• Title/Summary/Keyword: Owner's Requirements

Search Result 54, Processing Time 0.028 seconds

Method to Use the Augmented Reality for Construction Planning and Management

  • Nam, Keong-Woo;Kang, Chulung;Jang, Myunghoun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1067-1074
    • /
    • 2022
  • An architect creates his/her design to meet owner's requirements. Floor plans, perspective drawings, and scale models are used in order for the owner to choose the design. The tools are a little helpful for communication between the architect and the owner in case the owner does not know architecture. The scale models are good, but it is hard to make scale models while design is in progress. 3D CAD is a good tool for communication, but it is time-consuming and requires high-performance computer hardware. Augmented reality is able to show 3D virtual models that are updated by the architect with smart devices such as a smart phone and a tablet PC. The owner frequently reviews the updated design anytime anywhere. This study proposes a method to use augmented reality for architectural design and construction management. The method supports the communication between the owner, the architect and the contractor to review updated designs, and to complete the building project. 3D models expressed in augmented reality are created using SketchUp with 2D drawings for building construction. An Android application implementing augmented reality is developed by Qualcomm Vuforia and Unity on smart devices. Drawings as markers and 3D models are connected in Unity. And functions that temporarily hide unnecessary parts can be implemented in C# programming language. If an owner, an architect, or a contractor looks at a smart phone on a 2D drawing, he/she can identify building elements such as 3D buildings or columns on a screen. This can help communication between them.

  • PDF

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Bayesian Theorem-based Prediction of Success in Building Commissioning

  • Park, Borinara
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.523-526
    • /
    • 2015
  • In recent years, building commissioning has often been part of a standard delivery practice in construction, particularly in the high-performance green building market, to ensure the building is designed and constructed per owner's requirements. Commissioning, therefore, intends to provide quality assurance that buildings perform as intended by the design and often helps achieve energy savings. Commissioning, however, is not as widely adopted as its potential benefits are perceived. Owners are still skeptical of the cost-effectiveness claims by energy management and commissioning professionals. One of the issues in the current commissioning practice is that not every project is guaranteed to benefit from the commissioning services. This, coupled with its added cost, the commissioning service is not acquired with great acceptance and confidence by building owners. To overcome this issue, this paper presents a unique methodology to enhance owner's predicting capability of the degree of success of commissioning service using the Bayesian theorem. The paper analyzes a situation where a future building owner wants to use a pre-commissioning in an attempt to refine the success rate of the future commissioned building performance. The author proposes the Bayesian theorem based framework to improve the current commissioning practice where building owners are not given accurate information how much successful their projects are going to be in terms of energy savings from the commissioning service. What should be provided to the building owners who consider their buildings to be commissioned is that they need some indicators how likely their projects benefit from the commissioning process. Based on this, the owners can make better informed decisions whether or not they acquire a commissioning service.

  • PDF

A Study on the Direction of the Warranty Contract in Constructions (건설공사 성능계약제도 도입방향에 관한 연구)

  • Kim, Hyun;Park, Sung-Yong;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.153-157
    • /
    • 2008
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. However, the interior of a country encounter another problem result from defects liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

Multi-dimensional Quality Model for Value Engineering in Planning Phase of Public Construction Program (공공 건설 프로그램의 기획단계 VE를 위한 다차원 품질모델)

  • Hyun, Chang-Taek;Kim, Jong-Hyeob;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.61-69
    • /
    • 2013
  • In the mixed-use development program, several conflicts occur due to the characteristics of construction program, such as large-scale, variety of stakeholders, long periods of time, etc. In particular, since the characteristics of the construction program having various complex projects lead to different requirements depending on stakeholders, it is crucial to plan the appropriate type and size of facilities. Therefore, it is necessary to derive solutions suitable for the needs of owner by conducting VE in the planning phase. In this study, a multi-dimensional quality model is developed to present proper facilities necessary for the construction program by clearly identifying the owner's requirements in performing VE in the planning phase. Through the development of the multi-dimensional quality model, the characteristics distribution of 15 major facilities by 12 performance indicators for mixed-use development programs is presented. The deduction method of appropriate facilities based on the requirements of owner and the multi-dimensional synthesis method among the performance indicators are also suggested. This study is significant as a basic research for the application of VE in the planning phase of construction program. It is expected that the multi-dimensional quality model proposed in this study could facilitate presentation and review of appropriate facilities based on the analysis of requirements of various stakeholders in the early stage of the construction program.

