• Title/Summary/Keyword: Office building construction

Search Result 308, Processing Time 0.026 seconds

Quantification for Collapsion Probability of Building Structures( I ) (건축구조물 붕괴위험도 정량화에 관한 연구( I ))

  • 손기상
    • Journal of the Korean Society of Safety
    • /
    • v.9 no.1
    • /
    • pp.110-120
    • /
    • 1994
  • The Quantitative analysis for collapsion probability of each construcion work has not been developed, despite of that the one for safety management itself has been reported, up to now. It is concluded that showing critical check points against structure collapsion due to each work at construction site, and Quantifying those could be useful Quality-assuring tool, not to prevent Quality failure. Risk classes of each work at construction site, classified by German Builders Mutual-Aid Association (GEBMAS), and by special instruction rates of Korea Insurance Development Institute, are introduced to compare with the results of this study. As of a study method, total 2,002 sheets of questionwares are distributed directly to new city development areas, which are called, Ilsan 110 points : Pundang 79points and Chungdong 38points, including additional Changwon 125sheets and pusan 60sheets, by four(4) people, for contact with actual site engineers. Total responses of 1,056 sheets, are collected. Interrelationship diagram between experience years of Engrs., and risk rate of responses are also classified, with the criteria of four(4) years. Domestic journals with relation to construction have reported that main building Structure collapsions are mainly shown on apartment buildings and office ones. These two(2) building structures are again classified as five(5) kinds of works. This study takes use of an approach on haying the risk rates for each construction work on the above individual construction work. Additionally, site investigations have been performed to find out any possible unreasonable check items, due to construction method ; Reinforced Concret structure, Pre cast Concrete structure, and Steel structure building. Developed Quality Assurance Analysis Form with the Quantitative danger class, resulted from this study, are verified as it is able to be a good efficiency tool against collapsion of building structures.

  • PDF

Suggestion of the Attached Piping Material Rate for the Mechanical Fire Protection Facilities in Office Buildings (업무용 건축물의 기계소방시설 배관 부속자재 요율 제시)

  • Park, Lyool;Park, Kyung-Soon;Yoon, Hang-Mook
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.1-8
    • /
    • 2018
  • In generally, the estimation work regarding building mechanical service system in comparison with other architectural estimations is time-consuming, and the process is continuously getting more difficult because of the increased usage of the attached piping materials such as fittings and supports in addition to their complicated construction processes. In order to improve this problem, the Korean authority provides a simple method to estimate the attached material rate regarding the main piping material, which is the most time-consuming work in the architectural mechanical estimation. However, to be an applicable method on construction site, a proper conversion rate of the attached piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the suggestion of the material and labor cost rate of the attached piping materials such as the fittings and supports by work types and fitting methods of indoor fire, sprinkler, and extinguishing gas piping work of mechanical fire protection facilities in office buildings that have been designed after 2010.

An Analysis for Maintenance Satisfaction of Apartment Building .Residents (공동주택 거주자의 유지관리 만족도 분석에 관한 연구 - 분당지역의 민영아파트를 중심으로 -)

  • Ha, Heon-Seok;Kim Jea-Koo;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.335-339
    • /
    • 2004
  • The purpose of this study is to analysis for maintenance satisfaction of Apartment Building residents in Bundang. For this purpose, questionnaire survey about the level of maintenance satisfaction of Apartment building residents and condition of management. and secondary statistical analysis the important factors which influence the degree of residence maintenance satisfaction. The results of this study are as follows : the maintenance satisfaction of Apartment building residents high correlation with satisfaction of residence. and outsider entrance control level and the head of superintendent's office integrity gives high influence on maintenance of Apartment Building.

  • PDF

The Administrative Procedure and the Policy for the Construction of the Goon Office Buildings around the Goon-Rearrangement in 1914 (일제강점기 군폐합(1914) 전후 군청사 건축행정의 절차와 방침)

  • Kim, Myungsun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.7
    • /
    • pp.510-515
    • /
    • 2017
  • The Goon-rearrangement in 1914 caused a significant change in the Goon office buildings' construction in the Japanese colonial period. The aim of this study was to discover the administrative procedure for the construction of them around the Goon-rearrangement and also in the 1910s generally, the Japanese government-general's policy for the construction and the buildings' condition. This study analyzes the official documents for the Goon-rearrangement between the Japanese government-general of Korea and the To, the digital images of the buildings kept in the National Archive of Korea and the newspapers published in 1910s. This paper examines what the effect the construction had under the stance of the Japanese government-general of Korea, which was very passive regarding the construction of new buildings.

