• 제목/요약/키워드: Past construction cost

검색결과 113건 처리시간 0.032초

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999 (A Study on the Construction Cost Index for Calculating Conceptual Estimation : 1970-1999)

  • 남송현;박형근
    • 대한토목학회논문집
    • /
    • 제40권5호
    • /
    • pp.527-534
    • /
    • 2020
  • 건설공사를 진행하는데 있어 중요한 요소 중 하나는 가격이다. 정확한 예정가격을 산정하기 위해 기본 및 세부 설계 단계에는 단가산출에 따라 가격을 산정하고 이를 토대로 건설공사의 경제성을 평가하고 진행여부를 판단한다. 국내에서는 건설공사비 가격변동을 손쉽게 조정할 수 있도록 건설연구원을 통해 건설공사비 지수를 산정하여 2004년부터 발표하고 있다. 그러나 2000년도 1월부터 지수가 산정되어 지수 발표 이전 시기의 건설공사비 자료를 사용하지 못하는 실정이다. 과거 공사비를 이용한 개략공사비 산출을 위해 건설공사비 지수를 구성하는 생산자 물가지수와 건설업 시중노임 조사를 통해 변인들을 산정하였다. 다수의 변인 중 상관분석을 통해 유의한 독립변수를 선정 후 다중회귀분석을 통해 1970년도부터 1999년까지의 건설공사비 지수를 산정하여 제시하였다. 본 연구는 2000년대 이전의 과거 공사비를 활용한 개략공사비 산정방법을 제시한 부분에 중요한 의의를 가진다.

THE TREND OF CONSTRUCTION COST INDICES AND THEIR APPLICATIONS

  • Yoo-Sub Lee;Seung-Hyun Lee;Tai-Kyung Kang
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.908-912
    • /
    • 2005
  • Construction Cost Indices are values for measuring fluctuations in direct construction costs which include material costs, labor costs, and equipment costs for construction operations. In Korea, Korea Institute of Construction Technology (KICT) has been assessing and announcing these indices since January, 2004. The main goals of this paper are to look over the calculation process for those indices and then present the trend in construction costs according to the types of facilities with the past construction cost index data. Also, this paper traces the origin of the occurrence of significant changes on those indices through the further analysis of the trend. In addition, this paper shows the practicality of the indices and the way how to put them to practical use. An alternative estimate method using the indices is suggested for compensating the changes of construction costs caused by price fluctuations.

  • PDF

BIM 기반 개산견적을 위한 DB구축 기초연구 (Preliminary Study on the Construction of Database for BIM-based preliminary estimate.)

  • 전기현;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델 (Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network)

  • 한형동;김정환;윤중호;서종원
    • 대한토목학회논문집
    • /
    • 제31권6D호
    • /
    • pp.829-837
    • /
    • 2011
  • 공사비 견적이란 건설공사를 수행하는데 소요되는 공사비를 산정하는 것으로, 공사 기획단계에서 사용하는 개략견적은 다양한 목적으로 사용된다. 한편, 도로공사의 경우, 현행 사용되는 개략견적방법은 과거의 실적자료를 산술평균하여 단위 km당 공사비를 제시한 것으로 실제 개략공사비로 활용하기에는 어려움이 있다. 본 연구에서는 기획단계의 도로공사견적 산정방식에 대한 한계를 해결하기 위하여, 인공신경망을 적용한 개략공사비 모델을 제시하는 것을 목적으로 한다. 도로건설 공사입찰을 위한 기본설계도면 작성 이후 공사비를 결정하는 변수를 포함한 과거 실적 자료를 바탕으로 인공신경망을 적용하여 기획단계에서 공사비 예측이 가능한 도로 공사비를 개략견적 하는 모델을 설계하였으며, 시행착오방식을 이용하여 모델의 변수들을 최적화하였다. 또한 최적화된 모델을 통해 나온 결과를 회귀분석을 적용한 결과와 비교하여 정확도가 뛰어남을 검증하였다. 제안된 인공신경망모델은 차후 도로건설공사의 개략공사비 산정을 위한 활용될 것으로 기대된다.

