• Title/Summary/Keyword: Operation Sequence

Search Result 572, Processing Time 0.025 seconds

Dispatching Rule based on Chromaticity and Color Sequence Priorities for the Gravure Printing Operation (색도 및 색순에 따른 그라비아 인쇄 공정의 작업 순서 결정 규칙)

  • Bae, Jae-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.10-20
    • /
    • 2020
  • This paper presents a method to measure the similarity of assigned jobs in the gravure printing operation based on the chromaticity and color sequence, and order the jobs accordingly. The proposed dispatching rule can be used to fulfill diverse manufacturing site requirements because the parameters can be adjusted to prioritize chromaticity and color sequence. In general, dispatching rules either ignore the job-changing time or require that the time be clearly defined. However, in the gravure printing operation targeted in this study, it is difficult to apply the general dispatching rule because of the difficulties in quantifying the job-changing time. Therefore, we propose a method for generalizing assignment rules of the job planner, allocating relative similarity among assigned jobs, and determining the sequence of jobs accordingly. Chromaticity priority is determined by the arrangement of the color assignments in the printing operation; color sequence priority is determined by the addition, deletion, or change in a specific color sequence. Finally, the job similarity is determined by the dot product of the chromaticity and color sequence priorities. Implementation of the proposed dispatching rule at an actual manufacturing site showed the planner present the same job order as that obtained using the proposed rule. Therefore, this rule is expected to be useful in industrial sites where clear quantification of the job-changing time is not possible.

Modification of Existing Similarity Coefficients by Considering an Operation Sequence Ratio in Designing Cellular Manufacturing Systems

  • Yin, Yong;Yasuda, Kazuhiko
    • Industrial Engineering and Management Systems
    • /
    • v.1 no.1
    • /
    • pp.19-28
    • /
    • 2002
  • An operation sequence of parts is one of the most important production factors in the design of cellular manufacturing systems. Many similarity coefficient method (SCM) based approaches have been proposed to solve cell formation problems in the literature. However, most of them do not consider the operation sequence factor. This study presents an operation sequence ratio (OSR) and modifies some existing similarity coefficients using the OSR to solver cell formation problems considering operation sequences. The computational results show that the OSR ratio is useful and robust in solving cell formation problems with operation sequences.

A Study on the Optimization of Drilling Operations(II): Optimum Drilling Sequence Selection for Producing a Hole (드릴가공 최적화에 대한 연구(2): 구멍가공시 최적의 드릴가공 순서 결정)

  • Rou, Hoi-Jin
    • IE interfaces
    • /
    • v.12 no.2
    • /
    • pp.346-353
    • /
    • 1999
  • In this paper, the optimum drilling operation sequence which results into the minimum overall machining time required to produce a (multi-diameter) hole is identified. The operation sequence is defined as the set of ordered operations used for producing a (multi-diameter) hole. The overall machining time is derived by summing the minimum machining times of each operation assigned to a sequence. The operations represent the drilling actions of certain sizes to produce the related holes. The minimum machining time of each operation is obtained by solving the optimization problem. Finally, this paper will identify the effects of machining constraints on the overall machining times and their relationships to sequence selection.

  • PDF

The Launch Operation Sequence through Remote Control of Bogie (보기 원격제어를 통한 발사 운용과정)

  • Lee, Chang-Bae;Seo, Jin-Ho;Lee, Soo-Jin;Chung, Eui-Seung
    • Aerospace Engineering and Technology
    • /
    • v.7 no.2
    • /
    • pp.144-150
    • /
    • 2008
  • Bogie(The Launch vehicle transporter) is the special land transportation vehicle for the LV (Launch vehicle) which is used for not only the transportation-means of LV from LVAB(Launch Vehicle Assembly Building) to LP(Launch Pad) but also one of principal tools for launch operation sequence. Due to the multi-role of Bogie, The technical requirements of bogie are very complicated. Especially launch operation has performed with not only bogie but also many ground support equipments. So, it is impossible to establish technical requirements of bogie without whole understanding of launch operation. This paper was made for arranging whole launch operation sequence and technical requirements of bogie based on the this sequence.

  • PDF

Modeling for the Automation of Start-up Operation in Boiler Plant (보일러 플랜트의 Start-Up 운전자동화를 위한 모델링)

  • 윤영진;황규석
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.1
    • /
    • pp.60-70
    • /
    • 1997
  • Since, human error is a major factor contributing to disaster during start-up of operation in Boiler plant. it is necessary to develop an automation system which prevent mode of operation that are known to be dangerous and to bring a loss of energy. The aim of this study is to suggest a model for the computer-aided synthesis of operation sequence as a part of automation system for start-up operation. Synthesis is accomplished by the formation of a hierarchical network of goals which decide sequence of operations. Hierarchical Network is formed by using method which upper goals ( i.e. upper operation al situation) are classified by the function of themselves into lower goals (i.e. lower operational situation). Knowledge for deciding operation sequence is generated by putting In order the knowledge of hazard operation and energy management.

