• Title/Summary/Keyword: Order Scheduling

Search Result 845, Processing Time 0.026 seconds

Optimizing the work process through improvement of reservation system (통합예약 프로그램 개선을 통한 업무 프로세스 최적화)

  • Seo, Eunhee;Chung, Yonghwan;Gu, Bonseung;Park, Jong Bin;Park, Youngjae;Park, Kyung Jin;Kin, Soo Mi;Kwoun, Soon Ahn;Dae, Chang Min;Min, Kwan Hong
    • Quality Improvement in Health Care
    • /
    • v.19 no.1
    • /
    • pp.64-72
    • /
    • 2013
  • Objective: To improve customer satisfaction through accurate information using computerized automation of the test reservation system and by performing all fasting tests on the same day with one fasting. Methods: Quality improvement activities of the test reservation system of Seoul National University Bundang Hospital improves internal and external customer satisfaction at the time of test scheduling by having the reservation system reflect test order and test time automatically and making the system to increase the same day test reservation rate. Results: Test process was smooth due to accurate test reservation and information based on test priority due to the introduction of the computerized test reservation system. Internal and external customer satisfaction improved due to the marked reduction in time required for making a reservation thanks to the improvement of work process. Conclusion: Building a computerized test reservation system was an effective measure to improve external and internal customer satisfaction.

  • PDF

Research Trends of Mixed-Criticality System (중요도 혼재 시스템의 연구 동향 분석)

  • Yoon, Moonhyung;Park, Junho;Kim, Yongho;Yi, JeongHoon;Koo, BongJoo
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.125-140
    • /
    • 2018
  • Due to rapid development of semiconductor technology, embedded systems have been developed from single-functional system to the multi-functional system. The system composed of software that has different criticality level is called Mixed-Criticality System. Currently, the project related to the Mixed-Criticality System is accelerating the efforts to seek the development direction and take technical initiatives led by EU and USA where the related industry has developed, but the movement in Korea is yet insignificant. Therefore, it is urgent to perform the research and project of various basic technologies to occupy the initiative for the related technology and market. In this paper, we analyze the trends of major project researches and developments related to the MCS. First, after defining the definition of the MCS and system model, we analyze the underlying technology constituting the MCS. In addition, we analyze the project trends of each country researching MCS and discuss the future research areas. Through this study, it is possible to grasp the research trends of the world in order to establish the research direction of the MCS and to lay the foundation for the integration into the military system.

A Sensing Channel Scheduling Scheme for Improving the Cognition Ability in Cognitive Radio Systems (인지 라디오 시스템에서 주파수 상황인지 능력 향상을 위한 감지 채널 스케줄링 기법)

  • Han, Jeong-Ae;Jeon, Wha-Sook
    • Journal of KIISE:Information Networking
    • /
    • v.35 no.2
    • /
    • pp.130-138
    • /
    • 2008
  • The scheme for recognizing the channel availability is one of the most important research issues in cognitive radio systems utilizing unused frequency bands. In this paper, we propose a novel scheme of selecting sensing channel in order to improve the sensing ability of frequency status in cognitive radio ad hoc networks. To fully exploit the sensing ability of each cognitive radio user, we adopt a master for a cluster which is made of several cognitive radio users. By gathering and analyzing the sensing information from cognitive radio users in the cluster, the cooperative sensing is realized. Since the transmission range of a licensed user is limited, it is possible that a master determines different sensing channels to each cognitive radio users based on their location. By making cognitive radio users sense different channels, the proposed scheme can recognize the state of wireless spectrum fast and precisely. Using the simulation, we compare the performance of the proposed scheme with those of two different compared schemes that one makes cognitive radio users recognize the frequency status based on their own sensing results and the other shares frequency status information but does not utilize the location information of licensed user. Simulation results show that the proposed scheme provides available channels as many as possible while detecting the activation of licensed user immediately.

