• 제목/요약/키워드: Operation and maintenance cost

검색결과 487건 처리시간 0.025초

8200호대 전기기관차용 기존품 보조전원장치의 수명주기비용 평가에 관한 연구 (A Study on the Life Cycle Cost Evaluation of the Conventional Auxiliary Power Unit for 8200 Series Electric Locomotive)

  • 이계승;김완일;김재문
    • 전기학회논문지
    • /
    • 제67권2호
    • /
    • pp.331-336
    • /
    • 2018
  • In this paper, the life cycle cost of the auxiliary power unit in the conventional 8200 series electric locomotive is evaluated and an effective life cycle cost reduction method is sought. For this, a life cycle cost evaluation model was proposed using IEC 60300-3-3 standard. As a result of analysis, material cost which accounted for a large percentage of preventive maintenance cost, accounted for 64% of total cost, and breakdown maintenance cost was as high as 27%. Except for the cost of preventive maintenance, the breakdown maintenance cost ratio was the highest. In order to reduce the LCC of the auxiliary power unit(APU) of the 8200 series in the future, it is necessary to reduce the material cost in case of development and to secure the high reliability according to the parts manufacturing so as to minimize the maintenance cost.

효과적인 PM 업무를 위한 RCM분석대상 시스템의 선정 (The selection of RCM analysis system for efficient PM Tasks)

  • 김민호;송기태;백영구;이기서;윤화현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.784-791
    • /
    • 2007
  • Most operational organization and railway authority which conduct scheduled maintenance(SM) have carried out the preventive maintenance(PM) based on the information provided from supplier and manufacturer of railway system. However these activities are far away from reality and low the efficiency, it is because an appropriate methods for system selection didn't take into account for improving maintenance efficiency. Therefore, the current SM tasks and maintenance activities lead to lots of spend on the cost and time. To solve the above problem, this thesis presents new approach methodology. This proposes the criteria for reliability centered maintenance(RCM) system selection through level of quantification of each parameter, i.e, frequency, severity and maintenance cost, etc. To do this, the field operation data and information of maintenance cost are essential. As applying this methodology, we can look forward to improving efficiency of PM/SM, and reducing cost.

  • PDF

도시철도차량 유지보수주기 최적화 연구 (A Study on the Maintenance Period Optimization for the Urban Tansit Vehicles)

  • 박기준;정종덕;서명원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.22-26
    • /
    • 2011
  • The urban transit vehicles has very complicated structures composed electric and mechanical parts and systems. Its system is important to insure operating stability pursuant to massive transfer. Also, its system takes a lot of maintenance cost than constructing cost due to its system which has longtime life cycle. Generally it is know that maintenance cost affect a lot on total cost because its life cycle cost takes a part more than 60~70%. For these reason, it is really important to reduce its maintenance cost through efficiently operation and maintenance management system construction.

  • PDF

철도차량 획득을 위한 수명주기비용 모형 및 적용 절차 (A Life Cycle Cost Model and Procedure for the Acquisition of Rolling Stocks)

  • 김종운;정광우;박준서;정종덕
    • 한국철도학회논문집
    • /
    • 제13권3호
    • /
    • pp.257-263
    • /
    • 2010
  • 일반적으로 철도차량의 운영 유지보수 비용은 구입비용보다 높다. 따라서 철도차량의 수명주기비용(LCC)을 낮추기 위해서는 운영 및 유지보수가 용이하고 비용이 적게 드는 차량이 설계되고, 효과적이고 효율적인 운영 유지보수 지원 시스템이 공급되어야 한다. 이를 위해서 운영사는 획득초기단계에서 LCC 요구사항을제시하여 LCC가 낮은 철도차량이 설계되고 제작될 수 있도록 해야 한다. 본 연구에서는 운영사가 차량의 구매사양을 공고하고 제작사가 차량을 제작하여 공급하는 일반적인 차량의 획득절차에서 운영사와 제작사의 LCC업무 및 절차를 제시한다. 또한 이 때 사용될 수 있는 검증 가능한 LCC 산출모형을 제시한다.

The Estimation Analysis Method of the Annual Operation Cost of Korean High-rise Condominiums

  • Ko, Eun Hyung;Choi, Jun Young
    • Architectural research
    • /
    • 제7권1호
    • /
    • pp.11-18
    • /
    • 2005
  • In today's building industry the emphasis has been geared more towards construction, thus building maintenance and life cycle have been neglected until now. A direct result of this neglect is the rapid aging of building, which leads to more cost-effective decision making methods for the prolongation of building life span. The following study is conducted in the area of Daegu and Seoul in order to develop the estimation analysis method of the annual operation cost of the Korean high-rise condominiums for the cost-effective decision making support through mathematical and statistical analyses including the present value and standardized measurement corrections. Based on the assumption that the life expectancy of the high rise condominium is 50 years, initial cost is ₩421,212/$m^2$, and a total sum of yearly operation cost during life expectancy is ₩2,154,499//$m^2$), yearly accumulated operation cost is shown as below: $AOC=0.7097t^4-38.803t^3+806.95t^2+11045t-496.52$ ($R^2=0.98$) (Here, AOC = Accumulated Operation Cost, t = given years)

