• Title/Summary/Keyword: Operation level

Search Result 4,847, Processing Time 0.033 seconds

A study on behavior of lateral-vibration about Railway truss bridge (철도트러스 교량의 횡진동 특성에 관한 연구)

  • Yoo Seoung-Hun;Cho Sun-Kyu;Oh Ji-Taek
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.916-921
    • /
    • 2004
  • At present, the highest operation speed of general domestic train is in the level of 140km/h and it is being improved to reach at the level of 200km/h in 2011. The improved environment of train operation speed which inevitably occurs owing to the operation of KTX on the existing line badly requires technology development such as testing and evaluating technology of factors hindering high speed of railway infrastructure including railway bridge, technology to ensure operation safety and technology to evaluate structure stability. Comparing dynamic numerical interpretation for railway truss bridge and load of design standard by using dynamic response measurement and analysis for the railway truss bridge currently in use, this study established the improvement program to ensure the lateral dynamic safety of truss bridge with the increased speed of train.

  • PDF

Analysis of Factors Affecting Company Performance by Smart Factory (스마트공장 보급이 중소기업 경영에 미치는 영향 요인 분석)

  • Kim, Jinhan;Cho, Jinhyung;Lee, Saejae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.76-83
    • /
    • 2019
  • The South Korean government is actively assisting the supply of the smart factory solutions to SMEs (Small & Medium-sized Enterprises) according to its manufacturing innovation 3.0 policy for the smart manufacturing as the 4th industrial revolution era unfolds. This study analyzed the impacts of the smart factory solutions, which have been supplied by the government, on the companies performances. The effects of the level of smart factory and the operation capabilities for the smart factory solutions on company performances, and the mediating effects of manufacturing capabilities have been analyzed using SPSS and AMOS. The data for this survey-based study were collected from the SMEs which implemented the smart factory solutions since 2015. The results show that the level of smart factory solutions adopted and operation capabilities for the smart factories do not have direct effects on the company performances, but their mediating effects on the manufacturing capabilities matter and the manufacturing capabilities effect directly on the company performances. In addition significant factors boosting the operation capability for the smart factory and the levels of the smart factory solutions are identified. Finally, the policy direction for enhancing the smart factory effects is presented, and the future research directions along with the limitations are suggested.

An Integrated Shop Operation System for Multi-Cell Flexible Manufacturing Systems under Job Shop Environments (멀티 셀 유연생산환경을 위한 통합운용시스템)

  • Nam, Sung-Ho;Ryu, Kwang-Yeol;Shin, Jeong-Hoon;Kwon, Ki-Eok;Lee, Seok-Woo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.4
    • /
    • pp.386-394
    • /
    • 2012
  • Recent trends in the flexible manufacturing systems are morphing cell control for the shop-wide production operation system and providing the integrated operation and execution system together with vendor-specific FMC/FMS platform. In these requirements, the shop-floor level operation system plays a role of coordinating the control activity of each cell, and has to provide flexibility for the complexity of mixed operations of various cells. This paper suggests a system architecture for the mixed environments of multi-cells and job shop, its corresponding enabling technologies based on comparative studies with other related studies and commercialized systems. This approach includes a process definition model considering the integration with upper BOM-BOP and external service modules, and reconfigurable device-level interface which provides dynamic interconnections with machine tools and cell controllers. The function modules and their implementation results are also described to provide the feasibility of the proposed approaches as the flexible shop-floor operation system for the multi-cell environments.

Development and Evaluation of the Web-based Evidence-based Practice Guideline for the Operation Patients (수술환자를 위한 웹 기반 근거중심 실무 가이드라인의 개발 및 평가)

  • Hong, Sung-Jung;Chang, Jae-Sik;Jeon, Young-Hoon;Lee, Eun-Joo;Kim, Hwa-Sun
    • Journal of Internet Computing and Services
    • /
    • v.12 no.1
    • /
    • pp.131-139
    • /
    • 2011
  • The purpose of this research is to evaluate patient's satisfaction and clinician' knowledge level about pain, nausea, vomiting, and temperature management of patients after operation by develop an web-based evidence-based practice guideline about pain, nausea, vomiting, and temperature control after operation in order to apply the guideline operation patients. The collected data was analyzed through real number, average, standard deviation, t-test and repeated ANOVA by using SPSS/WIN 17.0 program. The study subjects showed a significant difference in the level of knowledge about pain, nausea/vomiting, and temperature control after operation and patient's satisfaction, before and after applying the web-based evidence-based practice guideline.

