A Parallel Processors Scheduling Problems with a Common Due Date

공통납기를 고려한 병렬기계 일정계획

  • Published : 1990.11.01

Abstract

This paper considers a scheduling of a set of jobs on single and multiple processors, when all jobs have a common due date and earliness and lateness are penalized at different cost rates. The objective is to determine the optimal value of a common due date and an optimal scheduling to minimize a total penalty function. It is also shown that a schedule having minimum weighted completion time variances must be V-shaped. For identical processors, a polynomial scheduling algorithm with the secondary objectives of minimizing makespan and machine occupancy is developed and a numerical example is presented.

Keywords