• 제목/요약/키워드: Office building construction

검색결과 308건 처리시간 0.026초

Knowledge Support and Automation of Paneled Building Envelopes for Complex Buildings using Script Programming

  • Park, Jungdae;Im, Jinkyu
    • 국제초고층학회논문집
    • /
    • 제4권1호
    • /
    • pp.85-90
    • /
    • 2015
  • Advances in the technology of computational design are giving architects and engineers the opportunity to analyze buildings with complex geometries. This study explores the optimization and automation process using the parametric design method, and uses digital tools to achieve surface representation and panelization for curved shaped office buildings. In this paper, we propose parametric algorithms of dimensional and geometric constraints using the Knowledge-ware scripts embedded in Gehry Technologies' Digital Project. The knowledge-based design methods proposed in this study can be used to systemize the knowledge possessed by experts in the form of data. Such knowledge is required to promote collaboration between designers and engineers in the process of CAD/CAE/CAM. The aim of this study is to integrate the process into design, which establishes an integrated process. This integration enables two-way feedback between design and construction data by combining the methods used in designing, engineering, and construction.

펄라이트 치환율에 따른 경량복합패널 심재의 밀도 및 열전도율 특성 (Density and Thermal Conductivity Property of the Lightweight Composite Panel Core According to Pearlite Replacement ratio)

  • 김헌태;정병열;이상수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.175-176
    • /
    • 2014
  • Recently, in the apartment house of our country, office building, apartment, and etc, the lightweight composite panel is much used as the partition wall body. This is due to be very convenient when the execution and dismantling is convenient and it forms the space which the consumer in the space desires. Therefore, in this research, the thermal conductivity property of the lightweight composite panel core according to the replacement ratio variation of the pearlite tries to be analyze. As the density test result and replacement ratio of the pearlite increased, the density showed the tendency to rise. the replacement ratio of the pearlite increased, the absorption rate showed the tendency to fall. And this is determined that absorption rate is degraded due to the increase in the density. the thermal conductivity test result and pearlite replacement ratio increased, the tendency that the thermal conductivity increases was represented.

  • PDF

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • 한국BIM학회 논문집
    • /
    • 제5권4호
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

시대적 배경과 오피스텔 유형변화에 관한 연구 (Study on the change of office-tel pattern by time period)

  • 이정원;윤두원;허범팔
    • 한국실내디자인학회:학술대회논문집
    • /
    • 한국실내디자인학회 2002년도 춘계학술발표대회 논문집
    • /
    • pp.86-90
    • /
    • 2002
  • A new concept of building, office-tel, had gone through many ups and downs after being introduced to our nation. However, it overcame all the problems and is now an important part of the rural construction. It showed new potential especially on 1998 by flexibly corresponding when the IMF crisis occurred causing a radical social/economical change. It played a crucial role on activating the depressed real estate business and flourished like never before. This study analyses the office-tel market change pattern and factors by time period and grasps the causal relationship and attempts to set a new standard to evaluate the social/economical role and value of the office-tel.

  • PDF

사무소 건축물의 열손실 사례연구 (Heat Loss the Case Study of Office Building)

  • 김경아;김봉주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.51-54
    • /
    • 2011
  • 본 논문은 1990년대 ~ 2011년 시공중인 건축물의 커튼월의 단열성을 평가하기 위하여 내외 표면 온도를 측정하여 부위별 온도 차이를 분석하였다. 유리면이나 단열층이 있는 표면보다 커튼월의 프레임 (멀리온 바 및 스팬드럴 바)의 온도는 동절기 외부평면의 경우 6℃~10℃ 정도 높게 나타났다. 또한, 같은 프레임에서도 앵커유닛이 있는 부위가 다른 프레임보다 2℃~3℃ 더 높게 나타나 보다 큰 열 손실이 일어나고 있는 것으로 나타났다.

