• Title/Summary/Keyword: Optimal Cost

Search Result 3,872, Processing Time 0.027 seconds

A Study on Optimal Reliability Criterion Determination for Transmission System Expansion Planning

  • Tran Trungtinh;Choi Jae-Seok;Jeon Dong-Hoon;Chu Jin-Boo;Thomas Robert;Billinton Roy
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.62-69
    • /
    • 2005
  • The optimal design of transmission system expansion planning is an important part of the overall planning task of electric power system under competitive electricity market environments. One of main keys of the successful grid expansion planning comes from optimal reliability level/criteria decision, which should be given for constraint in the optimal expansion problem. However, it's very difficult to decide logically the optimal reliability criteria of a transmission system as well as generation system expansion planning in a society. This paper approaches a methodology for deciding the optimal reliability criteria for an optimal transmission system expansion planning. A deterministic reliability criteria, BRR (Bus Reserve Rate) is used in this study. The optimal reliability criteria, BRR/sup */, is decided at minimum cost point of total cost curve which is the sum of the utility cost associated with construction cost and the customer outage cost associated with supply interruptions for load considering bus reserve rate at load buses in long term forecasting. The characteristics and effectiveness of this methodology are illustrated by the case study using IEEE-RTS.

Optimal Siting of UPFC for Reducing Congestion Cost by using Shadow Prices

  • Lee, Kwang-Ho;Moon, Jun-Mo
    • KIEE International Transactions on Power Engineering
    • /
    • 제11A권4호
    • /
    • pp.21-26
    • /
    • 2001
  • As competition is introduced in the electricity supply industry, congestion becomes a more important issue. Congestion in a transmission network occurs due to an operating condition that causes limit violations on the transmission capacities. Congestion leads to inefficient use of the system, or causes additional costs (Congestion cost). One way to reduce this inefficiency or congestion cost is to control the transmission flow through the installation of UPFC (Unified Power Flow Controller). This paper also deals with an optimal siting of the UPFC for reducing congestion cost by using shadow prices. A performance index for an optimal siting is defined as a combination of line flow sensitivities and shadow prices. The proposed algorithm is applied to the sample system with a condition, which is concerning the quadratic cost functions. Test results show that the siting of the UPFC is optimal to minimize the congestion cost by the proposed algorithm.

  • PDF

부산항 컨테이너 물류 시스템의 비용분석에 관하여 (On the Cost Analysis of Container Physical Distribution System in Pusan Port)

  • 박창호;이철영
    • 한국항해학회지
    • /
    • 제15권3호
    • /
    • pp.13-24
    • /
    • 1991
  • This paper aims to determining the optimal capacity of Pusan port in view point of Container Physical Distribution cost. It has been established a coast model of the container physical distribution system in Pusan port is composed of 4 sub-systems and in-land transport system. Cargo handling system, transfer & storage system and in-land transport system, and analyzed the cost model of the system. From this analysis, we found that the system had 7 routes including in-land transport by rail or road and coastal transport by feeder ship between Pusan port and cargo owner's door. Though railway transport cost was relatively cheap, but, it was limited to choose railway transport routes due to the introducing of transport cargo allocation practice caused by shortage of railway transport capacity. The physical distribution ost for total import & export container through Pusan port was composed of 4.47% in port entring cost, 12.98% in cargo handling cost, 7.44% in transfer & storage cost and 75.11% in in-land transport cost. Investigation in case of BCTOC verified the results as follows. 1) The optimal level of one time cargo handling was verified 236VAN (377TEU) and annual optimal handling capacity was calculated in 516, 840VAN(826, 944TEU) where berth occupancy is $\rho$=0.6 when regardless of port congestion cost, 2) The optimal level of one time cargo handling was verified 252VAN (403TEU) and annual optimal handling capacity was calculated in 502, 110VAN (803, 376TEU) where berth occupancy is $\rho$=0.58 when considering of port congestion cost.

  • PDF

AN OPTIMAL CONTROL FOR THE WAVE EQUATION WITH A LOCALIZED NONLINEAR DISSIPATION

  • Kang, Yong-Han
    • East Asian mathematical journal
    • /
    • 제22권2호
    • /
    • pp.171-188
    • /
    • 2006
  • We consider the problem of an optimal control of the wave equation with a localized nonlinear dissipation. An optimal control is used to bring the state solutions close to a desired profile under a quadratic cost of control. We establish the existence of solutions of the underlying initial boundary value problem and of an optimal control that minimizes the cost functional. We derive an optimality system by formally differentiating the cost functional with respect to the control and evaluating the result at an optimal control.

