• Title/Summary/Keyword: Operation Sequence

Search Result 572, Processing Time 0.027 seconds

Field-induced Resistive Switching in Ge25Se75-based ReRAM Device (Ge25Se75-based ReRAM 소자의 전계에 의한 저항 변화에 대한 연구)

  • Kim, Jang-Han;Nam, Ki-Hyun;Chung, Hong-Bay
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.25 no.3
    • /
    • pp.182-186
    • /
    • 2012
  • Resistance-change Random Access Memory(ReRAM) memory, which utilizes electrochemical control of metal in thin films of solid electrolyte, shows great promise as a future solid state memory. The technology utilizes the electrochemical formation and removal of metallic pathways in thin films of solid electrolyte. Key attributes are low voltage and current operation, excellent scalability, and a simple fabrication sequence. In this work, we investigated the nature of thin films formed by photo doping of $Ag^+$ ions into chalcogenide materials for use in solid electrolyte of Resistance-change RAM devices and switching characteristics according to field-effect.

Automatic Process Design System for Cold Forging of Fasteners with Various Head Geometries (다양한 머리 형상을 갖는 체결구의 냉간 단조 자동 공정 설계 시스템)

  • 김홍석;임용택
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1994.10a
    • /
    • pp.141-148
    • /
    • 1994
  • In order to improve the productivity of cold forging at low production cost, an integrated system's approach is necessary in handling the material preparation and the optimum process design, considering the forming machines, tooling, and operation including quality control. As the first step toward this approach, an expert system for multi-stage cold forging process design for fasteners with various head geometries is developed using Prolog language on IBM 486 PC. For effective representation of the complex part geometries, the system uses the multiple element input, and the forward inference scheme in determination of the initial billet size and intermediate forging steps. In order to determine intermediate steps, the basic empirical rules for extrusion, heading, and trimming were applied. The required forming loads and global strain distributions at each forging step were calculated and displayed on the PC monitor. The designed process sequence drawing can be obtained by AutoCAD. The developed system will be useful in reducing trial and error of design engineers in determining the diameter and height of the initial cylindrical billet from the final product geometry and the intermediate necessary sequences.

  • PDF

A Scheme of Adaptive Search Point Placement using DCT

  • Park, Young-Min;Chang, Chu-Seok;Lee, Changsoo
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 2001.05a
    • /
    • pp.318-324
    • /
    • 2001
  • In this paper we propose the adaptive scheme to place more search points as long as the operation tapability of the motion estimator in the video codec permits. And the proposed algorithm takes advantage of the intuitive fact that the quality of the decoded video is more degraded as the spatial frequency of the corresponding block is increased due to the augmentation of local minima per unit area. Thererore, we propose the scheme to enhance the quality by locating relatively more search points in the block with high frequency components by analyzing the spatial frequencies of the video sequence. As a result, the proposed scheme can adaptively place more search points possibly permitted by the motion estimator and guarantees better quality compared to the TSS and FS.

  • PDF

Even-phase ZCD codes for MAI Cancelled DS-CDMA Systems

  • Cha, Jae-sang
    • Proceedings of the IEEK Conference
    • /
    • 2002.07c
    • /
    • pp.1952-1955
    • /
    • 2002
  • Multiple access interference (MAI) and multi path interference(MPI) degrades the system performance in the DS-CDMA(direct-sequence code-division multiple- access)systems .0 this paper, a generalized construction method fer 2$\^$n/(n=1,2,3) phase preferred pairs(PP) with zero-correlation duration (ZCD) of (0.5N+1) chips is proposed. 2$\^$n/(n=1,2,3) phase ZCD code sets with ZCD and enlarged family sizes are generated by carrying out a chip-shift operation of the preferred pairs . The properties of the proposed codes are effective for the cancellation of MAI and MPI in DS-CDMA Systems.

  • PDF

Interactive Control of Geometric Shape Morphing based on Minkowski Sum (민코프스키 덧셈 연산에 근거한 기하 도형의 모핑 제어 방법)

  • Lee, J.-H.;Lee, J. Y.;Kim, H.;Kim, H. S.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.7 no.4
    • /
    • pp.269-279
    • /
    • 2002
  • Geometric shape morphing is an interesting geometric operation that interpolates two geometric shapes to generate in-betweens. It is well known that Minkowski operations can be used to test and build collision-free motion paths and to modify shapes in digital image processing. In this paper, we present a new geometric modeling technique to control the morphing on geometric shapes based on Minkowski sum. The basic idea develops from the linear interpolation on two geometric shapes where the traditional algebraic sum is replaced by Minkowski sum. We extend this scheme into a Bezier-like control structure with multiple control shapes, which enables the interactive control over the intermediate shapes during the morphing sequence as in the traditional CAGD curve/surface editing. Moreover, we apply the theory of blossoming to our control structure, whereby our control structure becomes even more flexible and general. In this paper, we present mathematical models of control structure, their properties, and computational issues with examples.