  • PDF

Analysis and Control of Cost-Effective Topologies for Single Phase to Three Phase Power Converter (비용절감형 단상-삼상 전력변환기 구조의 해석 및 제어)

  • Lee, Hae-Chun;Park, Tae-Yeol;Kim, Gi-Taek
    • Journal of Industrial Technology
    • /
    • v.19
    • /
    • pp.217-226
    • /
    • 1999
  • A single phase to three phase power converter with cost effective and simple structure is proposed. The converter consists of rectifier and inverter. The rectifier is composed of a half wave rectifier, a dc link capacitor, and a current limiting inductor, and the inverter is of only two switches with PWM control. For negative sequence operation the inverter output voltage leads the line input by $60^{\circ}$, and for positive sequence operation the inverter output voltage leads by $60^{\circ}$. We can see that positive sequence operation shows higher output voltage, slight harmonic distortion(2%), and better performances such as high efficiency and high power factor. A mathematical model for system analysis is provided, and specifications for selection and control scheme both for start-up and for steady state are analyzed. comparison and operational limits of positive and negative sequence operation are performed, and simulations and experiments are executed to verify the proposed.

  • PDF

Load Scheduling Using a Genetic Algorithm in Port Container Terminals (컨테이너 터미날에서의 유전자 해법을 이용한 적하계획법)

  • Kim, Kap-Hwan;Kim, Ki-Young;Ko, Chang-Seong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.4
    • /
    • pp.645-660
    • /
    • 1997
  • An application of the genetic algorithm(GA) to the loading sequencing problem in port container terminals is presented in this paper. The efficiency of loading operations in port container terminals is highly dependent on the loading sequence of export containers. In order to sequence the loading operation, we hove to determine the route of each container handling equipment (transfer crane or straddle carried in the yard during the loading operation. The route of a container handling equipment is determined in a way of minimizing the total container handling time. An encoding method is developed which keeps intermediate solutions feasible and speeds up the evolution process. We determine the sequence of each individual container which the container handling equipment picks up at each yard-bay as well as the visiting sequence of yard-bays of the equipment during the loading operation. A numerical experiment is carried out to evaluate the performance of the algorithm developed.

  • PDF

Design and Evaluation of a Protection Relay for a Wind Generator Based on the Positive- and Negative-Sequence Fault Components

  • Zheng, Taiying;Cha, Seung-Tae;Kim, Yeon-Hee;Crossley, Peter A.;Lee, Sang Ho;Kang, Yong Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.5
    • /
    • pp.1029-1039
    • /
    • 2013
  • To avoid undesirable disconnection of healthy wind generators (WGs) or a wind power plant, a WG protection relay should discriminate among faults, so that it can operate instantaneously for WG, connected feeder or connection bus faults, it can operate after a delay for inter-tie or grid faults, and it can avoid operating for parallel WG or adjacent feeder faults. A WG protection relay based on the positive- and negative-sequence fault components is proposed in the paper. At stage 1, the proposed relay uses the magnitude of the positive-sequence component in the fault current to distinguish faults requiring non-operation response from those requiring instantaneous or delayed operation responses. At stage 2, the fault type is first determined using the relationships between the positive- and negative-sequence fault components. Then, the relay differentiates between instantaneous operation and delayed operation based on the magnitude of the positive-sequence fault component. Various fault scenarios involving changes in position and type of fault and faulted phases are used to verify the performance of the relay. This paper concludes by implementing the relay on a hardware platform based on a digital signal processor. Results indicate that the relay can successfully distinguish the need for instantaneous, delayed, or non-operation.

Implementation of GA Processor for Efficient Sequence Generation (효율적인 DNA 서열 생성을 위한 진화연산 프로세서 구현)

  • Jeon, Sung-Mo;Kim, Tae-Seon;Lee, Chong-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.376-379
    • /
    • 2003
  • DNA computing based DNA sequence Is operated through the biology experiment. Biology experiment used as operator causes illegal reactions through shifted hybridization, mismatched hybridization, undesired hybridization of the DNA sequence. So, it is essential to design DNA sequence to minimize the potential errors. This paper proposes method of the DNA sequence generation based evolutionary operation processor. Genetic algorithm was used for evolutionary operation and extra hardware, namely genetic algorithm processor was implemented for solving repeated evolutionary process that causes much computation time. To show efficiency of the Proposed processor, excellent result is confirmed by comparing between fitness of the DNA sequence formed randomly and DNA sequence formed by genetic algorithm processor. Proposed genetic algorithm processor can reduce the time and expense for preparing DNA sequence that is essential in DNA computing. Also it can apply design of the oligomer for development of the DNA chip or oligo chip.

  • PDF

Protection for a Wind Turbine Generator in a Large Wind Farm

  • Zheng, Tai-Ying;Kim, Yeon-Hee;Kang, Yong-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.4
    • /
    • pp.466-473
    • /
    • 2011
  • This paper proposes a protection algorithm for a wind turbine generator (WTG) in a large wind farm. To minimize the outage section, a protection relay for a WTG should operate instantaneously for an internal fault or a connected feeder fault, whereas the relay should not operate for an internal fault of another WTG connected to the same feeder or an adjacent feeder fault. In addition, the relay should operate with a delay for an inter-tie fault or a grid fault. An internal fault of another WTG connected to the same feeder or an adjacent feeder fault, where the relay should not operate, is determined based on the magnitude of the positive sequence current. To differentiate an internal fault or a connected feeder fault from an inter-tie fault or a grid fault, the phase angle of the negative sequence current is used to distinguish a fault type. The magnitude of the positive sequence current is then used to decide either instantaneous operation or delayed operation. The performance of the proposed algorithm is verified under various fault conditions with EMTP-RV generated data. The results indicate that the algorithm can successfully distinguish instantaneous operation, delayed operation, or non-operation depending on fault positions and types.