• Title/Summary/Keyword: Off-site construction

Search Result 124, Processing Time 0.029 seconds

실무 3D 스캐닝 및 BIM 활용을 위한 발주자 - 실무자 간 협업프로세스 모델 (A collaborative process between employers and practitioners for utilization of BIM and 3D scanning)

  • 김도영
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.33-42
    • /
    • 2021
  • In construction sites, policies are changing considering the convergence of 3D scanning and BIM. In order to respond to this, it is urgent to develop guidelines for systematic collaboration methods that take into account the perspectives of practitioners. By participating in the delivery process using 3D scanning technology, tasks such as ordering, field scanning are defined in terms of mutual communications. Also, the collaboration process is about communications between off-site and on-site, such as feed-back using data and documents. In the future, we will propose guidelines based on such collaborative process models.

Application of Logistic Simulation for Transport of SFs From Kori Site to an Assumed Interim Storage Facility

  • Kim, Young-Min;Kim, Chang-Lak
    • 방사성폐기물학회지
    • /
    • 제19권1호
    • /
    • pp.61-74
    • /
    • 2021
  • A paradigm shift in the government's energy policy was reflected in its declaration of early closure of old nuclear plants as well as cancellation of plans for the construction of new plants. To this end, unit 1 of Kori Nuclear Power Plant was permanently shut down and is set for decommission. Based on these changes, the off-site transport of spent fuels from nuclear power plants has become a critical issue. The purpose of this study is to develop an optimized method for transportation of spent fuels from Kori Nuclear Power Plant's units 1, 2, 3, and 4 to an assumed interim storage facility by simulating the scenarios using the Flexsim software, which is widely used in logistics and manufacturing applications. The results of the simulation suggest that the optimized transport methods may contribute to the development of delivery schedule of spent fuels in the near future. Furthermore, these methods can be applied to decommissioning plan of nuclear power plants.

서스펜션 P.S. 검층을 이용한 해저 지반의 동역학적 특성에 관한 연구 (A Study on the Dynamic Characteristics of on-shore Ground Using Suspension P. S. Logging)

  • 김용수;정승용;장찬수;김수삼
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.357-364
    • /
    • 1999
  • In recently site investigations, the need for the determination of dynamic soil properties such as dynamic modules of rigidity, elasticity, dynamic poison's ratio and damping ratio etc. is increasing for the astigmatic designs of the civil structures. To obtain some of the dynamic properties, measurement of elastic waves velocity, both P and S wave, is required. Among various methods to measure elastic wave velocity such and Down Hole, Cross Hole and Refraction etc., Suspension P.S. Logging has an advantage to use for the off-shore investigation where generation of the shock wave and traveling of the wave is difficult. In suspension P.S. logging, specially designed prove equipped with source of shock wave, two 3-channel receivers, departing 1m distance, and other auxiliary facilities is inserted down in a bore hole bottom and raised in predetermined interval, usually 1m or 2m, and measurement is conducted. P.S. logging have been conducted in a off-shore construction project near InChon in the west coast for the first in the country, and form the result, potential of the liquefaction of the subsoil was evaluated and compared with the conventional method.

  • PDF

그린프레임 현장생산용 거푸집 시스템 개발을 위한 구조설계 절차 (A Process for Structural Design of Form System for in-situ Production of Green Frame)

  • 임채연;김근호;나영주;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.29-30
    • /
    • 2012
  • The precast concrete column-beam structure, Green Frame, allows the main structural members such as precast concrete column and beam to be produced on the site, resulting in a reduction of transportation cost and the margin of plant. However, existing plywood from for in-situ production of precast concrete members has problems like putting in inordinate human resource, falling-off in quality and workability. To solve those problems, form system for in-situ production of precast concrete members shall be developed. In this regard, this study aims to analyze the structural concept of from system for in-situ production. The result of this study will use for development of form system for in-situ production.

