• Title/Summary/Keyword: Parallel-Machine Scheduling

Search Result 89, Processing Time 0.021 seconds

A Heuristic for parallel Machine Scheduling Depending on Job Characteristics (작업의 특성에 종속되는 병렬기계의 일정계획을 위한 발견적 기법)

  • 이동현;이경근;김재균;박창권;장길상
    • Korean Management Science Review
    • /
    • v.17 no.1
    • /
    • pp.41-54
    • /
    • 2000
  • in the real world situations that some jobs need be processed only on certain limited machines frequently occur due to the capacity restrictions of machines such as tools fixtures or material handling equipment. In this paper we consider n-job non-preemptive and m parallel machines scheduling problem having two machines group. The objective function is to minimize the sum of earliness and tardiness with different release times and due dates. The problem is formulated as a mixed integer programming problem. The problem is proved to be Np-complete. Thus a heuristic is developed to solve this problem. To illustrate its suitability and efficiency a proposed heuristic is compared with a genetic algorithm and tabu search for a large number of randomly generated test problems in ship engine assembly shop. Through the experimental results it is showed that the proposed algorithm yields good solutions efficiently.

  • PDF

A Lagrangian Relaxation Method for Parallel Machine Scheduling with Resource Constraints

  • Kim, Dae-Cheol
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.65-75
    • /
    • 1998
  • This research considers the problem of scheduling jobs on parallel machines with non-common due dates and additional resource constraints. The objective is to minimize the total absolute deviation of job completion times about the due dates. Job processing times are assumed to be the same. This problem is motivated by restrictions that occur in the handling and processing of jobs in certain phases of semiconductor manufacturing and other production systems. We examine two problems. For the first of these, the number of different types of additional: resources and resource requirements per job are arbitrary. The problem is formulated as a zero-one integer linear programming and the Lagrangian relaxation approach is used. For the second case, there exists one single type of additional resource and the resource requirements per job are zero or one. We show how to formulate the problem as an assignment problem.

  • PDF

Scheduling Heuristics for a Two-Stage Hybrid Flowshop with Nonidentical Parallel Machines (이종 병렬기계를 가진 2단계 혼합흐름생산시스템의 일정계획)

  • Lee, Ji-Soo;Park, Soon-Hyuk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.25 no.2
    • /
    • pp.254-265
    • /
    • 1999
  • We consider two stage hybrid flowshop scheduling problem when there are two non-identical parallel machines at the first stage, and only one machine at the second stage. Several well-known sequence-first allocate-second heuristics are considered first. We then propose an allocate-first sequence-second heuristic to find minimum makespan schedule. The effectiveness of the proposed heuristic algorithm in finding a minimum makespan schedule is empirically evaluated by comparing with easily computable lower bound. The proposed heuristic algorithm as well as the existing heuristics are evaluated by simulation in four cases which have different processing time distribution, and it is found that the proposed algorithm is more effective in every case.

  • PDF

A Parallel Processors Scheduling Problems with a Common Due Date (공통납기를 고려한 병렬기계 일정계획)

  • Lee, Jeong-Hwan;No, In-Gyu
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.2
    • /
    • pp.81-92
    • /
    • 1990
  • This paper considers a scheduling of a set of jobs on single and multiple processors, when all jobs have a common due date and earliness and lateness are penalized at different cost rates. The objective is to determine the optimal value of a common due date and an optimal scheduling to minimize a total penalty function. It is also shown that a schedule having minimum weighted completion time variances must be V-shaped. For identical processors, a polynomial scheduling algorithm with the secondary objectives of minimizing makespan and machine occupancy is developed and a numerical example is presented.

  • PDF

Customer Order Scheduling Problems on Parallel Machines with Job Capacity Restriction

  • Yang, Jaehwan
    • Management Science and Financial Engineering
    • /
    • v.9 no.2
    • /
    • pp.47-68
    • /
    • 2003
  • We consider the customer order scheduling problem with job capacity restriction where the number of jobs in the shop at the same time is fixed. In the customer order scheduling problem, each job is part of some batch (customer order) and the composition of the jobs (product) in the batch is pre-specified. The objective function is associated with the completion time of the batches instead of the completion time of the jobs. We first summarize the known results for the general customer order scheduling problems. Then, we establish some new properties for the problems with job capacity restriction. For the case of unit processing time with the objective of minimizing makespan, we develop a polynomial-time optimal procedure for the two machine case. For the same problem with a variation of no batch alternation, we also develop a polynomial-time optimal procedure. Then, we show that the problems with the objectives of minimizing makespan and minimizing average batch completion time become NP-hard when there exist arbitrary number of machines. Finally, We propose optimal solution procedures for some special cases.

Minimizing the Weighted Mean Absolute Deviation of Completion Times about a Common Due Date (공통납기에 대한 완료시간의 W.M.A.D. 최소화에 관한 연구)

  • 오명진;최종덕
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.21
    • /
    • pp.143-151
    • /
    • 1990
  • This paper studies a single machine scheduling problem in which all jobs have the common due date and penalties are assessed for jobs at different rates. The scheduling objective is to minimize the weighted mean absolute deviations(WMAD). This problem may provide greater flexibility in achieving scheduling objectives than the mean absolute deviation (MAD) problem. We propose three heuristic solution methods based on several dominance conditions. Numerical examples are presented. This article extends the results to the problem to the problem of scheduling n-jobs on m-parallel identical processors in order to minimize the weighted mean absolute deviation.

