• Title/Summary/Keyword: On-Site Assessment

Search Result 1,372, Processing Time 0.028 seconds

The Surrey Research Park: A Case Study of Strategic Planning for Economic Development

  • Parry, Malcolm
    • World Technopolis Review
    • /
    • v.1 no.3
    • /
    • pp.206-225
    • /
    • 2012
  • The development of the Surrey Research Park by the University of Surrey is an addition to a number of existing strategies to collaborate with industry that it has developed over its 120 year history. The potential to undertake this development was based on owning a substantial land holding that the University acquired when the Borough Council for the town of Guildford invited the University to relocate from Battersea in London to its new location in 1966. Initial plans for the Park in 1979 were accelerated in 1981 in response to plans by the then government to reduce funding for Higher Education in the UK. Beyond a broad master plan for the site that was based on topography and access to the site the plans that were developed were based on a survey of 100 companies that were deemed to be in the target market for the site and a review of the other 7 science parks that were being developed in the UK in 1981. The findings from this proved to be important in developing the master plan for the site. Another important influence on the project was the objectives that were defined for the 3 stakeholders in the project of the University, the tenant companies and the planning authority relate to economic development, a competitive advantage of tenant companies, knowledge transfer, the profile for the University and the capacity to generate income proved to be a valuable framework on which to develop a master plan. These details were underpinned by five objectives which served the three stakeholders in the site. Those for the University included commercial potential, knowledge transfer and image and reputation; those for the town primarily related to economic development and the plan was to help tenants gain a competitive advantage by locating on the site. In addition a number of success indicators were defined for the project against which to measure performance and have remained as a useful set of parameters on which to base the assessment of the performance of the site. In combination with these indicators a further analysis deals with the success factors that are considered as important in influencing performance. The paper sets details the history of the park and covers the success indicators and factors and reviews these in the context of the original objectives for the site.

Prediction of Potential Risk Posed by a Military Gunnery Range after Flood Control Reservoir Construction (홍수조절지 건설 후 사격장 주변지역의 위해성예측 사례연구)

  • Ryu, Hye-Rim;Han, Joon-Kyoung;Nam, Kyoung-Phile;Bae, Bum-Han
    • Journal of Soil and Groundwater Environment
    • /
    • v.12 no.1
    • /
    • pp.87-96
    • /
    • 2007
  • Risk assessment was carried out in order to improve the remediation and management strategy on a contaminated gunnery site, where a flood control reservoir is under construction nearby. Six chemicals, including explosive chemicals and heavy metals, which were suspected to possess risk to humans by leaching events from the site were the target pollutants for the assessment. A site-specific conceptual site model was constructed based on effective, reasonable exposure pathways to avoid any overestimation of the risk. Also, conservative default values were adapted to prevent underestimation of the risk when site-specific values were not available. The risks of the six contaminants were calculated by API's Decision Support System for Exposure and Risk Assessment with several assumptions. In the crater-formed-area(Ac), the non-carcinogenic risks(i.e., HI values) of TNT(Tri-Nitro-Toluene) and Cd were slightly larger than 1, and for RDX(Royal Demolition Explosives), over 50. The total non-carcinogenic risk of the whole gunnery range calculated to a significantly high value of 62.5. Carcinogenicity of Cd was estimated to be about $10^{-3}$, while that of Pb was about $5\;{\times}\;10^{-4}$, which greatly exceeded the generally acceptable carcinogenic risk level of $10^{-4}{\sim}10^{-6}$. The risk assessment results suggest that an immediate remediation practice for both carcinogens and non-carcinogens are required before the reservoir construction. However, for more accurate risk assessment, more specific estimations on condition shifts due to the construction of the reservoir are required, and more over, the effects of the pollutants to the ecosystem is also necessary to be evaluated.

Evaluation of Damage Range Variation Based on Operation System of Chlorine Facility in Water Purification Plant using KORA (KORA를 활용한 정수장 염소 취급시설의 운영조건에 따른 피해범위 변화 평가)

  • Kwak, Sollim;Lim, Hyeongjun;Ryu, Taekwon;Choi, Woosoo;Jung, Jinhee;Lee, Jieun;Kim, Jungkon;Lee, Yeonhee;Ryu, Jisung;Yoon, Junheon;Yoon, Yi;Lee, Jinseon
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.3
    • /
    • pp.84-90
    • /
    • 2018
  • We researched the way to minimize the damage when the chlorine-leak accident take place in a purification plant. Since the level of risk based on the Off-site Risk Assessment(ORA) is a combination of proportional to the number of residents in the damaged area and frequency of accidents, we suggested the adequate conditions to reduce the number of residents in the damaged area by means of the operating temperature of a handling facility, installation of a emergency shut-off valve, and the analysis of the variation of the damaging range in accordance with the type of enclosure. The coverage of damage was calculated by the 'KORA(Korea Off-site Risk Assessment Supporting Tool) program. The research shows that the lower operating temperature gets, the more emergency shut-off valve being installed and the higher enclosure level of facility becomes, the extent of damage gets decreased. The decreasing rate of worst case was 17.6%, 71%, 34.5% respectively, the decreasing rate of alternative case was 31.6%, 69.0%, 34.8% respectively.