  • PDF

3D Infill을 활용한 PC모듈러 시공시스템 개발 (Development of PC modular Construction System using 3D Infill)

  • 정준수;임석호;허병욱;채지용;박진호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.14-15
    • /
    • 2020
  • The need for off-site construction has increased in the construction industry in Korea in recent years due to the enforcement of the 52-hour workweek, the increasing age of workers on construction sites, the deepening dependence on overseas workers, and the stagnation of productivity in the construction industry. Thus, studies on OSC started in April 2020. In addition, as a national policy study advocating the modular construction method, which is one of the OSC methods, was completed in the first half of 2019. 70 housing units in two complexes that satisfied the Housing Act requirements have been supplied to citizens. However, although modular construction methods have been recognized as a dramatic construction method that achieves shortened construction schedules and solves the issues of cost reduction and the shortage of technical workers on sites by combining the advantages of the manufacturing industry and applying the economies of scale, realistically it has issues due to the rising cost of steel and a low pre-fabrication ratio. Moreover, the construction time of core parts, such as those built by pouring concrete, has become a factor that hinders the shortening of construction times. Thus, this study aims to propose a precast concrete(PC) modular construction system, which fuses three-dimensional infill as an interior finish material and a three-surface PC module that can acts as a structure for a construction method that is economical and can shorten construction time.

  • PDF

공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축 (Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework)

  • 윤원건;배병윤;강태경
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.30-42
    • /
    • 2022
  • OSC는 기획, 설계, 시공, 유지보수 등의 건설생산 전 과정에 걸친 공급망과 가치사슬의 한 유형으로 건설현장이 아닌 공장 등 제 3의 장소에서 제작한 후 현장으로 운반하여 설치 및 시공하므로써 최종 목적물을 생산하는 방식이다. 본 연구에서는 PC공법 및 RC공법을 적용한 공동주택 사례를 각각 1개에 대하여 공사비를 비교하였다. PC공법 적용(PC설계비 제외)의 경우 RC공법만 적용하는 경우에 비해 골조 단위물량(m3)당 골조공사비가 약 70% 내외로 증가(RC 공종 합계 기준 50%)함을 도출하였다. PC공법 적용 사례 전체 골조 공사비 중 PC비중이 90.2%로 'PC제작비'가 54.8%, 'PC조립' 28.5%, '운반'이 6.89%를 차지하여, PC제작 및 조립 부문에서 비용 절감 노력이 필요할 것으로 판단하였다. 또한, 비용과 편익을 함께 고려할 수 있는 의사결정 프레임워크 초안을 구축하였다. 편익의 경우 OSC 기술적 장점이 반영된 공사기간, 하자보수, 재해발생, 에너지효율, 소음/분진/폐기물, 온실가스 배출 지표를 제시하였다. OSC기반 PC 공동주택 도입 의사결정을 지원하기 위한 적용 효과 근거를 마련하는데 기여할 수 있을 것으로 판단된다.

BIM 기반 프리패브 부재의 용접철근매트 정보교환 시스템 (BIM based Data Exchange System of Welded Wire/bar Mat for Pre-fab RC Members)

  • 정재환;김도형;김현기
    • 한국BIM학회 논문집
    • /
    • 제11권1호
    • /
    • pp.21-30
    • /
    • 2021
  • Reinforcing bars, a major component of the pre-fab structure, adheres to the existing on-site assembly method and attempts to develop and commercialize the technology of the pre-assembly method, but the effect is insignificant. Welded Wire / Bar Mat (WBM) has various advantages such as commercialization of rebar through machine manufacturing to improve workability, but it is different from the existing design and the construction method is different from the previous one. Therefore, to maximize the advantages of WBM and improve productivity, manufacturing, transportation, and construction from the design stage should be considered based on BIM from the initial design stage. In this paper, the concept of the design support system for the WBM was established based on the use of BIM in concrete reinforcement and the preliminary research on the WBM. WBM conversion design was performed for the existing prefabricated members, and based on this, the exchange format and system of the master prefabricated model with the WBM design data were set up. As a result of the pilot test, it was found that the traditional reinforcing bar information extracted from the master prefab model has transmitted 100% accurately. As for the WBM information, 100% of the information on the straight reinforcement was transmitted and represented, and the information on the bent reinforcement was found to have a 90% recall in the master BIM tool.

