• Title/Summary/Keyword: PC부재

Search Result 119, Processing Time 0.022 seconds

In-situ Production Effect Analysis of Precast Concrete Elements (PC 부재의 현장 생산효과 분석)

  • Lee, Dong-Joo;Oh, Jin-Hyuck;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.52-53
    • /
    • 2021
  • PC (Precast Concrete) method was preferred for reasons such as shortening of construction period, cost reduction, and quality. However, in the case of factory production, precast concrete has a problem in that transportation conditions in the transportation process, damage during transportation, overhead and profit of the factory are required. If work and PC members are produced on site, transportation and installation costs can be reduced. However, research on field production has not been conducted. Therefore, based on the on-site production plan without PC, the cost and quality of factory production and on-site production are compared and analyzed.

  • PDF

The Priority PC Monitoring System Using Regression Algorithm (회귀알고리즘을 이용한 우선순위 PC모니터링 시스템)

  • Lee, Young-Nam;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.4
    • /
    • pp.173-179
    • /
    • 2012
  • Recently, the requirements of large-dynamic management systems are increasing in multi-PC convergence environment because such system are out. In this research, it has been studied that the regression algorithm was applied instantly for abnormal state and the priority threshold process module was implemented. The system was optimized and become efficiently through the software design and implementation for multi-PC management. As a result, it has been possible for least person and system to manage a lot of requirements.

Time Reduction Effect Analysis of SMART Frame for Long Span and Heavy Loaded Logistics Buildings (SMART 프레임의 공기단축 효과 분석 - 대형 물류창고 사례 -)

  • Kim, Doyeong;Ji, Woomin;Lim, Jeeyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.519-530
    • /
    • 2022
  • As online commerce increases, the construction of large logistics buildings worldwide is exploding. Most of these buildings have the characteristics of long span and heavy loaded and use precast concrete components, a pin joint structure, for rapid construction. However, due to construction safety and structural stability requirements, the pin joint structure has many limitations in terms of the erection of the PC member, which increases the time and cost. A structural frame connected with steel joints between precast concrete components, called a SMART frame, has been developed, which addresses these constraints and risks. However, the effect of the appllication of a SMART frame on the time aspect has not been analysed. The study is a time reduction effect analysis of a SMART frame for long span and heavy loaded logistics buildings. For this study, the authors select a case site erected using existing PC components, and compare the time reduction with the SMART frame erection simulations. Through this analysis, it was found that a time reduciton about 4 months, approximately 48% of the conventional PC installation period could be achieved. If the SMART frame is applied when carrying out future large-scale logistics building projects, it can be expected to have the effect of significantly shortening the construction period compared to the conventional method.

Development of Multi-Axis Gantry Type Welding Robot System (다축제어 갠트리형 용접로봇 시스템 개발에 대한 연구)

  • 정창욱;이지형;박종련;윤석필;김형식
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.248-248
    • /
    • 2000
  • 본 연구는 조선 소조립, 판넬조립 등의 공정에서 발생되는 필렛 용접 부위의 용접 자동화를 위한 로봇 시스템 개발에 관한 연구이다. 조선등의 중공업 분야에서는 작업이 중량이고 대형임에 따라 로봇이 부재의 특정위치로 이동하여 작업해야 한다. 또한 작업대상의 형상이나 치수가 매번 변경됨에 따라 이에 능동적으로 대처할 수 있어야 한다. 본 연구에서는 두 대의 로봇(2대x6축=12축)이 다축 문형 캔트리(4축)에 장착된 조선용 필렛용접 로봇 시스템(16축)을 개발하였다. 필렛용접부재를 중심으로 두 대의 로봇이 양쪽을 동시에 용접하는 방식으로 고속회전토치를 적용하여 위빙동작없이 원하는 용접각장(Leg Length)을 생성할 수 있다. 캔트리 시스템은 PC 기반의 별도 제어기로 구성하여 두 대의 로봇 제어기와 신호 입출력에 의해 동시동작이 가능하도록 하였으며, 작업장에 놓인 부재의 위치오차를 보장하기 위하여 시각센서를 적용하였다. 용접시작점의 위치보정을 위한 시작점 검출을 위해접촉센서(Touch Sensor)를 적용하였으며, 용접선 추적을 위해서 아크센서(Arc Sensor)를 적용하였다. 본 시스템 2000년 1월 제작 설치가 완료되어 현재 성능 테스트가 완료된 상태로 향후 생산현장에 적용될 계획이다.

  • PDF

Tunnel pillar reinforcement effect using PC stranded wire and groutings (PC강연선 및 그라우팅을 이용한 터널 필라부 보강효과)

  • Yeon-Deok Kim;Soo-Jin Lee;Pyung-Woo Lee;Hong-Su Yun;Sang-Hwan Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.43-63
    • /
    • 2023
  • With the concentration of the population in the city center and the saturation of the structures on the ground, the development of the underground structures becomes important and the construction of an adjoining tunnel that can reduce the overall problems is respected. In addition, it is necessary to apply the reinforcement construction method for the pillar part of the adjacent tunnel that can secure stability, economy and workability of the site. In this study, the tunnel pillar reinforcement method using prestress and grouting was reviewed. There are various reinforcement methods that can compensate for the problems of the side tunnel, but as the tunnel pillar construction method using prestress and grouting is judged to be excellent in field applicability, stability and economic feasibility, theoretical and numerical analysis of the actual behavior mechanism are conducted. Numerical analysis is divided into PC stranded wire + steel pipe reinforcement grouting + prestress (Case 1), pillar part tie bolt reinforcement (Case 2), pillar part non-reinforcement (Case 3) under the same ground conditions, and the maximum value of the celling displacement, internal displacement, and member force, the stability was confirmed. Through numerical analysis, it was confirmed that Case 1 which reinforced the PC stranded wire, was the best construction method and if it is verified and supplemented through field experiments later, it will be possible to derive superior results in terms of displacement control and member force than the currently applied reinforcement method was judged.