A Study about Circumstances and Perception of Construction Accident Compensation (건설업 재해처리에 대한 환경 및 인식변화 고찰)

  • Hong, Sung-Ho;Choi, Jin-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.69-74
    • /
    • 2010
  • It is the law that injured workers must be paid compensation through occupational health and safety insurance. But sometimes, construction companies cover the compensation for an accident by themselves in order to conceal the fact of an accident. The reason for this concealment is that they wish to get a high mark in PQ. From the point of view of a subcontractor, another reason is to avoid any negative consequences in bids. According to interviewees, some workers, knowing the vulnerability of their employers in this area, demand unreasonable levels of compensation. This study examined the circumstances, influences and participants' perception of accidents on construction sites.

Building Response to Excavation-Induced Ground Movements and Damage Estimation (굴착유발 지반변위에 의한 인접구조물의 거동 및 손상도 예측)

  • Son, Moo-Rak;Cording, E.J.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.249-256
    • /
    • 2006
  • New infrastructures and buildings are being constructed increasingly in congested urban areas, and excavation-induced ground movements often cause distortion and damage to adjacent buildings. Protection of adjacent structures occupies a major part of the cost, schedule and third-party impacts of urban development. To limit damage or mitigate their effects on nearby structures, it is highly important to understand the whole mechanism from excavation to building damage, and to estimate building damage reliably before excavation and provide appropriate measures. This paper investigates the effects of excavation-induced ground movements on nearby structures, considering soil-structure interactions for ground and structures, and a building damage criterion, which is based on the state of strain, is proposed. The criterion is compared with other existing damage estimation criteria and a procedure is finally provided for estimating building damage due to excavation-induced ground movements.

  • PDF

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.2
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

A Study on Eco-friendly Indoor Space of Domestic Eco-certified (LEED)Building through the Cases Analysis & User's Satisfaction (LEED인증 건축물 분석을 통한 실내공간의 친환경성 개선방안에 관한 연구)

  • Na, Min-Hee;Han, Hae-Ryon
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.5
    • /
    • pp.233-240
    • /
    • 2013
  • The building construction sector has been blamed as the main culprit of environmental contamination worldwide. So, there shall be some constructive alternatives in architectural engineering. As one of the alternatives, the LEED ("Leadership in Energy and Environmental Design") has been introduced since 1990s and has been well recognized in saving the resources and energy. "LEED" has also been introduced in Korea since 2002 but it has not put priority on the eco-friendliness of indoor space. In this study, the international and domestic green systems were analyzed and compared in order to restructure the checklist for indoor space. Using the restructured checklists, the questionnaire were sent to 180 people using 6 office buildings which passed the domestic "LEED" certification. LEED certification system put priority on the air quality and heating/cooling environment in its evaluation section and items. However, according to the results of the study, it was found that the people using the buildings were not satisfied enough with the air environment of buildings along with their other indoor environment items. This shows that even though the office buildings are designed according to the requirements of LEED, the buildings do not meet the occupier's needs. In addition, it showed that the evaluation items should be improved so that they are useful to enhance the satisfaction of the occupiers' needs. The paper could be useful in establishing standard for eco friendliness of indoor space of office buildings which pass the LEED certification as the basic data for increasing energy efficiency and working efficiency of occupiers of the buildings.

Site-Plan Types of Common Design's Goon Office Buildings and their Addition & Remodeling in Japanese Colonial Period (일제강점기 '공통형' 군청사의 배치 유형과 유형별 증·개축 경향)

  • Kim, Myungsun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7629-7634
    • /
    • 2015
  • The purpose of this study is is to organize the site-plan types of common design's Goon office buildings in Japanese colonial period based on the main building's shape and main & attached building connection way and to investigate all the types' addition & remodeling ways. The study used literature research method, analysing the digital images, the annotation of the images, official documents between the Japanese government-general of Korea and To, and articles of newspapers or journals. The site-plans are sorted 5 types and subdivided 13 as their addition & remodelling ways. The initial shapes of site-plan were changed to apply every Goon's site circumstances, The main buildings were always in the center ahead and attached buildings behind or next to them in any cases of new construction, addition or remodeling. The buildings of the common design's were constructed until early 1930s and it means that their architectural level was lower than Pu office buildings, although both had same administrational level.