주요 건물군의 유사도 정량화 측정 시스템 (Quantitative estimation system development for project similarity)

  • 이은지;최병일;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.162-163
    • /
    • 2014
  • Operation and maintenance stage consists the largest portion of project life cycle cost. Appropriate management and analysis of such stages have massive effect on the total project cost. The effective prediction of optimized repair period is one of main factors in ㅌ management. However, it has been analyzed that the prediction of appropriate repair period revealed limitations in reliability. Therefore, this study suggests a methodology of repair period prediction by dividing finished projects into similar groups with same properties to be compared with the target project using quantitative variables.

  • PDF

분산전원을 포함한 배전계통에서 설치비용과 유지보수 비용을 고려한 병렬 캐패시터-리액터 Bank의 최적 설치 위치 선정 (Optimal Allocation of Shunt Capacitor-Reactor Bank in Distribution System with Dispersed Generators Considering Installation and Maintenance Cost)

  • 허재행;류재근;이우리;박종영;박종근
    • 전기학회논문지
    • /
    • 제62권11호
    • /
    • pp.1511-1519
    • /
    • 2013
  • This paper proposes the allocation method for capacitor-reactor banks in a distribution system with dispersed generators to reduce the installation costs, the maintenance costs and minimize the loss of electrical energy. The expected lifetime and maintenance period of devices with moving parts depends on the total number of operations, which affects the replacement and maintenance period for aging equipment under a limited budget. In this paper, the expected device lifetimes and the maintenance period are included in the formulation, and the optimal operation status of the devices is determined using a genetic algorithm. The optimal numbers and locations for capacitor-reactor banks are determined based on the optimal operation status. Simulation results in a 69-bus distribution system with the dispersed generator show that the proposed technique performs better than conventional methods.

Application of Particle Swarm Optimization to the Reliability Centered Maintenance Method for Transmission Systems

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • 제7권6호
    • /
    • pp.814-823
    • /
    • 2012
  • Electric power transmission utilities make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability. The development of maintenance strategies for aged components is one of the more effective ways to achieve this goal. The reliability centered approach is a key method in providing optimal maintenance strategies. It considers the tradeoffs between the upfront maintenance costs and the potential costs incurred by reliability losses. This paper discusses the application of the Particle Swarm Optimization (PSO) technique used to find the optimal maintenance strategy for a transmission component in order to achieve the minimum total expected cost composed of Generation Cost (GC), Maintenance Cost (MC), Repair Cost (RC) and Outage Cost (OC). Three components of a transmission system are considered: overhead lines, underground cables and insulators are considered. In regards to aged and aging component, a component state model that uses a modified Markov chain is proposed. A simulation has been performed on an IEEE 9-bus system. The results from this simulation are quite encouraging, and then the proposed approach will be useful in practical maintenance scheduling.

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제3권2호
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

비행기지 RAPCON 유지보수비용 추정 (Estimating Maintenance Cost of RAPCON at Air Force Base)

  • 방장규;이근영
    • 한국항행학회논문지
    • /
    • 제20권6호
    • /
    • pp.511-518
    • /
    • 2016
  • 본 연구는 RAPCON을 구성하는 구성요소를 체계별로 구분하고 체계별 운영시간 에 따른 고장율 등을 분석한다. 아울러 설계수명에 점차 도달한 RAPCON의 운영 중 발생한 유지보수비용 데이터를 토대로 남은 설계수명 기간 동안 향후 발생 가능한 유지보수 비용을 추정한다. 이런 분석결과를 통해 장비의 신뢰성 관련 선행연구들에서 주로 인용되고 있는 욕조커브 (bathtub curve) 이론과 본 연구의 비용예측 결과와의 연관성을 진단하고 안정적인 유지보수를 위한 기초자료로서 활용되고자 한다. 본 시계열 분석에 사용된 자료는 T국 공군이 구형 RAPCON을 신형으로 교체하면서, 설계수명이 다된 기존 RAPCON 운영단계에서 발생했던 50개월의 유지보수비용 데이터이다. 유지보수 비용은 6개 체계별 유지보수비용을 합한 월별 유지보수비용으로 사용하였다. ARIMA 모형을 토대로 향후 10개월 간 발생 가능한 유지보수 비용을 예측한 결과 비용이 상승할 것이라는 통계적으로 신뢰할 만한 추정 결과를 얻었다.