• Title/Summary/Keyword: On line monitoring

Search Result 1,211, Processing Time 0.032 seconds

Spatial Distribution of Macropore Flow Percentage and Macroporosities in the Gwangneung Forest Catchment (광릉 산림 소유역에서의 대공극흐름율과 유효대공극부피분율의 공간 분포)

  • Gwak, Yong-Seok;Kim, Su-Jin;Kim, Joon;Lim, Jong-Hwan;Kim, Sang-Hyun
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.9 no.4
    • /
    • pp.234-246
    • /
    • 2007
  • The role of macropore in the hydrological processes is important at the hillslope scale. Developments and distribution of macropores have not been investigated in conjunction with the characteristics of the hillslope such as topography, soil property, and soil moisture. In this study, macropore properties, such as macropore flow and saturation hydraulic conductivity were measured at a hillslope located in Gwangneung Research Forest, Pochun-gun, Gyeonggi-do, South Korea. An intensive field survey provided a refined Digital Elevation Model (DEM) for surface and subsurface topography. Spatial distributions of upslope area and topographic index were obtained through the digital terrain analysis. The total number of monitoring points was 22, and the selected points were distributed along the transect of the digital contour map. Vertical fluxes through macropores were measured using a tension infiltrometer at the depth of 0.1 m from the surface. Spatial and temporal distributions of soil moisture were obtained using an on-line measurement system, TRASE, installed in the study area. Soil moisture for the aforementioned points was measured at 0.1 and 0.3m depths below the surface. The results from tension infiltrometer experiments present that the macropore flows ranged between 21 and 94%, and the measured macroporosities varied from 1.4 to 47%. Macropore flows and macroporosities tended to increase as the measurement location moved to downslope. The ability for water conduction through macropores becomes increasingly developed as the location approaches the outlet of the hillslope.

A Feasibility Study of Earthquake Monitoring Using a High-resolution Borehole Strainmeter (고분해능 시추공 변형률계 활용을 통한 지진 연구 가능성)

  • Soh, Inho;Chang, Chandong
    • The Journal of Engineering Geology
    • /
    • v.26 no.2
    • /
    • pp.177-185
    • /
    • 2016
  • This work investigates whether stress changes induced by an earthquake can be estimated using the deformation measured by high-resolution borehole strainmeters. We estimate the changes in the orientation and magnitude of the principal compression stresses using borehole strainmeter data recorded before and after the M7.2 El Mayor-Cucapah earthquake on April 4, 2010. Clear differences in the stress orientations and magnitudes are apparent before and after the event. The change in stress orientation appears related to subtle increases of stress in the tectonic maximum principal orientation, which is in agreement with the earthquake focal mechanism solution. The sudden stress drop at the onset of the earthquake was 10−3-10−2 MPa in the principal orientations. The Coulomb stress transfer model, which can estimate stress transfer, predicts a shear stress increase of (0.1-0.6) × 10−2 MPa at the strainmeter site, which is in line with the measured data (0.3-0.8) × 10−2 MPa. Overall, our results suggest that borehole strainmeter data reflect the subtle stress changes associated with earthquake occurrence, and that such data can be utilized for earthquake-related research.

Effect Analysis of Classical Line TI-21 type Audio Frequency Track Circuit from KTX Sancheon Return Current Harmonics (KTX산천 귀선전류고조파가 일반선 TI-21형 AF궤도회로에 미치는 영향분석)

  • Choi, Jae Sik;Kim, Hie Sik;Park, Ju Hun;Kim, Bun Gon
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.1
    • /
    • pp.38-45
    • /
    • 2016
  • The power transformation system of High Speed rolling stocks like KTX-Sancheon has shown excellent control capacities in the areas of riding comfortability, switching efficiency, safety and energy consumption due to technical developments in power-electronics, high speed & large scale integrated semiconductors and microprocessors. However, harmonics from IGBT, a high speed switching device used in the Convertor & Invertor equipment of rolling stocks have given rise to various problems in transformer substations, signaling systems, data transmission systems and facility monitoring systems. Especially, TI21 non-insulated track circuits have malfunctioned due to the influence of returning current harmonics which were generated at around of integer times of the number of power transformation equipment in the frequency domain. This paper, measures and analyzes various schemes to analyze the traveling path of the returning current harmonics generated due to the relationship between the rolling stocks and track circuits on site. Ultimately, theseschemes will be used to design high speed rolling stocks, AF track circuits and a common grounding network.

