservoir water level and inflow, for operation of the existing situations, the second one is that the possible maximum discharge from each dam does not exceed the allowable design maximum discharge for disaster prevention in downstream area. As the results, it was shown that the suggested models based on Fuzzy control technique could reduce both the peak water level and the maximum peak discharge compared with the historical operation results.

Program Cache Busy Time Control Method for Reducing Peak Current Consumption of NAND Flash Memory in SSD Applications

  • Park, Se-Chun;Kim, You-Sung;Cho, Ho-Youb;Choi, Sung-Dae;Yoon, Mi-Sun;Kim, Tae-Yun;Park, Kun-Woo;Park, Jongsun;Kim, Soo-Won
    • ETRI Journal
    • /
    • v.36 no.5
    • /
    • pp.876-879
    • /
    • 2014
  • In current NAND flash design, one of the most challenging issues is reducing peak current consumption (peak ICC), as it leads to peak power drop, which can cause malfunctions in NAND flash memory. This paper presents an efficient approach for reducing the peak ICC of the cache program in NAND flash memory - namely, a program Cache Busy Time (tPCBSY) control method. The proposed tPCBSY control method is based on the interesting observation that the array program current (ICC2) is mainly decided by the bit-line bias condition. In the proposed approach, when peak ICC2 becomes larger than a threshold value, which is determined by a cache loop number, cache data cannot be loaded to the cache buffer (CB). On the other hand, when peak ICC2 is smaller than the threshold level, cache data can be loaded to the CB. As a result, the peak ICC of the cache program is reduced by 32% at the least significant bit page and by 15% at the most significant bit page. In addition, the program throughput reaches 20 MB/s in multiplane cache program operation, without restrictions caused by a drop in peak power due to cache program operations in a solid-state drive.

A Study on the Generator Operation by the Electronic Consumption During the Summer in a Complex Building Cluster (복합시설의 하절기 전력사용량에 따른 발전기 가동현황 분석)

  • Kwon, Han-Sol;Kong, Dong-Seok;Kwak, Ro-Yeul;Huh, Jung-Ho
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.126-131
    • /
    • 2008
  • The large buildings in Korea usually use the generators to control the peak load of electronic consumption during the summer. It is necessary that these generators emit carbon dioxide, since they use gas or gasoline for their fuel. This study is to analyze the data of electronic consumption and operation of the generators at COEX, one of the representative complex building clusters in Korea, and to compare to the amount of carbon dioxide emitted per 1kWh from the domestic power plant by analogizing the frequency of using the generator during the summer and the amount of fuel consumption by the capacity of the generator and estimating the amount of carbon dioxide emitted from the generator.

  • PDF