An Experimental Research on the Shear Friction Behavior of Beam-Column Joints of Partial Precast Concrete Structures (부분PC 보-기둥 접합부의 전단 마찰 거동에 관한 실험 연구)

  • Kim, Sang-Yeon
    • Land and Housing Review
    • /
    • v.5 no.2
    • /
    • pp.91-97
    • /
    • 2014
  • An experimental program was initiated to investigate the structural capacity of PC (Precast Concrete) beam-column joints used for the underground parking structure. Static testing of 4 typical PC beam-column joints specimens was conducted. Specimens were designed to span a range of parameters typically encountered for such members, based on findings from the survey of existing PC joint details used in the construction fields in Korea. The specimens were four by their joint types and testing parameters. The specific structural behavior germane to each specimen, and general observations on overall member behavior as a function of the considered parameters, are reported. From the results of tests on four PC joints specimens, the beam-column joints of PC structure used for the underground parking building was found to have similar structural capacities when comparing to the cast-in-place concrete system.

Tunneling in Severe Groundwater Inflow Condition (지하수 과다유입 조건하에서의 터널굴착)

  • Lee, Young-Nam;Kim, Dae-Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.2
    • /
    • pp.67-76
    • /
    • 2006
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3 m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3km upstream of the powerhouse and headrace tunnel of 20km in length and penstock of 440m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflowraised the water level inside tunnel to 70cm, 17% of tunnel diameter (3.9m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made forthe excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

Establishing Automated Mapping/Facilities Management System Using PC-CAD (PC용 CAD를 이용한 단지기반시설 정보화)

  • 이규석;안승만;탁형렬
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.15 no.2
    • /
    • pp.141-148
    • /
    • 1997
  • Continuous development of Personal Computer(PC) combined with the decrease of price and the expansion of operating system in PC like Windows 95, and Windows N/T makes it possible for the user to consider PC-bas-ed Automated Happing/Facilities Management (AM/FM) system. Therefore, the purpose of this study is to establish a PC-based data automation system of pipe infrastructures-water, sewer, and drainage-and road in Korea Land Corporation. In order to achieve this goal, relevant literature survey was done first. Secondly, the study site was determined by discussion with Korea Land Institute. Thirdly, PC-based CAD software for AM/FM in the world market were surveyed, and AutoCAD Map was selected because KLC had been using hundreds of AutoCAD copies already. After that user needs assessment was done to visit on-site office, local branch office, and the corresponding city office for the system design and database design. After the graphic data were digitized and the attribute data were entered into the batabase, the data automation system was established, and tested for application. Finally, the guidelines and problems for PC-based data automation in AM/FM was discussed.

  • PDF

A Development of a Web Based Supporting System for Writing Construction Project Specification (Web기반 공사시방서 작성 시스템 개발 방안)

  • Kim Kyoon-Tai;Kim Tae-Song;Koo Jai-Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.501-506
    • /
    • 2001
  • The Korean government established a domestic specification system, and regulated that owner should produced construction project specifications, instead of special provisions, in design phase, January 1998. But in Korea the ability of construction engineers for construction project specification are insufficient. So the government had built up a database of standard specifications and developed a supporting system for writing construction project specification(SPECMAKE) in 1999. However, it is a PC base stand-alone system, so it is not convenient to update the database. In order to overcome these limitations, the purpose of this paper builds up a database of construction criteria and develops a automatic writing system for construction project specification on web base. The database contains standard specifications, design and construction guidelines related with construction business. And this paper describes the frameworks, the components, and the functions of the specifications writing system for the construction projects.

  • PDF

The Economic Analysis of Underground Parking Lot Frames adopting 8-Bay Parking Modules (8-Bay 주차모듈을 적용한 아파트 지하주차장 구조의 경제성 분석)

  • Yu, Yongsin;Yoon, Bohyung;Kim, Minsu;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.52-61
    • /
    • 2019
  • On 30 June, 2017, the Ministry of Land, Infrastructure, and Transport announced the minimum size of parking section will be expanded in parking lots. The expansion of parking section could lead to increase in apartment prices because of increase in total area of the parking lots. It is necessary to adjust the column spacing and number in the parking lots and to apply the 8-Bay long-span parking module with good parking efficiency. According to the study, the construction cost of the 6-Bay module and 8-Bay module was almost the same. But The 8-Bay module was more economical than the 6-Bay module because of the reduction in total area of 8-Bay multi-moduel. The Result of construction cost of 8-Bay modules, Removal Deck-plate RC system was most economical. While the construction cost of PC system was higher due to increase in volume of the member, it would ensure sufficient economy by reducing the girder height to apply a pre-stress method. Also, the construction cost of hollow slab system was the highest. But it could be used as the underground parking lots for apartment, because it had the lowest cost per square meter. This Study has a academic significance by proving the applicability of the 8-Bay Module to underground parking lot of apartment. And it is expected that this study will be used as basic data to derive optimal construction method that applies 8-Bay Module.

Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning (IPA를 통한 PC부재 할당 및 적재 계획 시 고려사항 분석)

  • Jang, JunYoung;Cho, Kyeong Woon;Koo, Choongwan;Lee, Chansik;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.53-62
    • /
    • 2021
  • PC component allocation and loading plan can contribute to reductions in carbon dioxide emission and energy use of vehicles and total project costs with increased utilization of vehicle loading space. The study derived 18 considerations that PC construction plant managers and site managers take into account when they plan allocation and loading of PC components. Then, IPA (Importance and Performance Analysis) was performed to assess importance and performance of the 18 considerations. Results show that in the PC component allocation planning, considerations regarding the number of vehicles and existence of yard for storing PC components have not been taken into account well by the managers. In the PC component loading planning, PC component loading direction has not been reflected well by the managers although it is considered important by them. Recently, ill-planning issues of PC component transportation, such as inefficient use of vehicle space and loading with low stability, are frequent due to various types of PC components produced. In this context, if the results of this study are reflected in the development of component allocation and loading planning, vehicle management of PC projects would be more efficient, thereby leading to economic project management.

특허 News

  • (사)한국여성발명협회
    • The Inventors News
    • /
    • no.31
    • /
    • pp.2-2
    • /
    • 2005
  • 지난해 특허출원 사상 최대치 기록하다 - 유명 PC게임 `디아블로` 상표등록 무효 - 가천의대$\cdot$하버드대 인체 영상 특허 공유 - `우리은행` 상표권 등록 무효 소송 추진 - 토지공사 `KoLand` 상표 무단 사용 1억여 원 배상 판결 - 강진 `옴천 토하 젓` 상표 주인은 누구?

  • PDF

Application of MRS(Multi Ribbed Slab) System with 4Story-1Piece Columns (4층(層)1절(節) 기둥을 이용한 MRS(Multi Ribbed Slab)공법 적용)

  • Kim, Jung-Taek;Im, Ju-Heuk;Jeon, Byong-Kap;Kim, Yong-Nam
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.85-88
    • /
    • 2011
  • MRS(Multi Ribbed Slab) method was developed to accomodate Korean construction practice and needs of Korean customer. By means of 4story-1piece column and MRS method, we achieved construction cost cut down and reduction of construction period.

  • PDF

Present Status and Prospect of LNG Strorage Tank (액화천연가스 저장탱크의 현황 및 전망)

  • 홍성호
    • Journal of Welding and Joining
    • /
    • v.13 no.3
    • /
    • pp.1-7
    • /
    • 1995
  • 1992년 9월 현재 전 세계적으로 운전 중(건설포함)인 액화 및 인수기지의 LNG 저장탱크는 지상식-이중벽 금속 탱크, 지상식-맴브레인 PC 탱크, 지상식-자립식 내부탱크/PC 외부탱크, 피드식-RC(Reinforced Concrete) 보강둑 탱크, 피트식-이중벽 금속탱크, 피트식-자립식 내부탱크/PC 외부탱크 및 지하식 탱크의 7가지 유형으로 나 타낼 수 있다. 또한 액화천연가스를 저장하는 내부탱크 소재에 따라 9%Ni강 및 MEMBRANE(SUS304) 형식으로 대별할 수 있다. MEMBRANE 저장탱크 형식의 핵심기술인 MEMBRANE은 -162.deg.C의 LNG에 의한 열수축팽창에 견딜 수 있도록 스테인레스강판 (SUS304)을 사용하여 기하학적으로 특이한 주름진 형상을 갖도록 설계되었으며 주름 형상에 따라 프랑스의 테크니가즈(Technigaz), 일본의 가와사끼(Kawasaki). 미쓰비시 (Mitsubishi), 이시가와지마하리마(Ishikawajima-Harima)사의 멤브레인과 세계에서 3번째로 한국가스공사 연구개발원이 개발한 링디식 멤브레인으로 구별할 수 있다. 본 해설에서는 국내의 전국 천연가스 공급사업계획 및 건설현황을 검토하고 최근 전 세계적으로 널리 사용되고 있는 액화천연가스 저장탱크의 종류를 용량별, 년도별로 분석하여 전세계의 액화천연가스 저장탱크에 관해 소개 하겠다.

  • PDF

Study on Applicability of NATM Composite Lining Method (NATM Composite 라이닝 공법의 적용성 연구)

  • Ma, Sang-Joon;Kang, Eun-Gu;Kim, Dong-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.12
    • /
    • pp.69-84
    • /
    • 2011
  • This paper presents the applicability of NATM Composite Lining method in domestic tunnel construction sites. Firstly, in order to produce high quality PC Panel, optimal steam curing condition is reviewed. And in preparation for fire inside the tunnel, the fire-resistance test of PC Panel is carried out. The constructability of NATM Composite Lining method and the drainage ability of light-weight foamed mortar is also evaluated through field construction test. And PC Panel combination program is developed to calculate the quantity of PC Panel efficiently. Besides, economic evaluation for NATM Composite Lining method is conducted. From this research, it is clearly found that NATM Composite Lining method is applicable to domestic tunnel construction site.