Design and Implementation of HPC Job Management Framework for Computational Scientific Simulation (계산과학 시뮬레이션을 위한 HPC 작업 관리 프레임워크의 설계 및 구현)

  • Yu, Jung-Lok;Kim, Han-Gi;Byun, Hee-Jung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.554-557
    • /
    • 2016
  • Recently, supercomputer has been increasingly adopted as a computing environment for scientific simulation as well as education, healthcare and national defence. Especially, supercomputing system with heterogeneous computing resources is gaining resurgence of interest as a next-generation problem solving environment, allowing theoretical and/or experimental research in various fields to be free of time and spatial limits. However, traditional supercomputing services have only been handled through a simple form of command-line based console, which leads to the critical limit of accessibility and usability of heterogeneous computing resources. To address this problem, in this paper, we provide the design and implementation of web-based HPC (High Performance Computing) job management framework for computational scientific simulation. The proposed framework has highly extensible design principles, providing the abstraction interfaces of job scheduler (as well as bundle scheduler plug-ins for LoadLeveler, Sun Grid Engine, OpenPBS scheduler) in order to easily incorporate the broad spectrum of heterogeneous computing resources such as cluster, computing cloud and grid. We also present the detailed specification of HTTP standard based RESTful endpoints, which manage simulation job's life-cycles such as job creation, submission, control and status monitoring, etc., enabling various 3rd-party applications to be newly created on top of the proposed framework.

  • PDF

3D Wetlands Classification Mapping of Eulsukdo Area Using LiDAR Data (LiDAR 자료를 이용한 을숙도 지역 3차원 습지 구분도 제작)

  • Lee, Jae-One;Yi, Gi-Chul;Kim, Yong-Suk;We, Kwang-Jae
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.6
    • /
    • pp.639-647
    • /
    • 2009
  • In line with the rapid settlement of information society, the demand for geospatial information and its applications are dramatically increasing. The Project of National Geographic Information System(NGIS) is actively on going to meet up-to-dateness and accuracy of geospatial data. It is fact that the public interest in environmental issues is increasing than ever in accordance with the restoration of the four major rivers, core project of Green New Deal Policy, and the event of the Ramsar General Meeting. Because the Nakdong River Estuary is a place of great importance in both aspects of wetland and environment conservation, a variety of researches related to this area are progressing. Although artificial developments and natural phenomena are rapidly changing the topography and ecosystem of this area, the effort to build topographic DB for change monitoring is very slow. This study describes a Lidar surveying project over the restored wetland Eulsukdo, the southermost part of the Nakdong River, to establish precise topographic DB throughout producing 3D topographical maps and wetland classification maps. The results of this study will make a large contribution to the systematic maintenance and management for the restored Eulsukdo wetland.

The Effects of Ownership Structure on Analysts' Earnings Forecasts (기업지배구조가 재무분석가의 이익 예측오차와 정확성에 미치는 영향)

