• Title/Summary/Keyword: Operation & Maintenance(O&M)

Search Result 56, Processing Time 0.023 seconds

A Basic Study on the Development of O&M Cost Assessment Model to Improve Operational Efficiency of Large Public Research Infrastructures (CAM) (대형 공공연구인프라의 운영 효율성 제고를 위한 운영 및 유지관리비 평가모델 개발 기초연구)

  • Choi, Sun-Ah;Son, Seung-Hyun;Lee, Sung-Ho;Oh, Oum-Joong;Han, Bum-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.93-94
    • /
    • 2021
  • The Korean government has invested a tremendous amount of money in the last 10 years to build large public research infrastructures (LPRI). For efficient operation and maintenance of LPRI built with expensive equipment and professional engineers, reasonable budget needs to be allocated. However, it is difficult to fulfill sustainable operation and maintenance (O&M) because there is no standard on budgeting for efficient LPRI operation, including expensive equipment and manpower allocation. There have been a lot of cost assessment studies regarding O&M of high-demand facilities such as hospitals, hotels and residential buildings, but a very few on sustainable O&M of LPRI. Therefore, mid/long-term budget establishment plans for efficient LPRI O&M are required from the initial planning stage and a cost assessment model to support the plans should be developed. The objective of this paper is to propose a cost assessment model for sustainable operation and maintenance of large public research infrastructures. To do so, actual O&M data of 6 LPRI types in operation are collected, and regression analysis model (RAM) is used for development and evaluation a cost assessment model. The study result will support sustainable operation of LPRI from a business perspective and be used as basic data for continuous development of cost assessment models to establish budgets for LPRI operation from an academic perspective.

  • PDF

Suggestions on Efficient O&M Plan for Improving Users' Satisfaction on the University Dorm Facilities (대학 기숙사 시설의 사용자 만족도 향상을 위한 효율적인 유지보수관리(O&M) 방안 제안)

  • Kim, Min Soo;Kim, Yujin;Kim, Jun Ha
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.5
    • /
    • pp.11-18
    • /
    • 2017
  • An university dorm has significant implications in terms of providing residential, living, and learning spaces. With its supportive function, a dorm enables each university to provide higher level of education. The operation & maintenance(O&M) condition of the dorm has a decisive effect on the students' satisfaction. Accordingly, high levels of O&M services should be performed for students. However, Korean dorms are being operated and maintained by their own O&M guidelines without the consideration of spatial characteristics of dorm facilities and the comprehensive and systematic understanding on effective O&M processes. Given the fact that dorm facility can be a crucial factor in determining the entire quality of university and its O&M condition is closely related to the satisfaction of students, it is imperative that we need to pay more attention to the O&M condition and services. Therefore, the main objective of this research is to improve dorm students' satisfaction levels by applying different O&M method, preventive maintenance rather than reactive maintenance which has been performed so far. In ordering for doing it, 'Facility Management(FM) Standard' from KS, 'Facility Performance Indicator(FPI)' from APPA: Leadership in educational facilities and 'Building O&M Inspection Manual' from Korean Ministry of Land, Infrastructure and Transport were analyzed to come up with 15 significant O&M factors. After extracting O&M factors, the survey was conducted to determine importance rate and performance rate of each O&M factor. Using the Important-Performance Analysis(IPA), the priority of 15 O&M factors was established. The result of this research will be helpful for the efficient dorm facility O&M services and for facility managers to appropriately allocate the limited resources and human power.

Study on Certification Policy for Stabilization of Photovoltaic Industry - A Case Study of PV Power Plant O&M - (태양광발전소 O&M 관리를 통한 발전성능 향상 방안)

  • Ahn, Hyewon;Cho, Yongsung
    • Journal of Climate Change Research
    • /
    • v.6 no.2
    • /
    • pp.105-111
    • /
    • 2015
  • With PV market extension, Operation & Maintenance (O&M) went on the floor as an effective method so solve the reduction phenomenon of Performance Ratio (PR) of PV power plant and as a new business model of photovoltaic industry. This study chose institutionalization of O&M to vitalize domestic photovoltaic industry improving level of photovoltaic technology and dominate the market in advance. The result of analyzing advanced researches and domestic cases indicates that O&M is essential of operating PV power plant, therefore, now is the time for a systematic approach to establish O&M policy.

Development and Application of the Spare-parts Cost Estimating Relationships (수리부속비 비용추정식 개발과 활용방안)

  • Ryu, Min-Kyu;Lee, Yong-Bok;Kang, Sung-Jin
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.4
    • /
    • pp.601-611
    • /
    • 2010
  • Currently, a life cycle cost estimates(LCCE) is the most important factor in weapon system acquisition process. However, operation and maintenance(O&M) cost related studies are insufficient from the previous literature survey. O&M cost consists of various cost factors such a man power, maintenance and direct & indirect support costs. We have known that spare-parts cost is a key factor in the O&M cost. In this paper, we developed the spare-parts cost estimating relationships(CERs) of fixed-wing aircraft and armored vehicle weapon systems which include 4 historical cost drivers ; system acquisition cost, deterioration rate, localization rate, mission characteristic. Furthermore, we proposed the application methodologies that O&M cost estimating, total life cycle cost estimating and determination of the economic life using the spare-parts CERs.