Developing the Ecological Performance Standard for Replaced Wetlands by Analyzing Reference Wetlands (표준습지 분석을 통한 대체습지의 생태 성능 기준 개발)

  • Koo, Bon-Hak;Jeong, Jin-Yong;Park, Mi-Ok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.1
    • /
    • pp.11-22
    • /
    • 2011
  • This study was established to build and suggest the Ecological Performance Standards for replaced wetlands as the mitigation strategies for the construction projects. The request performance and assessment factors and standards were derived by bibliographic review and verified by the field survey for the reference wetlands. And the weights for each factor were derived by AHP(Analytical Hierarchy Process) method. The results are as follows : 1) Assessment factors were induced by in-depth research of many wetland assessment models and benchmarks evaluated ecological functions. This study proposed final 12 assessment factors through ecological specialist and experts interviews added with literature analysis. 2) 10 natural wetlands were selected as Reference Wetlands as the measure to propose assessment factors and assessment criteria. Those reference wetlands are well-conserved inland natural wetlands classified to the one having worthy to conserve (grade "high") according to RAM(Rapid Assessment Method). Reference wetlands chosen by the study are Parksilji, Jeongyangji, Mulkubi, Bawineupkubi, Jilnalneup, Jinchonneup, Doomoso, Haepyung wetland, Whangjeong wetland, and Whapo wetland. The research developed assessment criteria for the performance assessment factors based on several explorations of the reference wetlands. 3) "Requiring performance" of replaced wetlands is defined as "to carry out similar or same ecological functions provided by natural wetlands", in overall. The detailed requiring performances are as follows; ${\bullet}$ to play a role of wildlife habitats ${\bullet}$ to have biological diversity ${\bullet}$ to connect with other ecosystems ${\bullet}$ to provide water environment to perform good ecological functions 4) The assessment factors for required performance are categorized by wildlife habitat function, biological diversity, connectivity of adjacent ecosystem, and water environment. Wildlife habitat category is consisted of wildlife habitat creation, size of replacement wetland, and site suitability. Biological diversity category contains the number of plant species, the number of wildlife species, and number of protected species as the sub-factors. Connectivity of adjacent ecosystem is comprised of wildlife corridor, green network and distance from other ecosystem. Finally, water environment make up with water quality, depth of water body, and shape of waterfront. 5) Finally, every assessment factors were verified and weighted by the AHP methods and the final standards were proposed. The weights of factors of requiring performance suggested as habitat (0.280), connectivity (0.261), diversity (0.260), hydraulic environment (0.199). And those of detailed sub-factors are site suitability (0.118), protected species (0.096), distance to neighbor ecosystem (0.093), habitat creating (0.091), green corridor (0.090) etc.

A Study on the Correlation Analysis between the Daily Earthwork Volume and Fine Dust Concentration

  • Dong-Myeong, CHO;Ju-Yeon, LEE;Tae-Hwan, JEONG;Woo-Taeg, KWON
    • Journal of Wellbeing Management and Applied Psychology
    • /
    • v.6 no.1
    • /
    • pp.1-7
    • /
    • 2023
  • Purpose: Fine dust is classified as a group 1 carcinogen and poses a significant environmental problem that urgently requires improvement to protect the environmental rights of citizens. Given the difficulty of implementing measures to reduce overseas sources of fine dust, it is essential to first devise specific measures to address domestic emission sources. As such, this study aims to analyze the correlation between earthwork volume control and fine dust concentration as preliminary management measures to reduce the impact of scattering dust at construction sites. Based on real-time air quality information, field management measures will be presented to mitigate the effects of dust emissions. Research design, data and methodology: As examples, we selected construction sites that had recently undergone small-scale environmental impact assessment consultations. The standard earthwork volume was classified into grades using 20% intervals, and we applied AERMOD to predict the weighted concentration of fine dust based on the earthwork volume class and analyzed its correlation. Results: The results of this study demonstrate a strong correlation between earthwork volume and fine dust concentration. By utilizing the correlation analysis between earthwork volume and fine dust concentration on-site, this finding can be utilized as an effective fine dust management plan. Conclusions: This involves determining the daily earthwork intensity based on real-time air quality information and implementing measures to reduce scattering dust.