작업일보 정보를 이용한 택트공정관리방안 연구 (A Study on the Tact Management Using a Daily Report Information)

  • 김선국;나광수;김태희;유정호;이현수;김창덕
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.80-87
    • /
    • 2003
  • 최근 건설업은 복합화$\cdot$고도화에 따라 효율적 인 관리가 요망되고 있다. 그 중 출역인원관리는 다양한 공정의 변화와 단위작업의 증가로 인하여 매우 중요하다. 이에 따라 IT기술의 발달과 더불어 공사관리의 효율화를 위하여 인터넷을 기반으로 웹(Web)을 통한 현장관리시스템을 사용하고 있다. 그러나 기존시스템은 작업 일보정보를 입력하는 협력사 중심이 아닌 시공사 중심으로 개발되었고, 협력사에서는 시스템을 사용할 수 있는 환경이 조성되지 못하고 있다. 또한 작업일보 정보가 보관 및 관리 될 때까지 몇 단계를 거 치 면서 정보의 손실 및 누락이 발생되어 작업 일보 정보의 신뢰성을 떨어트리고 있다. 따라서 본 논문은 작업 일보 정보를 수집, 보관, 관리할 수 있고 협력사 중심으로 효율적인 택트공정관리를 할 수 있는 시스템 제시를 목적으로 하였다.

이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구 (An Economic Feasibility Analysis on the Movable Modular Lodging Buildings)

  • 이지희;손정욱;정운성;이준성
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.12-20
    • /
    • 2015
  • 최근 건설프로젝트는 기존의 노동집약적 현장생산 방식이 아닌, 공장 생산 기반의 현장 조립 방식인 모듈러 건축물에 주목하고 있다. 모듈러 건축 공법은 기존 방식에 비해 공기 단축효과가 높고, 해체 및 재사용이 용이해 임시 주거시설을 중심으로 적용되고 있다. 그러나 모듈러 공법 실현을 위한 초기 투자비용에 대한 부담으로 인해 국내의 모듈러 건축시장은 아직 활성화되지 못하고 있다. 이에 본 연구에서는 모듈러 건축물이 가지고 있는 경제적 부담에 대한 대안으로서 시장의 수요에 따라 이동 가능한 모듈러 건축 방식에 대하여, 기존의 건축 방식과의 생애주기비용 비교를 통해 경제적 효과를 분석하고자 한다. 본 연구에서 분석의 대상으로 삼은 RC 공법과 모듈러 공법의 이동형 모델의 경제성 평가 결과, 단기적인 측면에서는 RC공법이 빠른 수익률을 달성하였지만 건물의 전 생애주기 측면에서는 이동 가능한 모듈러 건축 방식의 경제성이 보다 큰 것으로 나타났다.

모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발 (Multi-objective Optimization Model for Tower Crane Layout Planning in Modular Construction)

  • 윤성부;박문서;정민혁;현호상;안수호
    • 한국건설관리학회논문집
    • /
    • 제22권1호
    • /
    • pp.36-46
    • /
    • 2021
  • 최근 모듈러 건축의 고층화와 함께 현장에서의 T/C 사용도 증가하였다. 이러한 T/C의 대수, 제원 및 위치를 결정하는 TCLP는 프로젝트의 공사비용, 공사기간, 안전, 생산성에 큰 영향을 미친다. 특히 모듈러 건축 프로젝트에서 조건에 부합하지 않는 TCLP는 추가 장비 투입, 재설계 등의 작업으로 이어져 공사기간과 공사비 증가가 발생할 수 있다. 따라서 현장관리자는 현장조건, 양중대상, T/C 제원 등 수많은 제약을 고려하여 프로젝트에 적합한 TCLP를 수립해야 한다. 하지만 다중 T/C를 사용하는 건설현장의 경우 추가적인 고려사항과 변수들로 인해 경험과 직관을 통해 TCLP를 수립하는데 어려움이 있다. 이를 위해 본 연구에서는 비용과 간섭면적의 최소화를 목적으로 하는 다중 최적화(multi-objective optimization) 알고리즘을 개발하고, 이를 활용하여 T/C 대수, 제원 및 위치를 선정하는 모델을 제안한다. 본 연구에서는 기존의 단일 최적화 방식과 달리 다중 최적화를 통한 TCLP 수립 프로세스를 제안함으로써, 비용과 간섭면적의 trade-off를 고려한 경제적이고 효율적인 프로젝트 완료를 기대할 수 있음을 보여주었다.