In this paper, the operation regions of a three-phase voltage-source PWM converter are defined: linear modulation region, allowed current region, linear control region, unity power-factor region, and power-factor decreasing region. Particularly, the power-factor decreasing region is first examined and defined as the region where both the sinusoidal input current control and the stable DC link voltage regulation can not be obtained with a unity power-factor operation. To avoid these undesirable effects, the optimal current vector is derived, which ensures the sinusoidal input current and the stable DC link voltage regulation with maximum power-factor available, and, in consequence, it extends the operation region of the PWM converter. The validity of the proposed control scheme is proved by the computer simulation.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.53
no.4
/
pp.221-226
/
2004
Power system has recently used Double-circuit Line and Multi-circuit Line in the industrial development. This has an advantage of system stability and reliability, but the complexity of the system has a disadvantage that makes it difficult to protect the power line. Double-circuit Line has two operation conditions in the Single-circuit operation and Double-circuit operation, so it has mutual impedance. To make it possible for the remaining single-line to operate independently while there is a fault with first line or when maintenance is needed, a trip region for the single-circuit operation should be set in order to set the relay trip region. An optimal trip region for each operation, a different operational conditions for the relay setting should be calculated. In this paper, trip regions of each operation condition have been compared by considering mutual impedance and fault resistance that led to the calculation of fault impedance. Also, as we know that one of the advantages in the distance relay is the back-up protection, we calculated the trip region(Zone-2) in consideration of the mutual impedance.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.53
no.4
/
pp.221-221
/
2004
Power system has recently used Double-circuit Line and Multi-circuit Line in the industrial development. This has an advantage of system stability and reliability, but the complexity of the system has a disadvantage that makes it difficult to protect the power line. Double-circuit Line has two operation conditions in the Single-circuit operation and Double-circuit operation, so it has mutual impedance. To make it possible for the remaining single-line to operate independently while there is a fault with first line or when maintenance is needed, a trip region for the single-circuit operation should be set in order to set the relay trip region. An optimal trip region for each operation, a different operational conditions for the relay setting should be calculated. In this paper, trip regions of each operation condition have been compared by considering mutual impedance and fault resistance that led to the calculation of fault impedance. Also, as we know that one of the advantages in the distance relay is the back-up protection, we calculated the trip region(Zone-2) in consideration of the mutual impedance.
This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.
The Transactions of the Korean Institute of Power Electronics
/
v.19
no.5
/
pp.463-469
/
2014
This paper proposes a maximum torque operation strategy for the direct torque control of a surface-mounted permanent-magnet synchronous motor (SPMSM). The proposed method analyzes the available operation region of the stator flux of the SPMSM under voltage and current constraints. Based on this analysis, the optimal stator flux trajectory that yields the maximum torque is obtained across the entire operation region, including constant torque and constant power regions. The proposed strategy is also applicable in the flux-weakening region II operation of the SPMSM, which has no speed limit. The validity of the proposed method is verified through experiments conducted on an 800 W SPMSM drive system.
Kim, Jan-Mok;Rhew, Hong-Woo;Kwon, Jung-Lock;Sul, Seung-Ki
Journal of Electrical Engineering and information Science
/
v.3
no.1
/
pp.103-109
/
1998
A new flux-weakening scheme for an Interior Permanent Magnet Synchronous Motor (IPMSM) is proposed. This control scheme enables the maximum torque operation for the fast acceleration in the constant power region according to the current and voltage limit condition. Especially the dynamic performance of the braking in the flux-weakening region is improved with the compensation of the stator resistance. Also since the onset of the flux weakening operation is adjusted according to the load conditions, the machine parameters, and whether motoring or braking region, the stable and precise transition operation into or out of the flux weakening region can be achieved. The effectiveness of the proposed scheme is verified through experiments with an IPMSM drive system.
Kim, H.J.;Yu, J.S.;Won, C.Y.;Kim, E.J.;Jo, H.K.;Kim, S.H.
Proceedings of the KIPE Conference
/
2005.07a
/
pp.30-32
/
2005
In this paper, voltage control strategy for maximum torque operation of stator flux-oriented induction machine drive in the field-weakening region is proposed. In a conventional stator flux-oriented (SFO) induction machine drive system of the maximum torque capability cannot be obtained. The field-weakening method is used to vary the stator-flux reference in proportion to the inverse of the rotor speed. The proposed algorithm, based on the voltage control strategy, ensures the maximum torque operation over the field-weakening region. The proposed algorithm, voltage control strategy for maximum torque operation of capability, which is insensitive to the variation of machine parameters In the field-weakening region. The proposed algorithm is verified by simulation.
Proceedings of the Computational Structural Engineering Institute Conference
/
2000.04b
/
pp.332-339
/
2000
In this paper the characteristics of vibration induced by subway trains running on track is discussed. The quantitative prediction of the vibration level and the countermeasure for reduction of necessary, is of importance for the better environment. It was made the constructed Bundang line as first step with the modified Young-Dan type to basis on the Japanese Young-Dan type. In this paper it was measured and analyzed to two region (①Susuh-Bokjung, ②Chorim-Suhyun region) of this, at present operational Bundang line when averaging velocity of train is 60(㎞/h). As the response characteristics of frequency induced by subway operation, it was confirmed that frequency band of neighborhood of 30∼80Hz in generally dominant. Also to assess the quantitative vibration as response level to be measured for each point of two region in subway operation, the vibrational response level was measured at the state to be not subway operation. And the level was approximately 1/5∼1/10 level comparing to subway operation.
The Transactions of the Korean Institute of Power Electronics
/
v.3
no.2
/
pp.156-164
/
1998
The operation regions of a three-phase(3Ø) voltage-source(VS) PWM converter are classified in the current vector plane of the synchronous reference frame and their characteristics are explained. In the the power-factor decreasing region, the current control with unity power-factor can not give satisfactory performance to the given load because of the distortion of input current and the ripples and the steady-state errors in DC link voltage. In this paper, the derivation of the optimal current vector is proposed to solve these problems. With this, the input current can be controlled sinusoidally with available maximum power factor and the DC link voltage be the given load, resulting the expansion of the operation region of the 3Ø VS PWM converter. The validity of the proposed control method is proved by the experimental results.
Grazevicius, Audrius;Seporaitis, Marijus;Valincius, Mindaugas;Kaliatka, Algirdas
Nuclear Engineering and Technology
/
v.54
no.8
/
pp.3166-3175
/
2022
The most numerical investigations of the thermal-hydraulic phenomena following the loss of the residual heat removal capability during the mid-loop operation of the pressurized water reactor were performed according to simplifications and are not sufficiently accurate. To perform more accurate and more reliable predictions of thermal-hydraulic accidents in a nuclear power plant using computational fluid dynamics codes, a more detailed methodology is needed. Modelling results identified that thermal stratification and natural convection are observed. Temperatures of lower monitoring points remain low, while temperatures of upper monitoring points increase over time. The water in the heated region, in the upper unheated region and the pipe region was well mixed due to natural convection, meanwhile, there is no natural convection in the lower unheated region. Water temperature in the pipe region increased after a certain time delay due to circulation of flow induced by natural convection in the heated and upper unheated regions. The modelling results correspond to the experimental data. The developed computational fluid dynamics methodology could be applied for modelling of two-component single/two-phase natural convection and thermal stratification phenomena during the mid-loop operation of the pressurized water reactor or other nuclear and non-nuclear installations at similar conditions.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.