The Effects of the Short Message Service Informing Patients' Operation Status on the Family Members' Nursing Satisfaction (SMS를 활용한 수술진행 정보제공이 간호요구 만족도에 미치는 효과)

  • Yun, Jae Hyoen;Kim, Yeong Kyeong
    • Journal of Korean Clinical Nursing Research
    • /
    • v.16 no.2
    • /
    • pp.85-93
    • /
    • 2010
  • Purpose: The purpose of this study was to investigate the effect of the SMS(Short Message Service) informing patients' surgical operation status to his or her family members on their nursing satisfaction. Methods: A non-equivalent control group non-synchronized design was used. The subjects were the family members of patients underwent spine surgery operation at a general hospital in B city. Twenty five subjects in the experimental group received SMS services whereas the other twenty five subjects in the control group received no intervention. Results: There was a significant difference in the level of nursing satisfaction in the experimental group compared to that of the control group(t=7.14, p=.001). Conclusion: The result above indicates that the level of nursing satisfaction of family members of the patients under surgical operation can be raised by providing SMS informing surgical operational status during the operation. This finding leads to the conclusion that such information service can be used as one of the efficient interventions for improving patient and family satisfactions with nursing care in a surgical unit.

3-Level Boost Converter Having Lower Inductor for Interleaving Operation (인터리빙 동작을 위한 하단 인덕터를 갖는 3-Level Boost Converter)

  • Lee, Kang-Mun;Baek, Seung-Woo;Kim, Hag-Wone;Cho, Kwan-Yuhl;Kang, Jeong-Won
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.26 no.2
    • /
    • pp.96-105
    • /
    • 2021
  • Large-scale power converters consist of series or parallel module combinations. In these modular converter systems, the interleaving technique can be applied to improve capacitor reliability by reducing the ripple of the I/O current in which each module operates as a phase difference. However, when applying the interleaving technique for conventional three-level boost converters, the short-circuit period of the converter can be an obstacle. Such problem is caused by the absence of a low-level inductor of the conventional three-level boost converter. To solve this problem, a three-level boost converter with a low-level inductor is proposed and analyzed to enable interleaved operation. In the proposed circuit, the current ripple of the output capacitor depends on the neutral point connections between the modules. In this study, the ripple current is analyzed by the neutral point connections of the three-level boost converter that has a low-level inductor, and the effectiveness of the proposed circuit is proven by simulation and experiment.

An Improved Voltage Control Scheme for DC-Link Voltage Balancing in a Four-Level Inverter (4-레벨 인버터의 DC-링크 전압 균형을 위한 향상된 전압 제어 기법)

  • Kim, Rae-Yeong;Lee, Yo-Han;Choe, Chang-Ho;Hyeon, Dong-Seok
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.48 no.10
    • /
    • pp.544-554
    • /
    • 1999
  • Multi-level inverters are now receiving widespread interest form the industrial drives for high power variable speed applications. Especially, for the high power variable speed applications, a diode clamped multi-level inverter has been widely used. However, it has the inherent problem that the voltage of the link capacitors fluctuates. This paper describes a voltage control scheme effectively to suppress the DC-link potential fluctuation for a diode clamped four-level inverter. The current to flow from/into the each link capacitor is analyzed and the operation limit is obtained when a conventional SVPWM is used. To overcome the operation limit, a modified carrier-based SVPWM is proposed. Various simulation and experiment results are presented to verify the proposed voltage control scheme for DC-link voltage balancing.

  • PDF

A Novel ZVS 3-Level Resonant Pole Inverter (새로운 ZVS 3-레벨 공진폴 인버터)

  • Baek, Ju-W.;Cho, Jung-G.;Yoo, Dong-W.;Song, Doo-I.;Won, Cung-Y.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07a
    • /
    • pp.360-364
    • /
    • 1995
  • A zero voltage switching (ZVS) three level resonant pole inverter is presented for high power GTO inverters. The concept of auxiliary resonant commutated pole(ARCP) for two level inverter is extended to the three level inverter. The proposed auxiliary commutation circuit consists of one resonant inductor and two bi-directional switches, which provides ZVS condition to the main devices without increasing device voltage or current stresses. The auxiliary device operates with zero current switching(ZCS) which enables use of the low cost thyristors. The proposed circuit can handle higher voltage and higher power(1-10MVA) comparing to the two level one. Operation and analysis of the proposed circuit are illustrated. Experimental results with 10 KW, 4 kHz prototype are presented to verify the principle of operation.

