• Title/Summary/Keyword: Order Management System

Search Result 6,833, Processing Time 0.043 seconds

A Design and Development of Part Management System including Capabilities from Data Management to Order Management (데이터 관리에서 발주 관리까지 기능을 포함하는 부품 관리 시스템의 설계와 개발)

  • Rhee, Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.1
    • /
    • pp.47-56
    • /
    • 2012
  • Service Parts Management is defined as a supply management associated with service parts from the part suppliers to the final customer. A series of process to improve the customer service level by forecasting the demand and to minimize cost by maintaining the inventory level is included. Uniqueness such as missing value correction, the data pattern analysis and planned order system is designed and implemented. Main feature of order management system is to calculate order amount and order time based on selection of optimal forecasting algorithm.

A Study on the Configuration of the Quotation Management System in the Make-To-Order Manufacturing Environments (수주생산 환경에서 견적관리체계의 구성에 관한 연구)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.4
    • /
    • pp.73-81
    • /
    • 2021
  • Today's manufacturers must respond quickly to customer needs. In particular, make-to-order companies are constantly striving to satisfy customer demand for products in order to secure more favorable conditions in the future through bidding. In this bidding process, quotations play a very important role in providing favorable conditions. And the most important content that companies strive to satisfy their customers is the product's performance. Therefore, a company can attract customers and secure economic profits through good quotations, but it can be said that the first priority is to match the performance of the products requested by the customers. That is, when a company creates a quotation, it is important to structure the quotation according to the performance of the product. Thus, this paper intends to present a quotation management framework and a quotation BOM information model for constructing quotations efficiently in make-to-order manufacturing. And, in order to prove the usefulness of the proposed quotation management framework, we presents an case of the construction of an quotation management system based on the JAVA platform. As a result, the integrated quotation management system based on the proposed quotation management framework and quotation BOM has been successfully operated in a make-to-order company that manufactures marine engines.

Development and Application of Sewer Facility Management System (하수도 시설 관리 시스템의 개발 및 적용)

  • Kim, Joon Hyun;Han, Young Han
    • Journal of Industrial Technology
    • /
    • v.19
    • /
    • pp.279-285
    • /
    • 1999
  • An integrated sewer management system was developed for the analysis of sewer flow and for optimal operation of sewer works using ArcView and SWMM. SWMM and ArcView were dynamically linked together using Avenue in order to construct user-friendly management system. The developed system was applied to a residential area in Choonchun city to verify its utilities. All the relevant field data were analyzed on the basis of developed system, and the modeling of sewer flow was implemented using RUNOFF, EXTRAN, TRANSPORT in SWMM. This system is now in the process of connection to the management system of watershed and surface environment in order to develope an integrated environmental management system. Futhermore, this system will be a critical part of overall control system of sewer works including sewer line and wastewater treatment plant. As this system can provide comprehensive prediction of flow and pollution profiles, it could serve as a tool not only for optimal management, but also for decision support system to examine the efficiency of planning and implementation of sewer projects.

  • PDF

The Impact of Picking Performance by the Zone Arrangement Method in Pick to Light Order Picking System (Pick to Light 오더피킹시스템의 존 배치 방법이 피킹 생산성에 미치는 영향)

  • You, Kang-Chul;Shin, Jae-Cheon;Shim, Ho-Seob;Choi, Jong-Su;Choi, Chun-Ho;Kim, Ha-Gon;Kim, Bu-Yeol;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.207-214
    • /
    • 2010
  • The picking process in distribution center is one of the most difficult and time-consuming process. The improvement of picking productivity is a core element which decides efficiency of the distribution center. The time to shipping on vehicles from receiving depends on the arrangement of items or picking methods. The Pick to Light system typically is used to improve the efficiency of order picking. In some cases the layout design of Pick to Light system has been performed rather than scientific analysis by a common experience. Therefore, this study analyzed the impact of picking performance by the zone arrangement method in order picking process of Pick to Light system.

Development of An XML-based Order Management System Using CORBA (CORBA를 이 용한 XML기반의 오더관리시스템 개발)

  • 김영균;이홍희
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.2
    • /
    • pp.147-154
    • /
    • 2002
  • An Order Management System related to press die fabrication in automobile industry are developed in this research. This system is constructed by CORBA and XML to avoid disorder from data integration. Because CORBA can integrate diverse applications within distributed heterogeneous environments and XML can be made use of data exchange format, The developed system is available on almost any hardware platforms, operation system environments, and programming languages.