Flexible operation and maintenance optimization of aging cyber-physical energy systems by deep reinforcement learning

  • Zhaojun Hao;Francesco Di Maio;Enrico Zio
    • Nuclear Engineering and Technology
    • /
    • v.56 no.4
    • /
    • pp.1472-1479
    • /
    • 2024
  • Cyber-Physical Energy Systems (CPESs) integrate cyber and hardware components to ensure a reliable and safe physical power production and supply. Renewable Energy Sources (RESs) add uncertainty to energy demand that can be dealt with flexible operation (e.g., load-following) of CPES; at the same time, scenarios that could result in severe consequences due to both component stochastic failures and aging of the cyber system of CPES (commonly overlooked) must be accounted for Operation & Maintenance (O&M) planning. In this paper, we make use of Deep Reinforcement Learning (DRL) to search for the optimal O&M strategy that, not only considers the actual system hardware components health conditions and their Remaining Useful Life (RUL), but also the possible accident scenarios caused by the failures and the aging of the hardware and the cyber components, respectively. The novelty of the work lies in embedding the cyber aging model into the CPES model of production planning and failure process; this model is used to help the RL agent, trained with Proximal Policy Optimization (PPO) and Imitation Learning (IL), finding the proper rejuvenation timing for the cyber system accounting for the uncertainty of the cyber system aging process. An application is provided, with regards to the Advanced Lead-cooled Fast Reactor European Demonstrator (ALFRED).

선진 O/M 의 현황

  • Lee, Seok-Cheol
    • ETRI Journal
    • /
    • v.9 no.4
    • /
    • pp.192-214
    • /
    • 1987
  • 정보화 시대의 발전 및 통신시스팀의 디지틀화로 통신운용은 서비스의 다양화, 다기종 및 다회사 체제로 발전하고 있으며 이에 따라 이를 지원하는 O/M(Operation and Maintenance) 부문에 있어서도 새로운 체제 발전과 정립이 필요한 실정이다 본고는 이같은 필요성을 감안하여 그간 O/M 부문의 기술조사 출장내용 및 기타 관련 자료를 조사검토하여 작성한 것으로서 미국, 일본, 카나다 통신의 O/M 현황 및 발전(예상)에 대한 검토내용을 요약한 것이다.

  • PDF

Approach to Simulation of Long- and Short-Term Maintenance Planning in Floating Offshore Wind Farms (부유식 해상풍력단지의 장/단기 정비계획 시뮬레이션)

  • Nam-Kyoung Lee;Song-Kang An;Young-Jin Oh
    • Journal of Wind Energy
    • /
    • v.13 no.2
    • /
    • pp.5-12
    • /
    • 2022
  • Operations and maintenance (O&M) in offshore wind farms accounts for a substantial portion of the life cycle cost due to harsh weather conditions and vessel dispatching. In this regard, it is crucial to expedite O&M technologies in South Korea, which is in the early stage of harnessing wind resources from the ocean. This contribution investigates an O&M planning and scheduling model for floating offshore wind farms with a literature review and use case study. We introduce the development of a long- and short-term maintenance planning framework as part of an integrated O&M platform. This contains a single vessel and fleets routing composition along with technicians and a maintenance job list based on numerical algorithms. Additionally, the routing search presents the basis of decision support for economic trade-offs regarding smooth operation corresponding to ever-changing wind farm situations. The maintenance planning simulator will ultimately contribute to support yearly and day-to-day power-related decisions in a cost-effective manner.

NTT의 Network O/M 현황

  • Lee, Seok-Cheol
    • ETRI Journal
    • /
    • v.8 no.4
    • /
    • pp.144-153
    • /
    • 1986
  • 본고는 '86년 10월초 수일간에 걸쳐 일본전신전화(주) (이하 NTT로 기술함) 를 방문하여 O / M (Operation & Maintenance) 현황에 대한 협의를 가진 것 중에서 NTT가 '85년도 회사체제로 발족하여 경쟁체제의 사업분야별 독립체산제 편제로 전환한 이래 가장 큰 힘을 기울이고 있는 network O/M 분야에 대한 내용을 정리한 것이다.

  • PDF

Development of BIM based Maintenance Management Prototype System for Wastewater Treatment Plant (BIM 기반 하수처리시설 유지관리 프로토타입 시스템 개발)

  • Um, Dong-Yong;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1901-1910
    • /
    • 2014
  • Current domestic and overseas BIM practice and research efforts show very few examples that design and construction BIM data could be successfully used for efficient operation and maintenance (O&M) of infrastructure in particular. This study takes public wastewater treatment plant requiring an enhancement of operation and maintenance capability into account to develop a prototype BIM-based maintenance management system. The system is designed and implemented following a typical system development procedure and validated by the system outputs per four scenarios being considered to be main maintenance activities: The research results are expected to contribute to the upgrade of current wastewater treatment plant maintenance level, which is more demanded as water-related regulation and policy direction changes to region-based large scale O&M and asset management adoption, and overseas market participation.

A Study on Decision-making of Equipment Procurement for Plant Operations & Maintenance (O&M) - Focused on Technology Strategy perspective - (플랜트 O&M을 위한 기자재 조달방식 의사결정에 관한 연구 - 기술전략 관점을 중심으로 -)

  • Hong, Daegeun;Lim, Yongtaek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.1
    • /
    • pp.25-33
    • /
    • 2019
  • In the plant industry, the share of equipment accounts for 45 ~ 75%, which is very high. It is a traditional plant centered on processes and reactions like petroleum and chemical plants. Renewable energy generation plants such as wind power generation and solar power generation are equipment-centric plants. Equipment-centric plants are very important not only in the EPC phase but also in the operation and management phase. The procurement of equipment for plant operation and management can be divided into make and buy. Make is a method of producing equipment itself, and buy is a method of procuring equipment from the outside. The procurement method of the equipment directly affects the plant operation and management cost. In this study, the decision making of equipment procurement method for plant operation and management is defined as 4 phase. Each phase is selection of procurement decision-making objects, technology strategy perspective, finance perspective, and production perspective. In detail, we defined selection process of procurement decision-making objects and technology strategy perspective process. We will contribute to the enhancement of the competitiveness of the plant operation and management area by carrying out researches on the process and application examples of financial and production perspectives in the future.