Prediction of duration and construction cost of road tunnels using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Ali, Hunar Farid Hama;Nejati, Hamid Reza;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • 제28권1호
    • /
    • pp.65-75
    • /
    • 2022
  • Time and cost of construction are key factors in decision-making during a tunnel project's planning and design phase. Estimations of time and cost of tunnel construction projects are subject to significant uncertainties caused by uncertain geotechnical and geological conditions. The Gaussian Process Regression (GPR) technique for predicting ground condition and construction time and cost of mountain tunnel projects is used in this work. The GPR model is trained with data from past mountain tunnel projects. The model is applied to a case study in which the predicted time and cost of tunnel construction using the GPR model are compared with the actual construction time and cost for model validation and reducing the uncertainty for the future projects. In addition, the results obtained from the GPR have been compared with to other models of artificial neural network (ANN) and support vector regression (SVR) that the GPR model provides more accurate results.

물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델 (Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis)

  • 지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

공동주택 프로젝트의 초기 공사비 예측정확도 향상에 관한 연구 (Improving the Accuracy of Early Stage Cost Estimation in Apartment Construction Project)

  • 임소연;여상구;고성석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.143-147
    • /
    • 2010
  • Due to the diversification and complication of construction projects, controlling risks from the early design-planning phase gives huge impact on success of the construction project. As a part of managing uncertainties it is also important to estimate the project cost several times. Especially, estimating project cost in the early stage gives effects on making a budget for projects. This study estimated the apartment project cost using case-based reasoning(CBR), which is the process of solving new problems based on the past problems. For this, we deduced the apartment cost influence factors which can be gathered in the early stage of project. Based on the factors we established the database for apartment project and calculated the attribute value, attribute similarity and case similarity. Although we retrieve the most similar case from the database, it is very hard to utilize it directly due to the uniqueness of each project. So, Genetic Algorithm(GA) was applied in revising the cost of the retrieved-case. Therefore, the accuracy of the prediction was improved by GA optimization.

  • PDF

대·소규모 토목공사의 실적공사비 비교 분석 (Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works)

  • 홍성호;신주열;김창학;이동욱
    • 대한토목학회논문집
    • /
    • 제33권4호
    • /
    • pp.1707-1718
    • /
    • 2013
  • 실적공사비 제도는 2004년부터 도입된 제도로서, 과거의 유사 공사의 계약단가를 토대로 공종별 단가를 파악하여 예정가격을 결정하는 방식이다. 이러한 실적공사비 단가는 매년 2회 한국건설기술연구원에서 발표하고 있다. 소규모 공사의 공사비 단가는 작업단위당 생산비용 증가, 장비 및 노무비 등 상승으로 인해 대규모 공사보다 높을 수밖에 없는 것이 건설공사의 특성이다. 그러나 실적공사비 단가가 공사의 규모와 무관하게 일률적으로 적용되고 있어 문제점으로 대두되고 있다. 본 연구에서는 이러한 실적공사비 제도의 문제점을 파악하기 위해서 대 소규모 토목공사의 실적공사비를 비교 분석하였으며, 소규모 토목공사의 실적공사비가 대규모 토목공사에 비해 21.8% 높은 결과가 도출되었다.

비목별 주요 항목을 활용한 도로 공사비지수 산정에 관한 연구 (The Research on Development of Road Cost Index Using Each Representative Item of Expenditure)

  • 천진용;우성권
    • 대한토목학회논문집
    • /
    • 제26권1D호
    • /
    • pp.105-113
    • /
    • 2006
  • 건설공사비지수는 과거의 공사데이터를 바탕으로 신규공사의 공사비를 추정할 수 있을 뿐 아니라, 공사 수행 중 원가를 구성하는 비목의 가격이 상승 또는 하락할 경우 계약금액을 조정하는데도 활용된다. 국내의 경우 건설공사비지수는 주로 계약금액 조정을 위해 활용되고 있지만 계약금액 조정에 활용되는 지수의 경우 비목별 지수 산정시 건설원가의 변동을 적절하게 반영하지 못하는 문제점이 지적되어 왔다. 본 연구에서는 기존의 공사비지수 산정에 관한 선행 연구들을 비교 분석하고, 도로 건설공사 내역서의 분석을 통해 노무, 재료, 기계경비를 구성하는 주요 항목들을 중심으로 도로 건설공사비지수를 산정하는 방법론을 제안한다. 본 연구에서 제안하는 각 비목별 주요 항목의 투입 구성비를 활용한 지수산정 방법론의 적용을 통해서 건설원가의 변동을 적절히 반영하지 못한다는 기존의 문제점이 보완될 수 있을 것으로 기대된다.