Study on EIA of Aircraft Noise II : Noise Assessment Improvement Plan (항공기소음의 환경영향평가에 관한 연구 II : 소음평가 개선방안)

  • Sun, Hyo-Sung;Park, Young-Min
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.193-195
    • /
    • 2006
  • In order to minimize the influence of aircraft noise in the vicinity of domestic airports, the establishment of proper land-use plan according to the influence scope of aircraft noise in the opening part of preparing a housing site around domestic airports is needed. For the purpose of doing it, the environmental impact assessment accompanied by the accurate prediction of aircraft noise distribution is preceded, and this paper describes the improvement plan for performing the trustworthy environmental impact assessment of aircraft noise in the neighborhood of domestic airports.

  • PDF

A Study on the Analysis of the Current Situation of the Target Site Using the Image of Unmanned Aircraft in the Environmental Impact Assessment

  • Ki-Sun Song;Sun-Jib Kim
    • International Journal of Advanced Culture Technology
    • /
    • v.11 no.2
    • /
    • pp.381-388
    • /
    • 2023
  • Small-scale environmental impact assessments have limitations in terms of survey duration and evaluation resources, which can hinder the assessment and analysis of the current situation. In this study, we propose the use of drone technology during the environmental impact assessment process to supplement these limitations in the current situation analysis. Drone photography can provide rapid and accurate high-resolution images, allowing for the collection of various information about the target area. This information can include different types of data such as terrain, vegetation, landscape, and real-time 3D spatial information, which can be collected and processed using GIS software to understand and analyze the environmental conditions. In this study, we confirmed that terrain and vegetation analysis and prediction of the target area using drone photography and GIS analysis software is possible, providing useful information for environmental impact assessments.

A Study on Landfill Gases in Old Open Dumping Landfill Site (단순 매립지내의 매립가스에 관한 연구)

  • Yeon, Ik-Jun;Ju, So-Young;Yoon, Chol;Yi, Myoung-Sun;Kim, Kwang-Yul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.1 no.1
    • /
    • pp.13-18
    • /
    • 2000
  • The purposes of this study are the analysis of landfill gases(LFGs) in old open dumping landfill site near middle city and offer the useful data for reusing the landfill site as the residental, commercial and other purposes. The concentration of $CO_2$ and $CH_4$ were lower as 8.28 vol% and 1,247 ppm but the concentrations of $NH_3$ and $H_2S$ were 7 times and 12 times higher than TLV-TWA standard. The concentration of $CH_4$ and other gases were lower than the ACGIH criterion. As the result of the environmental assessment on the open dumping landfill, if appears that this landfill is maturation phase and the formation of LFGs is reduced. If the treatment facility of $NH_3$ and $H_2S$ gases is prepared, it can be safely used as this landfill site.

  • PDF

The Assessment for Environmental Stabilization in Open Dumping Landfill Site from Physical Composition and Gas Analysis - A Case Study of Noeun Landfill - (비위생 매립지의 물리적 조성 및 가스 분석을 통한 안정화 평가 - 노은 매립지 사례 연구 -)

  • Lee, Min-Hee;Jang, Byoung-In;Yun, Cheol;Yeon, Ik-Jun;Kim, Kwang-Yul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.6 no.4
    • /
    • pp.27-35
    • /
    • 2005
  • A case study of the assessment for environmental stabilization in open dumping landfill site was carried out physical composition, total solid, moisture, and landfill gas(LFG) analysis in landfill site. The result of physical ratio were represented combustibles 23.64% and incombustibles 76.36%, TS 77.69%, VS 74.24%, FS 25.75%. The biodegradable organic matters were almost degraded and the result of the landfill gas showed that the $CH_4$ gas were measured as 4.5%. As the result of the assessment on the open dumping landfill it appears that this landfill is stabled for the maturation phase and formation $CO_2$ concentration lower than 15%.

  • PDF

Probabilistic Safety Assessment of Offsite Power System Under Typhoon-induced High Wind (소외전력망의 태풍 동반 강풍 확률론적 안전성 평가)

  • Kim, Gungyu;Kwag, Shinyoung;Eem, Seunghyun;Jin, Seung-Seop
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.3
    • /
    • pp.277-282
    • /
    • 2024
  • Recently, the intensity and frequency of typhoons have been increasing due to climate change, and typhoons can cause a loss of offsite power (LOOP) at nuclear power plants (NPPs). Therefore, it is necessary to prepare for typhoon-induced high winds through the probabilistic safety assessment (PSA) of offsite power systems. However, research on PSA for offsite power system in NPPs under typhoon-induced high winds is still lacking. In this study, PSA was performed for offsite power systems subjected to typhoon-induced high winds at the Kori NPP site, which has experienced frequent damages to its offsite power system among NPP sites in Korea. In order to perform PSA for typhoon-induced high winds in offsite power systems, the typhoon hazard at Kori NPP site was derived using logic tree and Monte Carlo simulation. Utilizing the fragility of components constituting the power system, performed a fragility analysis of the power system. Lastly, the probability that offsite power system will not be able to supply power to the NPP was derived.