An Experimental Study on the Axial Strength of Centrifugall Formed Shell PC Columns (원심성형 중공PC기둥의 압축 실험)

  • Park, Jin-Young;Yang, Won-Jik;Yi, Waon-Ho;Oh, Sang-Hoon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.37-40
    • /
    • 2008
  • Recently, Construction Business, is changing very quickly, exceedingly needs to slim down the construction expensive by reducing material costs and the term of works. The term of formwork takes 25% of the term of works and costs 15% to 20% of the cost of construction. Hereupon, the purpose of this study is to investigate the Axial Strength of Centrifugall Formed Shell PC Columns that can reduce the term of formwork, the costs of material, the difficulty of throwing away the waste. Shell PC Column is loaded stirrups and manufactured at factory, so it has good points like construction's quality control and part's precision. However, it needs to be tested for checking bonded ability because it is set up at core and coverd with concrete. therefore this study is necessary three type of columns, which are a RC column, different type of two compressive strength core concrete columns and a Shell PC Column. By three columns, this study compare with and analysis three columns's bonded and Compressive Behavior abilities.

  • PDF

Experimental Study on the Development of Void Precast Concrete Slab using Rubber Tube Mold for Inner Core (고무튜브 몰드 프리캐스트 콘크리트 유공 슬래브 개발에 관한 실험적 연구)

  • Bae, Kyu-Woong;Hong, Sung-Yub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.293-303
    • /
    • 2021
  • The void PC slab has a structurally reasonable cross-section by forming the hollow section of the neutral axis that is unnecessary for bending behavior. Domestic PC factories have introduced automation equipment to produce hollow PC slabs, and are achieving hollow sections through inserts. However, since the excessive initial investment cost of the PC factory is the main factor in the increase in production cost, other alternatives are needed. Therefore, in this study, when producing hollow PC slab members, by using a rubber tube as a formwork to form an internal hollow space, it is intended to contribute to securing productivity through molding various hollow shapes, making it larger, lightweight, and enabling rapid production. To implement a hollow PC slab using a rubber tube mold, the shape of a hollow cross-section in which the tube is combined was implemented by considering the shape of the rubber tube first. In addition, to secure the concrete quality of the hollow part, the finish properties of the rubber tube mold and concrete were evaluated, and the hollow PC production process was established.

Performance Analysis of SMART Frame Applied to RC Column-Beam Structures (RC 라멘조에 SMART Frame 적용 시 효용성 분석)

  • Cho, Wonhyun;Lim, Chaeyeon;Jang, Duk Bea;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.168-169
    • /
    • 2015
  • SMART Frame is a composite precast concrete structure system to deliver the advantages of both steel frame and reinforced concrete. Many studies have established to date that SMART Frame is more advantageous than conventional frame-type structure in terms of structural stability, constructability, economic viability as well as reduction of construction schedule. However, such studies have focused primarily on wall-type or flat slab-type apartment housing structures, failing to include Rahmen structures in their scope. Accordingly, this study aims to analyze the benefits of potential application of SMART Frame to RC Rahmen structures. As the structural stability and constructability of SMART Frame is already proven, this study reviews its benefits from the perspective of cost reduction. Conclusion of this study will be used subsequently in predicting the benefits of SMART Frame when it is adapted to RC Rahmen structures.

  • PDF

An Experimental Study about Tile Exfoliation Properties and Member Strain Using The Tile Before-fixing Method (타일 선붙임 부재의 변형율과 타일 박락 특성에 관한 실험적 연구)

  • Kim Woo-Sang;Park Hee-Gon;Park Byung-Geun;Jung Keun-Ho;Lee Young-Do;Jung Sang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.27-30
    • /
    • 2004
  • The objectives of the present study is to solve problems in PC tile before-fixing method using ordinary concrete by adopting the liquefaction method in manufacturing PC to which the tile before-fixing method is applied, and to provide basic information for the practical use of the PC tile before-fixing method, which uses high workable concrete, through manufacturing a complex body based on the optimal mix proportion,

  • PDF

Connection Method of Composite Precast Concrete Columns Using Thread Rebar (나사형 철근을 사용한 합성 PC기둥의 접합방법)

  • Kim, Tae-Koo;Lee, Sung-Ho;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.14-15
    • /
    • 2013
  • Green Frame is precast concrete column-beam structure. There are three types on column connection. The coupler type which is one of the three, need to be improved because of unstability caused by pre-installation of column before casting the slab, and quality deterioration caused by lack of workspace. Therefore, in this study, new coupler connection type with thread rebar is suggested. The result of this study shall be used for the efficiency analysis of the new coupler connection.

  • PDF