Priority Selection of Firearms and Ammunition for the Local Reserve Forces using Dynamic Programming (동적계획법에 기반한 지역예비군 총기, 탄약 분배 우선순위 선정에 관한 연구)

  • Cho, Sangjoon;Ma, Jungmok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.67-74
    • /
    • 2020
  • One of the missions of active-duty units in charge of managing reserve forces is providing combat supplies to reserve forces to exercise their combat capabilities quickly when declaring a mobilization order. Rear area active-duty units must support large local reserve forces. On the other hand, military units have difficulties due to a lack of forces and the storage of large quantities of firearms and ammunition. For this reason, local reserve forces should move to an integrated storing place and receive their firearms and ammunition. The existing distribution plan (existing plan) is a first-in-first-out plan that can produce inconsistent distribution orders. The inconsistent distribution orders can increase the complete distribution time, which will affect the combat power of local reserve forces. Therefore, firearms and ammunition should be distributed quickly. Accordingly, this paper proposes the priority selection of firearms and ammunition for local reserve forces with a minimum complete distribution time using Dynamic Programming. To verify the proposed model, the existing plan was compared with the proposed model using real data, and the result showed that the proposed model outperformed the existing plan.

A Study on a Real Time Presentation Method for Playing of a Multimedia mail on Internet (인터넷상의 동영상 메일을 재생하기 위한 실시간 연출 기법 연구)

  • Im, Yeong-Hwan;Lee, Seon-Hye
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.4
    • /
    • pp.877-890
    • /
    • 1999
  • In this paper, a multimedia mail including video, sound, graphic data has been proposed as the next generation mail of the text based mail. In order to develop the multimedia mail, the most outstanding problem is the fact that the multimedia data are too huge to send them to the receiving end directly. The fact of big data may cause many problems in both transferring and storing the data of the multimedia mail. Our main idea is to separate between a control program for the multimedia presentation and multimedia data. Since the size of a control program is as small as a plain text mail, it has no problem to send it attached to the internet mail to the receiver directly. Instead, the big multimedia data themselves may remain on the sender's computer or be sent to a designated server so that the data may be transferred to the receiver only when the receiver activates the play of the multimedia mail. In this scheme, our research focus is paced on the buffer management and the thread scheduling for the real time play of the multimedia mail on internet. Another problem is to provide an easy way of editing a multimedia presentation for an ordinary people having no programming knowledge. For the purposed, VIP(Visual Interface Player) has been used and the results or multimedia mail implemented on LAN has been described.

  • PDF

Design and Implementation of Preemptive EDF Scheduling Algorithm in TinyOS (TinyOS에서의 선점적 EDF 스케줄링 알고리즘 설계 및 구현)

  • Yoo, Jong-Sun;Kim, Byung-Kon;Choi, Byoung-Kyu;Heu, Shin
    • The KIPS Transactions:PartA
    • /
    • v.18A no.6
    • /
    • pp.255-264
    • /
    • 2011
  • A sensor network is a special network that makes physical data sensed by sensor nodes and manages the data. The sensor network is a technology that can apply to many parts of field. It is very important to transmit the data to a user at real-time. The core of the sensor network is a sensor node and small operating system that works in the node. TinyOS developed by UC Berkeley is a sensor network operating system that used many parts of field. It is event-driven and component-based operating system. Basically, it uses non-preemptive scheduler. If an urgent task needs to be executed right away while another task is running, the urgent one must wait until another one is finished. Because of that property, it is hard to guarantee real-time requirement in TinyOS. According to recent study, Priority Level Scheduler, which can let one task preempt another task, was proposed in order to have fast response in TinyOS. It has restrictively 5 priorities, so a higher priority task can preempt a lower priority task. Therefore, this paper suggests Preemptive EDF(Earliest Deadline First) Scheduler that guarantees a real-time requirement and reduces average respond time of user tasks in TinyOS.

