• Title/Summary/Keyword: Optimal maintenance method

Search Result 289, Processing Time 0.035 seconds

Bayesian Method for Sequential Preventive Maintenance Policy

  • Kim Hee Soo;Kwon Young Sub;Park Dong Ho
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.131-137
    • /
    • 2005
  • In this paper, we propose a Bayesian approach to determine the adaptive preventive maintenance(PM) policy for a general sequential imperfect PM model proposed by Lin, Zuo and Yam(2000) that PM not only reduces the effective age of the system but also changes the hazard rate function. Assuming that the failure times follow Weibull distribution, we adopt a Bayesian approach to update unknown parameters and determine the Bayesian optimal sequential PM policies. Finally, numerical examples of the optimal adaptive PM policy are presented for illustrative purposes.

  • PDF

Case Study for Development of Maintenance System for Equipment of LNG-FPSO Topside (LNG-FPSO Topside 장비를 위한 보전시스템 개발을 위한 사례 연구)

  • Lee, Soon-Sup;Kim, Jong-Wang
    • Journal of Ocean Engineering and Technology
    • /
    • v.28 no.6
    • /
    • pp.533-539
    • /
    • 2014
  • A maintenance system for an offshore plant uses an optimal maintenance method, process, and period based on operation information data and economic evaluation techniques. Maintenance is performed after one or more indicators show that equipment is going to fail or that equipment performance is deteriorating. A maintenance system is based on the use of real-time data to prioritize and optimize the LNG-FPSO topside equipment resources.

Evaluation of Optimal Time Between Overhaul Period of the First Driving Devices for High-Speed Railway Vehicle (고속철도차량 1차 구동장치에 대한 완전분해정비의 최적 주기 평가)

  • Jung, Jin-Tae;Kim, Chul-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8700-8706
    • /
    • 2015
  • The first driving device of the power bogies for the Korean high-speed railway vehicle consists of the traction motor (TM) and the motor reduction gears unit (MRU). Although TM and MRU are the mechanically integrated structures, their time between overhauls (TBO) have two separate intervals due to different technical requirements(i.e. TBO of MRU: $1.8{\times}10^6km$, TBO of TM: $2.5{\times}10^6km$). Therefore, to reduce the unnecessary number of preventive maintenances, it is important to evaluate the optimal TBO with a viewpoint of reliability-center maintenance towards cost-effective solution. In this study, derived from the field data in maintenance, fault tree analysis and failure rate of the subsystem considering criticality of the components are evaluated respectively. To minimize the conventional total maintenance cost, the same optimal TBO of the components is derived from genetic algorithm considering target reliability and improvement factor. In this algorithm, a chromosome which comprised of each individual is the minimum preventive maintenance interval. The fitness function of the individual in generation is acquired through the formulation using an inverse number of the total maintenance cost. Whereas the lowest common multiple method produces only a four percent reduction compared to what the existing method did, the optimal TBO of them using genetic algorithm is $2.25{\times}10^6$km, which is reduced to about 14% comparing the conventional method.

Optimal Software Release Policy for Random Cost Model

  • Kim, Hee-Soo;Shin, Mi-Young;Park, Dong-Ho
    • Communications for Statistical Applications and Methods
    • /
    • v.12 no.3
    • /
    • pp.673-682
    • /
    • 2005
  • In this paper, we generalize the software reliability growth model by assuming that the testing cost and maintenance cost are random and adopt the Bayesian approach to determine the optimal software release time. Numerical examples are provided to illustrate the Bayesian method for certain parametric models.

Optimal maintenance scheduling of pumps in thermal power stations through reliability analysis based on few data

  • Nakamura, Masatoshi;Kumarawadu, Priyantha;Yoshida, Akinori;Hatazaki, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10a
    • /
    • pp.271-274
    • /
    • 1996
  • In this paper we made a reliability analysis of power system pumps by using the dimensional reduction method which over comes the problem due to unavailability of enpugh data in the actual systems under many different operational environments. Hence a resonable method was proposed to determine the optimum maintenance interval of given pump in thermal power stations. This analysis was based on an actual data set of pumps for over ten years in thermal power stations belonged to Kyushu Electric Power Company, Japan.

  • PDF

Maintenance Scheduling of Generation System by Fuzzy Set Theory (퍼지집합이론을 이용한 발전기보수유지계획수립)

  • Park, Jeong-Je;Choi, Jae-Seok;Baek, Ung-Ki;Cha, Jun-Min
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.127_128
    • /
    • 2009
  • A new technique using a search method which is based on fuzzy multi-criteria function is proposed for GMS(generator maintenance scheduling) in order to consider multi-objective function. Not only minimization of probabilistic production cost but also maximization of system reliability level are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model in Korea in 2010.

  • PDF

A Study on the Flexible Generator Maintenance Scheduling using Fuzzy Theory (퍼지이론을 이용한 유연한 발전기보수유지계획 수립에 관한 연구)

  • Kim, Hong-Sik;Moon, Seung-Pil;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1104-1107
    • /
    • 1999
  • A new technique using search method based on fuzzy multi-criteria function is proposed fur flexible generator maintenance scheduling. Minimization of probabilistic production cost, maximization of system reliability level and air pollution are considered fur fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by the simulation results of the real size model system of KEPCO-1997 SYSTEM.

  • PDF

Optimal Strengthening in RC Hollow Slab Bridges Using External Prestressing (외부 프리스트레싱을 이용한 RC 중공슬래브교의 최적보강)

  • Park, Kyung-Sik;Choi, Se-Hyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.6 s.58
    • /
    • pp.204-211
    • /
    • 2009
  • In this study, the optimal method is applied to strengthening of RC hollow slab bridges using external prestressing. The Queen-post and King-post shapes are considered to find the effective tendon configurations. In order to achieve the objective rating factor, the optimal configurations and tendon forces are obtained by using the Sequential Unconstrained Minimization Technique (SUMT). The object function for optimal strengthening is constituted with the dimensionless function of material costs. The constraints are formulated by design specification and the rating factor. The validity of this study is presented by the analysis of the results of strengthening of the RC hollow slab bridges.

An Artificial Neural Network for the Optimal Path Planning (최적경로탐색문제를 위한 인공신경회로망)

  • Kim, Wook;Park, Young-Moon
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.333-336
    • /
    • 1991
  • In this paper, Hopfield & Tank model-like artificial neural network structure is proposed, which can be used for the optimal path planning problems such as the unit commitment problems or the maintenance scheduling problems which have been solved by the dynamic programming method or the branch and bound method. To construct the structure of the neural network, an energy function is defined, of which the global minimum means the optimal path of the problem. To avoid falling into one of the local minima during the optimization process, the simulated annealing method is applied via making the slope of the sigmoid transfer functions steeper gradually while the process progresses. As a result, computer(IBM 386-AT 34MHz) simulations can finish the optimal unit commitment problem with 10 power units and 24 hour periods (1 hour factor) in 5 minites. Furthermore, if the full parallel neural network hardware is contructed, the optimization time will be reduced remarkably.

  • PDF

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.