  • PDF

An Improvement in Level of Facility Security Operation (시설보안 운영수준 향상방안)

  • Chung, Tae-Hwang;Chang, Hang-Bae
    • Korean Security Journal
    • /
    • no.32
    • /
    • pp.205-225
    • /
    • 2012
  • This study is to present an improvement of facility security through the evaluation of facility security operation level. To fulfill the purpose of the study, a survey of some facilities was conducted and the result was analyzed as follows; First, although security personnels were deployed in the facilities, the level of security personnel operation was relatively low. Second, job education training level was relatively proper, that is relevant to the result that show the level of service mind and the working mind of security personnel were proper, also relevant to the relatively good work shift system. Third, although situation room was operated well, the level of restricted area set-up and access control of visitor were low, and the level of article inspection and vehicle access control were very low. Forth, the level of security manual application that include detailed security method and procedure was proper. But accident prevention and response manual application was lower than security manual application, that show preparation for fire and negligent-accident is passive. For the improvement of facility security, the high level part and low level part in the survey result could be merged. For example, we could specify factors that show low level in the survey such as security personnel operation, access control of visitor and vehicle, article inspection, accident prevention and response in the security manual and promote education circumstance that show high level.

  • PDF

Economical Analysis of Cervical Disc Disease by Anterior Inter-body Fusion Methods - Comparing of Bone Graft vs Plating - (경추간판 탈출 환자의 전방 고정술에 따른 경제적 분석 - 골 이식법과 금속판 고정 병행술의 비교 -)

  • Gill, Seung-Bae;Lee, Sang-Youl;Heo, Seung-Ho;Jang, Yeun-Gyu
    • Journal of Korean Neurosurgical Society
    • /
    • v.30 no.2
    • /
    • pp.201-206
    • /
    • 2001
  • Objective : The purpose of this study was to assess the complications, duration of admission, cost effectiveness, radiologic stabilization of the anterior cervical bone fusion in the treatment of cervical disc disease with and without plating. Materials and Methods : Fifty-two surgically treated patients for cervical disc disease were reviewed. Group I consisted of consecutive treated patients with iliac auto-bone graft without instrumentation after anterior cervical discectomy. Group II consisted of consecutive treated patients with iliac autologous-bone graft with CASPER cervical plate fixations. Radiologic fusion was decided when loss of end plate boundary between graft bone and vertebral body and immobile, maintenance of the disc space were evident on simple dynamic plain films. The patients were discharged after the stabilization of cervical motion by films was of tained. These groups were analysed multiple variably with Mann-Whitney U-test. Results : Group I consisted of 18 patients, group II consisted of 34 patients. Mean age was $49.0{\pm}8.1years$, mean duration of admission was $17.27{\pm}10.51days$, mean costs for treatment was $1,970,000{\pm}475,000won$. In group I, mean age was 47.7(34-60) years, 16 patients had undergo on one-level operation, 2-patients had undergo on two-level operation, mean duration of admission was $28.7{\pm}10.4days$, mean costs for treatment was $2,194,473{\pm}561,639won$. The periods of stabilization was $6.6{\pm}3.36weeks$ on radiologic study. Mean periods of out patient follow up was 16.8(6-64) weeks after discharge. Mean period of radiologic follow up was 17.3(4-6) weeks after surgical operation. In group II, mean age was 49.7(37-62) years and 18 patients one-level operation, 14- patients had undergo on two-level operation and 2-patients three-level operation. Mean duration of admission was $11.24{\pm}3.29days$, mean costs for treatment was $1,850,823{\pm}389,372won$. The periods of stabilization was $5.88{\pm}7.07weeks$ on radiologic study. Mean period of out patients follow up was 16.7(4-60) weeks after discharge. Mean period of radiologic follow up was 12.4(3-52) weeks after surgical operation. The duration of admission showed statistical significance in Group II but other items showed no significant difference between two groups. Conclusions : The more economic, early life return and effective method of cervical disc disease in our series were evident in patients who had undergone, iliac bone graft and plate fixations after anterior discectomy.

  • PDF