A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

A Distributed Altruistic Locking Scheme For Multilevel Secure Database in Wireless Mobile Network Environments (무선 이동 네트워크 환경에서 다단계 보안 데이터베이스를 위한 분산 이타적 잠금 기법)

  • Kim, Hee-Wan;Park, Dong-Soon;Rhee, Hae-Kyung;Kim, Ung-Mo
    • The KIPS Transactions:PartD
    • /
    • v.9D no.2
    • /
    • pp.235-242
    • /
    • 2002
  • We propose an advanced transaction scheduling protocol for concurrency control of multilevel secure databases in wireless mobile network environment. Wireless communication is characterized by frequent spurious disconnections. So short-lived transaction must quickly access database without any delay by long-lived one. We adapted two-phase locking protocol, namely traditional syntax-oriented serializability notions, to multilevel secure databases in wireless mobile network environment. Altruistic locking, as an advanced protocol, has attempted to reduce delay effect associated with lock release moment by use of the idea of donation. An improved form of a1truism has also been deployed for extended a1truistic locking. This is in a way that scope of data to he early released is enlarged to include even data initially not intended to be donated. Our protocol is based on extended altruistic locking, but a new method, namely bi-directional donation locking for multilevel secure databases (MLBiDL), is additionally used in order to satisfy security requirements and concurrency. We showed the Simulation experiments that MLBiDL outperforms the other locking protocols in terms of the degree of throughput and average waiting time.

A Comparative Analysis on Generated Construction Waste Quantities in a Case Study for Deconstruction of an Apartment (공동주택의 분별해체 시험시공을 통한 건설폐기물 발생량 비교 분석)

  • Kim, Hyojin;Kang, Leenseok;Kim, Changhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.63-70
    • /
    • 2014
  • Deconstruction of the building must be applied firstly in order to improve recycling and reuse of construction wastes. In this study have done a case study for deconstruction of an apartment. All construction waste(CW) which will be generated during deconstruction was examined in each part of the building. Because drawing did not exist in most of the old building, we drew up floor plans of buildings. After analyzing these drawings, estimated quantities of CW. It was measured working time of labor and equipments for deconstruction and general demolition on each building of the apartment. In addition, it was proposed in the volume and weight per unit after analyzing detailed measurement of CW which was generated in the process of deconstruction and traditional demolition. It suggested recovery rate at a site, volume and weight conversion factors, and waste basic unit per area that based on the results of comparative analysis on the amount of CW which is calculated from drawing and generated at a site. These factors will be used fundamental materials for estimating quantities and treatment cost of CW, and scheduling of works.

Transmission Method and Simulator Development with Channel bonding for a Mass Broadcasting Service in HFC Networks (HFC 망에서 대용량 방송서비스를 위한 채널 결합 기반 전송 방식 및 시뮬레이터 개발)

  • Shin, Hyun-Chul;Lee, Dong-Yul;You, Woong-Shik;Choi, Dong-Joon;Lee, Chae-Woo
    • Journal of Broadcast Engineering
    • /
    • v.16 no.5
    • /
    • pp.834-845
    • /
    • 2011
  • Massive broadcasting contents such as UHD(Ultra High Definition) TV which requires multi-channel capacity for transmission has been introduced in recent years. A transmission scheme with channel bonding has been considered for transmission of massive broadcasting contents. In HFC(Hybrid Fiber Coaxial) networks, DOCSIS 3.0(Data Over Cable Service Interface Specification 3.0) has already applied channel bonding schemes for up/downstream of data service. A method unlike DOCSIS 3.0 is required to introduce a channel bonding scheme in the broadcasting service having unidirectional transmission with a downstream. Since a massive broadcasting content requires several channels for transmission, VBR(Variable Bit Rate) transmission has been emerging for the bandwidth efficiency. In addition, research on channel allocation and resource scheduling is required to guarantee QoS(Quality of Service) for the broadcasting service based on VBR. In this paper, we propose a transmission method for mass broadcasting service in HFC network and show the UHD transmission simulator developed to evaluate the performance. In order to evaluate the performance, we define various scenarios. Using the simulator, we assess the possibility of channel bonding and VBR transmission for UHD broadcasting system to provide mass broadcasting service efficiently. The developed simulator is expected to contribute to the efficient transmission system development of mass broadcasting service.