A Classification and Coding System for the Design Information Management in Make-to-Order Manufacturing (수주생산에서의 설계정보 관리를 위한 부품분류와 코딩)

  • 이규용;김재균;문치웅
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.166-170
    • /
    • 1998
  • Classification and Coding(C&C) systems as a core of design information management have been accomplished by many studies in terms of design and manufacturing attribute based on Group Technology. Those are very difficult to apply in make-to-order(MTO) manufacturing because the environment of MTO has various characteristics of product, many licensors, engineering change, insufficiency of integrated management system for codes and so on. This paper presents a suitable C&C system to MTO manufacturing which consider management level and drawing.

  • PDF

Study On the Design of Risk Management Web-Monitoring System using AANN (AANN을 이용한 웹-모니터링 시스템 설계에 관한 연구)

  • 김동회;이영삼;김성호
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.6
    • /
    • pp.545-550
    • /
    • 2004
  • Recent natural disasters like flooding and slope collapse have shown the need for natural risk management system, as they endanger directly public health and cause severe damages on the national economy. In order to improve the efficiency of risk management systems, this management system based on AANN(Auto-Associative Neural Network)is proposed in this paper. AANN can be effectively used for identification of abnormal data and data compression. The proposed AANN-based risk management system collects and stores measurement data from sensors and transmits them to remote server for web-monitoring. Generally, it is desirable to transmit the compressed data instead of raw data in normal state. However, if dangerous situation happens, rapid tramission of measurement data should be required. These requirements are easily satisfied by using AANN. In order to verify the feasibilities of the proposed system, The AANN-based risk management system is applied to slope collapse monitoring system.

Development of a Stage Management Model for R&D Projects using Expert System (전문가시스템을 이용한 R&D과제의 진행관리모형의 개발)

  • 권철신;이정일;김점복
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.52-55
    • /
    • 2000
  • The purpose of this study is to develope a stage management model for R&D projects using expert system in order to evaluate the successful accomplishment and diagnose the success level of projects at each development stage. Constructing this model, we classified the development projects for electronic parts, and designed the basic system structure through causation analysis between the factors of success influence and R&D process. We gathered the input data of expert system by enquete survey, and used ID3 algorithm in order to extract the reasoning rule.

  • PDF

A Study on the Agile Approach in Battlefield Management Information System R&D Project in Korea Military (국방 전장관리정보체계 연구개발사업의 애자일 적용 방안 연구)

  • Yun, SungHyun;Lim, GyooGun
    • Journal of Information Technology Services
    • /
    • v.20 no.1
    • /
    • pp.41-54
    • /
    • 2021
  • The SW-centered battlefield management information system R&D project takes a long period of 5-10 years or more by applying a complex and rigid batch acquisition strategy. In order to solve this problem, it is necessary to institutionalize a rapid and flexible battlefield management information system R&D project management procedure applying agile development methodology, and a government project management organization and contract management method to support it In this study, we analyzed the case of applying the Agile development method centered on Scrum to the US SW-centered weapon system R&D project and the characteristics and problems of the battlefield management information system R&D project in Korea, and suggested improvement measures as follows. First, the battlefield management information system R&D model applies the hybrid development method, and the system requirements analysis and system structure design use the existing waterfall development procedure, and the agile method is applied from the SW requirements analysis to the system integration stage. Second, flexible adjustment of performance, schedule, and cost by organizing an Agile IPT in which military (requirements) - DAPA (project management) - developer - functional specialized organizations (test and evaluation, quality, government research institutes, etc.) participate. Third, improving the Basic Order Agreement so that it can be applied to agile R&D.

A scheduling management system (SMS) using order review and release (ORR) for small & medium sized mold & die makers (ORR(Order Review and Release)을 이용한 중${\cdot}$소 사출금형업체 일정계획시스템 개발)

  • Gil, Guk-Ho;He, Jin-Feng;Kim, Dong-Won
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.620-623
    • /
    • 2004
  • Conventionally injection molds & dies are manufactured through an order-oriented manner. This brings unexpected orders into the shop floor such as hot order, re-work, and new types of mold & dies. Thus, there needs appropriate resource assignment plans considering the available times of machines and workers. Further, a scheduling system is required that can create work schedules periodically or by customers' requests. Yet, in small & medium sized mold & die makers, production schedules usually depend on the shop floor workers' experience and their manual preparation. Hence, developed in this study is a scheduling management system (SMS) based on order release and review (ORR) in small and medium sized mold & die companies. The proposed SMS considers delivery dates as well as flexible work schedules, so as to meet frequent changes of customers' order. The system can provide effective resource assigning and work scheduling plans, securing standard data associated with shop floors. Furthermore, the system pursues economical schedules for companies' needs, equipped with an available to promise (ATP) function that can effectively accommodate the changes of production plans.

  • PDF