  • PDF

신뢰도 지수를 고려한 배전계통의 최적 전력전송경로 결정 (Optimal Routing of Distribution Network Considering Reliability Indices)

  • 신동환;노병권;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권9호
    • /
    • pp.1073-1080
    • /
    • 1999
  • Optimal routing of distribution networks can be attained by keeping the line power capacity limit to handle load requirements, acceptable voltage at customer loads, and the reliability indices such as SAIFI, SAIDI, CAIDI, and ASAI limits. This method is composed of optimal loss reduction and optimal reliability cost reduction. The former is solved relating to the conductor resistance of all alternative routes, and the latter is solved relating to the failure rate and duration of each alternative route. The routing considering optimal loss only and both optimal loss and optimal reliability cost are compared in this paper. The case studies with 10 and 24 bus distribution networks showed that reliability cost should be considered as well as loss reduction to achieve the optimal routing in the distribution networks.

  • PDF

생애주기비용을 고려한 PSC-I형 교량의 최적설계 (Optimal Design of PSC-I Girder Bridge Considering Life Cycle Cost)

  • 박장호;신영석
    • 한국안전학회지
    • /
    • 제24권5호
    • /
    • pp.48-56
    • /
    • 2009
  • This paper presents the procedure for the optimal design of a PSC-I girder bridge considering life cycle cost (LCC). The load carrying capacity curves for the concrete deck, PSC-I girder and $\pi$-type pier were derived and used for the estimate of service lives. Total life cycle cost for the service life was calculated as sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The advanced First Order Second Moment method was used to estimate the damage cost. The optimization method was applied to the design of PSC-I girder bridge. The objective function was set to the annual cost, which is defined by dividing the total life cycle cost by the service life, and constraints were formulated on the basis of Korean Standards. The optimal design was performed for various service lives and the effects of design factors were investigated.

최적 공급신뢰도 레벨 결정을 위한 정전비용의 평가 (Evaluation of Interruption Cost for Determination of Optimal Reliability Level)

  • 최상봉;김대경;정성환;김호용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.204-206
    • /
    • 2001
  • This paper presents methodology to evaluate interruption cost for determination of optimal reliability level. Recently, the power interruption cost is considered one of the useful index to determine optimal reliability level. Accordingly, in this paper reports estimation results of customer interruption cost to determine optimal reliability level by the economic macro method based on the 5 years from 1995 to 1999 and various kinds of customers in Korea.

  • PDF

컨테이너선의 총 운항비용 분석을 통한 노선별 최적선형 도출 (Optimal Containership Size by Way of Total Shipping Cost Analysis)

  • 김태원;한여남;남기찬;곽규석
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2004년도 추계학술대회
    • /
    • pp.245-251
    • /
    • 2004
  • 적정 규모의 컨테이너선박을 선택하여 노선에 투입시키는 것은 선사의 경쟁력 측면에서 큰 부분을 차지하고 있다. 따라서 본 연구는 대형 정기선사 운영노선에서의 최적 선형을 도출하고자 한다. 이에 본 연구에서는 먼저 선사들의 주 간선노선인 '유럽-극동', '극동 북미', '유럽 극동 북-미' 노선을 대상으로 선박 운항시 발생되는 자본비, 운영비, 항해비, 항만비, 기타비용에 의한 총 운항비용을 산출하며, 산출된 총 운항 비용과 선형별 Slot수 및 평균 처리물동량을 이용하여 노선별 최적선형을 도출한다.

  • PDF

시간별 신뢰도 가치를 고려한 분산전원의 최적 운영전략 (Optimal Operating Strategy of Distributed Generation Considering Hourly Reliability Worth)

  • 배인수;신동준;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권8호
    • /
    • pp.457-462
    • /
    • 2003
  • This paper presents an optimal operating strategy of distributed generation (DG) with reliability worth evaluation of distribution systems. Using DG for peak-shaving unit could reduce the overall system operating cost, and using DG for standby power unit could reduce the customer interruption cost. If DG operating cost is less than utility power cost in peak time, DG should be running to reduce the overall system operating cost. When customer interruption cost enlarges, however, standby power strategy may be the better operating strategy than peak-shaving strategy. Selection of whether DG should be operated for peak-shaving or for standby power, needs the accurate reliability worth evaluation and the accurate power cost evaluation. Instead of using annual average reliability worth, the concept of hourly reliability worth is introduced in this paper to determine the optimal operating decision of DG. Applying suggested hourly reliability worth, the distribution companies that possess DG could set up the optimal operating strategy of DG.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • 제71권2호
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.