A Study on Developing Systems for Managing Information on Owner's Requirements in the Design Phase (설계단계에서의 발주자 요구사항 관리를 위한 정보관리 시스템 개발에 관한 연구)

  • Yoo, Seung-Yeun;Lee, June-Seong;Park, Jung-Dae;Jun, Joon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.126-135
    • /
    • 2008
  • The purpose of this study is to develop the efficient information system for managing owner's requirement(O/R) throughout the design phases. In order to derive an improvement, current status of O/R management both in domestic and foreign design company has been analyzed. Through the literature reviews and interviews with experts, the Information on design process and detailed activities were investigated. Based on the basic research, inputs, outputs and participants were defined and information flow diagram was drawn. O/R's were categorized according to comprehensive interviews with specialists, and a prototype system was suggested. Conducting systematized O/R management will improve the confidence of owners' role on design, reduce re-work in design tasks, and finally elevate design quality.

Improving Remodeling Process of Plant Dormitory Based on User Demand (사용자 요구기반 공장기숙사 리모델링 프로세스 개선)

  • Koo, Kyo-Jin;Park, Sang-Hun;Park, Hyung-Jin;Kim, Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.321-322
    • /
    • 2012
  • Since 1980, rapid social and economic development due to increased plant construction has led to a plant dormitory in a short period. In recent years, by the advent of the durability of dormitory remodeling is a critical need. However, user requirements due to the lack of owner's budget do not reflected. As a result, users have complained about the scope of construction, and construction stakeholder in accordance with the budget efficiency of the complaints have decreased. In this study the remodeling requirements in the planning stages is proposed for the remodeling process. In addition work type and element can select a range of construction worksheet are proposal.

  • PDF

Evaluation of Handover Requirements of Construction Information for Efficient Facility Management (효율적인 자산관리를 위한 건설정보 이양요건 평가)

  • Lee, Ikhaeng;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.12-20
    • /
    • 2018
  • As facilities have become larger, more complex, and advanced, the importance of the facility management in the operation phase of the building is increasing. As a result, the scope of the facility management function is expanding, and the requirements of information are ever-increasing. However, inefficient exchange of information occurs due to duplicated tasks and lack of collaboration among the construction life cycle phases, resulting in cost loss. These low interoperability issues can be complemented by construction information management from a life cycle perspective. Efficient construction information management at each life-cycle stage is derived from the owner's will and is materialized through the construction information handover requirements by the owner. The purpose of this study is to develop an evaluation method of construction information handover requirements for facility management. In order to develop the method, facility management types and business functions are also classified and defined in this paper. Using the methodology proposed by this study, a case-study of evaluating the 'takeover items' submitted by contractors was performed for the purpose of research validation. The results of the case-study found that the most effective areas are in the order of 'legal informations', 'drawings', 'guides', etc. This study can be used as a reference data for deriving handover requirements for construction information at the early stage of the project.

A Standard Application Study on Containership Cargo Hatch Cover Plastic Bearing Pad (Container선 Cargo Hatch Cover Plastic Bearing Pad 적용기준 연구)

  • Oh, Hoon-Taek;Ko, Jae-Cheol;Kang, Keun-Hyeog;Ban, Geong-Do
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.1-5
    • /
    • 2009
  • Recent growth in global economic situation has led dramatic increase in new buildings of large containerships. These increased new building orders have brought keen concerns of developing and improving the quality of design and increasing the productivity of the vessel in order to satisfy the ship Owner's various requirements. For the increment of productivity and quality of containership, the plastic type bearing pad of cargo hatch cover has been investigated intensively for years with the supplier of cargo hatch cover. The result of investigation showed that there are numbers of advantages for the Owner and Builder over the existing bronze bearing pads which are better corrosion resistance long life time, low friction coefficient, easy maintenance, easy installation, better production lead time and low maintenance cost.

  • PDF