Unbalanced Power System Analysis in 765/345kV Parallel Transmission Line by Using EMTDC (EMTDC를 이용한 765/345kV 병가선로의 불평형 계통 해석)

  • Kim, Jong-Yul;Yoon, Jae-Young;Choi, Heung-Kwan;Lee, Woon-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.199-201
    • /
    • 2003
  • Because of Korean power system characteristics and increasing power demand, the need of 765kV transmission line is growing gradually. Now a days, KEPCO's 765kV transmission line has been tested and stands for commercial operation. During the first stage, 765kV transmission line will be operated with two voltage grades of 765kV and 345kV, which results the unbalance of power system. So unbalanced current such as zero sequence current flows in the transmission line. In this paper, we describes the simulation study of 765/345kV parallel transmission line by using EMTDC program.

  • PDF

The Development of Boiler Combustion Air Control Algorithm for Coal-Fired Power Plant (석탄화력발전소 보일러 연소용 공기 제어알고리즘의 개발)

  • Lim, Gun-Pyo;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.61 no.4
    • /
    • pp.153-160
    • /
    • 2012
  • This paper is written for the development of boiler combustion air control algorithm of coal-fired power plant by the steps of design, coding and test. The control algorithms were designed in the shape of cascade control for two parts of air master, forced draft fan pitch blade by standard function blocks. This control algorithms were coded to the control programs of distributed control systems under development. The simulator for coal-fired power plant was used in the test step and automatic control, sequence control and emergency stop tests were performed successfully like the tests of the actual power plant. The reliability will be obtained enough to apply to actual site if the total test has been completed in the state that all algorithms were linked mutually. It is expected that the project result will contribute to the safe operation of domestic power plant and the self-reliance of coal-fired power plant control technique.

Design of decoder for Pulse-Position Modulation with Trellis-Coded Modulation on Non-Directed Indoor Infrared Channel (간접 실내 적외선 채널에서 Pulse-Position Modulation with Trellis-Coded Modulation을 위한 복호기 설계)

  • Jeong, S.;Rho, S.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07g
    • /
    • pp.2467-2469
    • /
    • 1998
  • We examine the performance of high-speed non-directed infrared links using pulse-position modulation (PPM) with trellis-coded modulation (TCM) to mitigate the effects of multipath-induced intersymbol interference(ISI) on such links. Using the measured characteristics of multipath indoor infrared channels, we calculate BER curves and ISI power penalties for maximum-likelihood sequence detection of 8-PPM links using rate-2/3 trellis codes operation at 10 and 30Mb/s. Our results indicate that the suggested decoder of PPM with TCM is a very promising decoder on high-speed non-directed infrared channels.

  • PDF

Simulation and Analysis of an Automative Assembly Operation at Mercedes-Benz

  • 박영홍
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.217-217
    • /
    • 1999
  • The main objective of this study is to simulate the design and operational policies of the assembly shop of an automotive plant for planning purposes and to find possible improvements. The simulation study was used to answer the following questions: How does the sequence affect the daily throughput\ulcorner What are the bottlenecks to the assembly lines in a given scenario\ulcorner A Simulation model was developed in accordance with the objective of this study. The model incorporates detailed workstation logic to accurately model downtime results through the use of a pull cord system. It is written with SIMAN. The discrete event feature of SIMAN does not adequately model the conveyor systems of the asembly shop. As a result, a few subroutines were added to the SIMAN modeling structures to mimic the operations of the assembly shop. Use of the model uncovered attractive improvement opportunities, such as a tremendous gain in annual volume if four additional spaces were added to a between-line buffer.

  • PDF

A Study on Developing the Guideline of Risk Management utilizing BCP technique for Airport Corporation (공항전문기업의 BCP기법을 활용한 위기대응 가이드라인 개발에 관한 연구)

  • Seo, Byung Seok;Shin, Do Hyoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.67-78
    • /
    • 2015
  • The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review