  • PDF

A Methodology for Task placement and Scheduling Based on Virtual Machines

  • Chen, Xiaojun;Zhang, Jing;Li, Junhuai
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.5 no.9
    • /
    • pp.1544-1572
    • /
    • 2011
  • Task placement and scheduling are traditionally studied in following aspects: resource utilization, application throughput, application execution latency and starvation, and recently, the studies are more on application scalability and application performance. A methodology for task placement and scheduling centered on tasks based on virtual machines is studied in this paper to improve the performances of systems and dynamic adaptability in applications development and deployment oriented parallel computing. For parallel applications with no real-time constraints, we describe a thought of feature model and make a formal description for four layers of task placement and scheduling. To place the tasks to different layers of virtual computing systems, we take the performances of four layers as the goal function in the model of task placement and scheduling. Furthermore, we take the personal preference, the application scalability for a designer in his (her) development and deployment, as the constraint of this model. The workflow of task placement and scheduling based on virtual machines has been discussed. Then, an algorithm TPVM is designed to work out the optimal scheme of the model, and an algorithm TEVM completes the execution of tasks in four layers. The experiments have been performed to validate the effectiveness of time estimated method and the feasibility and rationality of algorithms. It is seen from the experiments that our algorithms are better than other four algorithms in performance. The results show that the methodology presented in this paper has guiding significance to improve the efficiency of virtual computing systems.

Surrogate Objective based Search Heuristics to Minimize the Number of Tardy Jobs for Multi-Stage Hybrid Flow Shop Scheduling (다 단계 혼합흐름공정 일정계획에서 납기지연 작업 수의 최소화를 위한 대체 목적함수 기반 탐색기법)

  • Choi, Hyun-Seon;Kim, Hyung-Won;Lee, Dong-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.4
    • /
    • pp.257-265
    • /
    • 2009
  • This paper considers the hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. In hybrid flow shops, each job is processed through multiple production stages in series, each of which has multiple identical parallel machines. The problem is to determine the allocation of jobs to the parallel machines at each stage as well as the sequence of the jobs assigned to each machine. Due to the complexity of the problem, we suggest search heuristics, tabu search and simulated annealing algorithms with a new method to generate neighborhood solutions. In particular, to evaluate and select neighborhood solutions, three surrogate objectives are additionally suggested because not much difference in the number of tardy jobs can be found among the neighborhoods. To test the performances of the surrogate objective based search heuristics, computational experiments were performed on a number of test instances and the results show that the surrogate objective based search heuristics were better than the original ones. Also, they gave the optimal solutions for most small-size test instances.

Multi-factor Evolution for Large-scale Multi-objective Cloud Task Scheduling

  • Tianhao Zhao;Linjie Wu;Di Wu;Jianwei Li;Zhihua Cui
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.4
    • /
    • pp.1100-1122
    • /
    • 2023
  • Scheduling user-submitted cloud tasks to the appropriate virtual machine (VM) in cloud computing is critical for cloud providers. However, as the demand for cloud resources from user tasks continues to grow, current evolutionary algorithms (EAs) cannot satisfy the optimal solution of large-scale cloud task scheduling problems. In this paper, we first construct a large- scale multi-objective cloud task problem considering the time and cost functions. Second, a multi-objective optimization algorithm based on multi-factor optimization (MFO) is proposed to solve the established problem. This algorithm solves by decomposing the large-scale optimization problem into multiple optimization subproblems. This reduces the computational burden of the algorithm. Later, the introduction of the MFO strategy provides the algorithm with a parallel evolutionary paradigm for multiple subpopulations of implicit knowledge transfer. Finally, simulation experiments and comparisons are performed on a large-scale task scheduling test set on the CloudSim platform. Experimental results show that our algorithm can obtain the best scheduling solution while maintaining good results of the objective function compared with other optimization algorithms.

Design and Implementation of the DEVS-based Distributed Simulation Environment: D-DEVSim++ (DEVS에 기반한 분산 시뮬레이션 환경 $D-DEVSim^{++}$의 설계 및 구현)

  • 김기형
    • Journal of the Korea Society for Simulation
    • /
    • v.5 no.2
    • /
    • pp.41-58
    • /
    • 1996
  • The Discrete Event Systems Specification(DEVS) formalism specifies a discrete event system in a hierarchical, modular form. This paper presents a distributed simulation environment D-DEVSim++ for models specified by the DEVS formalism. D-DEVSim++ employs a new simulation scheme which is a hybrid algorithm of the hierarchical simulation and Time Warp mechanisms. The scheme can utilize both the hierarchical scheduling parallelism and the inherent parallelism of DEVS models. This hierarchical scheduling parallelism is investigated through analysis. Performance of the proposed methodology is evaluated through benchmark simulation on a 5-dimensional hypercube parallel machine. The performance results indicate that the methodology can achieve significant speedup. Also, it is shown that the analyzed speedup for the hierarchical scheduling time corresponds the experiment.

  • PDF