  • Park, Bum-Jin
    • The Korean Journal of Financial Management
    • /
    • v.27 no.1
    • /
    • pp.31-62
    • /
    • 2010
  • This paper analyzes empirically how analysts' forecasts affected by ownership structure. This study examine a sample of 1,037~1,629 the analysts' forecasts of firms registered in Korean Stock Exchange in the period from 2000 to 2006. The empirical results are summarized as follows. First, from the analysis, companies which have higher major shareholder's holdings tend to increase earnings forecast errors and earnings forecast accuracy. Meanwhile, companies which have higher institution shareholder's holdings tend to decrease earnings forecast errors and earnings forecast accuracy. This result is in line with the view of previous works that companies with higher major shareholder's holdings look towards more of analysts' optimistic forecasts in order to maintain friendly relations with major shareholders. Because of analysts' private information use from major shareholders, earnings forecast accuracy is higher in high major shareholder's holdings firm than in high institution shareholder's holdings it. Second, this analysis is whether the minimal required selection condition of outside directors, audit committee adoption and audit quality affect the relation between ownership structure and analysts' forecasts. This result is that variables related corporate governance do not affect statically the relation between ownership structure and analysts' forecasts. The meanings of this paper is to suggest the positive relations between ownership structure and analysts' forecasts. After this, if analysts will notice forecasts of more many firms, capital market will be more efficient and this field works are plentiful. Also it will need monitoring systems not to distort market efficiency by analysts' dishonest forecasts.

  • PDF

A-team Based Approach for Reactive Power/Voltage Control Considering Steady State Security Assessment (정태 안전성 평가를 고려한 무효전력 전압제어를 위한 A-team기반 접근법)

  • Kim, Doo-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.2
    • /
    • pp.150-159
    • /
    • 1996
  • In this paper, an A-team(Asynchronous Team ) based approach for Reactive power and volage control considering static security assessment in a power system with infrastructural deficiencies is proposed. Reactive power and voltage control problem is the one of optimally establishing voltage level given several constraints such as reactive generation, voltage magnitude, line flow, and other switchable reactive power sources. It can be formulated as a mixed-integer linear programming(MILP) problem without deteriorating of solution accuracy to a certain extent. The security assessment is to estimate the relative robustness of the system in Its present state through the evaluation of data provided by security monitoring. Deterministic approach based on AC load flow calculations is adopted to assess the system security, especially voltage security. A security metric, as a standard of measurement for power system security, producting a set of discrete values rather than binary values, is employed. In order to analyze the above two problems, reactive power/voltage control problem and static security assessment problem, in an integrated fashion for real-time operations, a new organizational structure, called an A-team, is adopted. An A-team is an organization for agents which ale all autonomeus, work in parallel and communicate asynchronously, which is well-suited to the development of computer-based, multi-agent systems for operations. This A-team based approach, although it is still in the beginning stage, also has potential for handling other difficult power system problems.

  • PDF

The Development of a beam profile monitoring system for improving the beam output characteristics (빔 출력 특성 개선을 위한 빔 프로파일 모니터링 시스템 개발)

  • An, Young-jun;Hur, Min-goo;Yang, Seung-dae;Shin, Dae-seob;Lee, Dong-hoon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.11
    • /
    • pp.2689-2696
    • /
    • 2015
  • Radioactive isotopes which are manufactured using a cyclotron in a radioisotope used for radiation diagnosis is affected by the production yield according to size and shape of the beam and beam uniform degree from irradiated location when the proton beam investigated the target by cyclotron. Therefore, in this paper developed the BPM(Beam Profile Monitor) device capable of measuring the beam cross-section at the cyclotron beam line. It was configured so as to be able to remote control the BPM device in LabView and used the BPM program it was to be able to easily monitor and display to analyze the graph of two-dimensional graph and a three-dimensional beam distribution numerical information of the beam obtained while scanning the tungsten wire to the X and Y axis. The time it takes to measure the beam can be confirmed 37seconds when step motor driving speed was 2000pps. Through a beam readjusted based on the measured beam distribution information by optimizing the beam distribution it can be made to maximize the RI production yield and contribute supply stabilization.