  • PDF

건설관리(CM)업무 활성화를 위한 종합감리업무 수립방안 (Measures to Implement Comprehensive Supervision for the Purpose of Bolstering Construction Management (CM))

  • 윤준선;유병억;한창평
    • 한국건축시공학회지
    • /
    • 제6권4호
    • /
    • pp.99-102
    • /
    • 2006
  • Although constructions are getting diverse, larger in size, and higher-storied, we witness that CM technologies are not coping with such a growing trend. In particular, CM, one of vulnerable areas, shall continue to be given priority hereafter. The research has been conducted with a strong focus on total design and supervision offices already specializing in CM projects, in order to prepare for the future activated CM markets. Authors have sought to find mistakes in the process of being in control of CM works and create measures to boost CM through case-study, documentary research, and interviews with experts. It excludes theoretical research, as many data are already accumulated domestic and abroad.

Mock-up 실험을 통한 사무소 건축물의 Roller Shade 높이 제어 최적화에 관한 기초적 연구 (A Fundamental Study of Optimization to Control on Height of Roller Shade in Office Building through Mock-up Experiment)

  • 임지선;김유신;최안섭;이정호
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2008년도 춘계학술발표대회 논문집
    • /
    • pp.148-153
    • /
    • 2008
  • An inflow of daylight to the room offers comfortable view environment, psychological and physical security to people in the room and there are merits such as a work efficiency and energy saving. But, it has many problems as an excessive direct sunlight, cooling and heating. We can expect to have energy saving effect for illumination with comfortable view environment creation through control on height of roller shade. This study will be a used a fundamental approach to control on height of roller shade to changing daylight.

  • PDF

국내 친환경건축물 인증제도와 LEED의 평가항목 비교 연구-업무시설을 중심으로 (A Study on Comparison between Korea Green Building Rating System and LEED 2009 in Office Building)

  • 이현우;최창호
    • 한국태양에너지학회 논문집
    • /
    • 제31권1호
    • /
    • pp.78-86
    • /
    • 2011
  • Recently due to the crisis of environment and resources, construction industry that effects a lot on nature than any other industries is essentially required to consider environment element through the life cycle. With the increase in the demand for sustainable and environmentally-friendly development, Green Building Certification System came into force in 2002. Lots of advanced countries and Korea have been running green building certification system. But many people of Korea is getting interested in LEED. We spend too much money to get a LEED Certification. So we need to develop our own green building certification that fits our environment. In this study, we are going to compare GBCC with LEED to develop our Green Building Rating System.

웹을 기반으로 한 실내건축공사의 원가관리 시스템 개발에 관한 연구 (A study on the development of a web-based cost management system of building interior projects)

  • 송영규
    • 한국실내디자인학회논문집
    • /
    • 제13권3호
    • /
    • pp.197-204
    • /
    • 2004
  • This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.

인공신경망 모델을 이용한 냉동기 및 공조기 최적 기동/정지 제어 (Artificial Neural Network Models for Optimal Start and Stop of Chiller and AHU)

  • 박성호;안기언;황승호;최선규;박철수
    • 대한건축학회논문집:구조계
    • /
    • 제35권2호
    • /
    • pp.45-52
    • /
    • 2019
  • BEMS(Building Energy Management Systems) have been applied to office buildings and collect relevant building energy data, e.g. temperatures, mass flow rates and energy consumptions of building mechanical systems and indoor spaces. The aforementioned measured data can be beneficially utilized for developing data-driven machine learning models which can be then used as part of MPC(Model Predictive Control) and/or optimal control strategies. In this study, the authors developed ANN(Artificial Neural Network) models of an AHU (Air Handling Unit) and a chiller for a real-life office building using BEMS data. Based on the ANN models, the authors developed optimal control strategies, e.g. daily operation schedule with regard to optimal start and stop of the AHU and the chiller (500 RT). It was found that due to the optimal start and stop of the AHU and the chiller, 4.5% and 16.4% of operation hours of the AHU and the chiller could be saved, compared to an existing operation.