• Title/Summary/Keyword: Optimal construction cost

Search Result 368, Processing Time 0.024 seconds

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.

  • PDF

Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer

  • Yoo, Hyun-Seok;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • In the last two decades, several tele-operated and machine-vision-assisted systems have been developed in the construction and maintenance area, such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for the optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans, which are used in the previously developed pavement crack sealing systems. The comparison is based on the computational cost vs. the overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in the productivity improvement of the developed automatic pavement crack sealing system.

A decision support system (DSS) for construction risk efficiency in Taiwan

  • Tsai, Tsung-Chieh;Li, Hsiang-Wen
    • Smart Structures and Systems
    • /
    • v.21 no.2
    • /
    • pp.249-255
    • /
    • 2018
  • Many studies in risk management have been focused on management process, contract relation, and risk analysis in the past decade, but very few studies have addressed project risks from the perspective of risk efficiency. This study started with using Fault Tree Analysis to develop a framework for the decision-making support system of risk management from the perspective of risk efficiency, in order for the support system to find risk strategies of optimal combination for the project manager by the trade-off between project risk and cost of project strategies. Comprehensive and realistic risk strategies must strive for optimal decisions that minimize project risks and risk strategies cost while addressing important data such as risk causes, risk probability, risk impact and risk strategies cost. The risk management in the construction phase of building projects in Taiwan upon important data has been analyzed, that provided the data for support system to include 247 risk causes. Then, 17 risk causes were extracted to demonstrates the decision-making support system of risk management from the perspective of risk efficiency in building project of Taiwan which could reach better combination type of risk strategies for the project manager by the trade-off between risk cost and project risk.

Optimum Management Plan of the HVAC Equipments with LCC Analysis (LCC 분석을 통한 공기조화 열원설비의 최적 관리방안)

  • Kim, Yong-Ki;Woo, Nam-Sub;Kang, Sung-Ju;Lee, Tae-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.8
    • /
    • pp.556-562
    • /
    • 2008
  • The building HVAC systems have very different qualities of performance and durability with the superintendent's ability for management and maintenance. The poor management of these systems finally lead to the shortening of the life expectancy and result in the increase of operating costs and energy consumptions due to low efficiencies. This study presents an example of appropriate use of the LCC(Life Cycle Cost) analysis in a process of maintaining and repairing old HVAC equipments, by demonstrating the difference of optimal economic life, decrease of running cost, and energy consumption according to the management level of the HVAC equipments. But there are no reliable life expectancy and performance history data at present for optimal management of various building service equipments. Therefore, it is necessary to construct long-term database on operation results of them for more accurate and optimized LCC analysis.

A Suggestion of a Target Costing Concept for Optimal Building Design (적정 건물 설계를 위한 Target Costing 개념 제안)

  • Ahn, Joon-Suk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.137-143
    • /
    • 2010
  • Target Costing is a modern cost management technique used in changeable market conditions. The target cost is set by subtracting the sum of production costs and profits from the market price. The purpose of this present study is to review Target Costing as a useful concept which integrates the project development process with cost management. "Minimum Waste, Maximum Value" could be achieved by setting up guidelines for optimal building design at the beginning of the project development phase. This effective budget management method will help rectify Korea's overspending problems in the area of government building construction projects.

Optimal Design of Water Supply System using Multi-objective Harmony Search Algorithm (Multi-objective Harmony Search 알고리즘을 이용한 상수도 관망 다목적 최적설계)

  • Choi, Young-Hwan;Lee, Ho-Min;Yoo, Do-Guen;Kim, Joong-Hoon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.293-303
    • /
    • 2015
  • Optimal design of the water supply pipe network aims to minimize construction cost while satisfying the required hydraulic constraints such as the minimum and maximum pressures, and velocity. Since considering one single design factor (i.e., cost) is very vulnerable for including future conditions and cannot satisfy operator's needs, various design factors should be considered. Hence, this study presents three kinds of design factors (i.e., minimizing construction cost, maximizing reliability, and surplus head) to perform multi-objective optimization design. Harmony Search (HS) Algorithm is used as an optimization technique. As well-known benchmark networks, Hanoi network and Gyeonggi-do P city real world network are used to verify the applicability of the proposed model. In addition, the proposed multi-objective model is also applied to a real water distribution networks and the optimization results were statistically analyzed. The results of the optimal design for the benchmark and real networks indicated much better performance compared to those of existing designs and the other approach (i.e., Genetic Algorithm) in terms of cost and reliability, cost, and surplus head. As a result, this study is expected to contribute for the efficient design of water distribution networks.

Optimal Road Maintenance Section Selection Using Mixed Integer Programming (혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구)

  • Cho, Geonyoung;Lim, Heejong
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.

A Study on Simulation Numerical Formula Model for Construction Process Efficiency (시공공정 효율화를 위한 시뮬레이션 수식모형 구축에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.87-95
    • /
    • 2007
  • If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.

Optimal Long-term Transmission Planning Algorithm using Non-linear Branch-and-bound Method (비선형 분산안전법을 이용한 최적장기송전계률 알고리)

  • 박영문;신중린
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.37 no.5
    • /
    • pp.272-281
    • /
    • 1988
  • The problem of optimal transmission system planning is to find the most economical locations and time of transmission line construction under the various constraints such as available rights-of-way, finances, the technical characteristics of power system, and the reliability criterion of power supply, and so on. In this paper the constraint of right-of-way is represented as a finite set of available rights-of-way. And the constructed for a unit period. The electrical constraints are represented in terms of line overload and steady state stability margin. And the reliability criterion is dealt with the suppression of failure cost and with single-contingency analysis. In general, the transmission planning problem requires integer solutions and its objective function is nonlinear. In this paper the objective function is defined as a sum of the present values of construction cost and the minimum operating cost of power system. The latter is represented as a sum of generation cost and failure cost considering the change of yearly load, economic dispatch, and the line contingency. For the calculation of operating cost linear programming is adopted on the base of DC load flow calculation, and for the optimization of main objective function nonlinear Branch-and-Bound algorithm is used. Finally, for improving the efficiency of B & B algorithm a new sensitivity analysis algorithm is proposed.

Formulation and Evaluation of Railway Optimal Alignment Design Model (철도 최적 노선설계 모형의 해석과 적용)

  • Kim, Jeong Hyun;Shin, Youngho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1845-1850
    • /
    • 2014
  • Railway operators have given a lot of efforts to determine the railway route of the minimum cost. In order to determine the optimal alignment, the alignment should be allocated satisfying the design criteria on various geographical condition with the minimum earth works. The determination of the optimal railway alignment is a kind of combination optimization because that must consider various design elements. This study developed a numerical model to determine the optimal railway alignment with the minimum construction cost. The problem was analyzed by the genetic algorithm, and the concept of the optimal alignment was established with the results from the analyses. The methodology was applied to a fictitious rail construction section and the result was evaluated. This methodology is meaningful considering the fact that the cost for energy is greater than that of the construction.