Determination of Statistical Sampling Plans for Bacillus cereus in Salad and Kimbab (샐러드와 김밥의 Bacillus cereus 분석에 의한 통계적 검체채취 계획 수립)

  • Lim, Goo-Sang;Koo, Minseon;Kim, Hyun-Jung;Kho, Young-Ho;Park, Kun-Sang;Oh, Se-Wook
    • Journal of Food Hygiene and Safety
    • /
    • v.29 no.1
    • /
    • pp.16-20
    • /
    • 2014
  • The prevalence of Bacillus cereus was determined in salad and Kimbab obtained from commercial retailers. Among the 100 salad samples analyzed, 54 samples were negative for B. cereus, whereas the bacterial count was < 10 colony forming units (CFU)/g in 8 samples, < 100 CFU/g in 25 samples, < 1,000 CFU/g in 11 samples, and > 1,000 CFU/g in 2 samples. The mean (standard deviation) was 1.18 log CFU/g (${\pm}0.71$ log CFU/g). In Kimbab, B. cereus was isolated from 20 samples; the mean bacterial count was 1.01 log CFU/g (${\pm}0.71$ log CFU/g). On the basis of the monitoring data, a statistical sampling plan was determined with the NEW sampleplan program (ICMSF), which was used as an analytical tool. To identify the most suitable sampling plan, the microbial limits (m, M) and the maximum allowable number of sample units yielding unsatisfactory test results (c) were varied, but the number of samples units, n = 5, was fixed. Sampling plans showing an acceptable probability (Pa) over 0.95 were considered suitable. Two plans (A and B) were finally suggested. Parameters for plan A are n = 5, c = 0, m = 1,000, and M = 10,000 and for plan B are n = 5, c = 2, m = 100, and M = 1,000. Interestingly, the latter plan was identical to the microbial sampling plan used in New Zealand. Thus, it was concluded that the suggested plan can be used as a sampling plan that is in line with international standards.

Multidisciplinary Intestinal Rehabilitation for Short Bowel Syndrome in Adults: Results in a Korean Intestinal Rehabilitation Team (성인 단장증후군 환자의 다학제 장 재활: 국내 단일 기관 다학제 장재활 클리닉의 경험)

  • Yoon, Sojeong;Lee, Sanghoon;Park, Hyo Jung;Kim, Hyun-Jung;Yoon, Jihye;Min, Ja-Kyung;Seo, Jeong-Meen
    • Journal of Clinical Nutrition
    • /
    • v.10 no.2
    • /
    • pp.45-50
    • /
    • 2018
  • Purpose: Intense multidisciplinary team effort is required for the intestinal rehabilitation of patients afflicted with the short bowel syndrome (SBS). These include enteral and parenteral nutrition (PN) support, monitoring of complications related to treatment, and considering further medical or surgical options for intestinal adaptation. Methods: In the Intestinal Rehabilitation Team (IRT) at the Samsung Medical Center, we have experienced 20 cases of adult SBS requiring multidisciplinary intestinal rehabilitation. This study is a retrospective review of the collected medical records. Results: Of the 20 subjects treated, 12 patients were male and 8 patients were female. At the time of referral to the IRT, the mean age was 51.5 years, and the mean body weight was 50.1 kg, which was 90% of the usual body weight. The diseases or operative managements preceding massive bowel resection were malignancy in 11 cases, cardiac surgery in 2 cases, trauma in 2 cases and one case, each of tuberculosis, corrosive esophagitis, atrial fibrillation, simultaneous pancreas and kidney transplantation, and perforated appendicitis. Of these, there were 14 survivals and 6 mortalities. The fatalities were attributed to progression of disease, intestinal failure-associated liver disease, and sepsis (unrelated to intestinal failure) (2 cases each). Among the 14 surviving patients, 8 patients have been weaned off PN, whereas 6 are still dependent on PN (mean PN dependence 36%). Conclusion: This paper reports the results of multidisciplinary intestinal rehabilitation of adult short bowel patients treated at the Samsung Medical Center. Further studies are required to improve survival and enteral tolerance of these patients.