• Title/Summary/Keyword: New Project

Search Result 3,230, Processing Time 0.029 seconds

A Study on Policy Alternatives to the Development of Urban Regeneration Project Using AHP Analysis (AHP분석을 이용한 도시재생사업의 발전에 대한 정책적 대안에 관한 연구)

  • Chung, Sam-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1303-1313
    • /
    • 2022
  • Modern cities need to revitalize the downtown area, which is declining due to population decline, economic recession, and deterioration of the residential environment, economically, socially, and physically by introducing and creating new functions. In addition, the hollowing out of the existing city center is getting worse due to the development of the outskirts of the city. Therefore, the discussion for the development of urban regeneration is the core task of modern cities. This study analyzed based on a basic understanding of urban regeneration projects, and through this, the problems of domestic urban regeneration projects were derived. In addition, the problem factors and major improvement plans of the urban regeneration project were analyzed from the expert's point of view using the AHP analysis technique. Based on this, the purpose is to present policy alternatives for the future development of urban regeneration projects. The problems derived to present the policy alternatives and improvement directions of the urban regeneration project were classified into problems related to goal achievement, problems related to the business itself, and problems related to project results. It was subdivided into sub-categories. This study analyzed the problem factors and major improvements from the expert's point of view by using the AHP analysis technique for the problems of the urban regeneration project. Based on the AHP analysis results and experts' opinions, five policy alternatives for the development of urban regeneration projects were presented.

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

A COMPARATIVE STUDY OF DELAYS FACTORS IN PROJECT COMPLETION IN LIBYA AND UK CONSTRUCTION INDUSTRY

  • Shebob, A;Dawood, N; Xu, Q
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.614-620
    • /
    • 2011
  • Delays in completing construction projects have significant financial and social impact to all parties involved in the construction process and in particular in developing countries. This is very evident in most construction projects in Libya and in both public and private sectors. The research study was initiated by Libyan Government and the main aim of the project is to develop a new strategy in reducing the impact of delay factors. In order to achieve this, a number of objectives have been set-to conduct a comprehensive literature survey, to conduct a comparative study of the delay factors in project completion in both Libya and UK using semi structured questionnaire and finally, to identify and analyse the causes of delay and ranked them using frequency of occurrence and severity. The critical causes of delay for construction projects were quite different between Libya and UK. For the former, the most critical causes of delay in Libyan construction industry were low skills of manpower, changes in the scope of the project, slowness in giving instruction and poor qualification of consultant, while for the latter they were financial problems, bad weather conditions on the job site and change in the scope of project. Statistical experiments including Paired Samples T-Test, was run to test the significance of the survey data in both countries Libya and UK. The statistical results confirmed the collected data from the survey were significant.

  • PDF

Robotics Projects at Pusan National University

  • Kwak, Seung-Chul;Sung, Ji-Hoon;Shim, In-Bo;Yoon, Joong-Sun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.814-819
    • /
    • 2004
  • Soft engineering, based on symbiotic coexistence of human, machines and environment, is a new engineering field to explore the proper technology and the proper way of engineering. To explore soft engineering intents easily, various robot projects at Pusan National University conducted are presented. Thought experiment, interactive e-leaning, rapid prototyping engineering, biomimciry, tangibility, and ubiquity are concepts to be explored. Thought experiments projects are organized and performed, which include robot assembly game, Turing test, and robotics in science fiction. "Junk robot project" and "ubiquitous Pusan National University (u-PNU) project" have been organized. Also, bug robot project, interactive robot project, and interactive emotional robot projects are introduced. Weekly science fiction films are shown and discussed.

  • PDF

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

Virtual Learning Environments for Statistics Education and Applications for Official Statistics

  • Mittag Hans-Joachim
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2004.11a
    • /
    • pp.307-312
    • /
    • 2004
  • In our fast-moving information and knowledge society, skills and know-how rapidly become outdated. Virtual learning environments play a key role in meeting today's growing demand for customized educational and vocational training and lift-long teaming. The scope of multimedia-based and web-supported education is illustrated by means of an interdisciplinary multimedia project 'New Statistics' funded by the German government. The project output contains more than 70 learning modules covering the complete curriculum of an introductory statistics course. All modules are based on a statistical laboratory and on a multitude of Java applets, animations and case studies. The paper focuses on presenting the statistical laboratory and the applets. These components present the main project pillars and are particularly suitable for international use, independently from the original project framework. This article also demonstrates the application of Java applets and other multimedia developments from the educational world to official statistics for interactive presentation of statistical information.

  • PDF

A Case Study on Risk Analysis of Large Construction Projects (건설공사를 위한 위험분석기법 사례연구)

  • Kim Chang Hak;Park Seo Young;Kwak Joong Min;Kang In-Seok
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1155-1162
    • /
    • 2004
  • This research proposes a new risk analysis method in order to guarantee successful performance of construction projects. The proposed risk analysis methods consists of four phases. First step, AHP model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Finally, Fuzzy theory suggests a risk management method for construction projects, which is using subjective knowledge of an expert and linguistic value, to analyze and quantify risk. The result of study is expected to improve the accuracy of risk analysis because three factors, such as probability, impact and exposure, for estimating membership function are introduced to quantify each risk factor. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF

A Study on Collaborative e-Marketplaces for Trade (e마켓플레이스 간 협업을 통한 전자무역 모델에 대한 연구)

  • Park, Jae-Chon;Yang, Je-Min
    • International Commerce and Information Review
    • /
    • v.7 no.2
    • /
    • pp.115-137
    • /
    • 2005
  • E-trade is important that SMEs can do international business with activity. However, SMEs are facing psychological and economic barriers to e-trade. Therefore, SMEs depend on intermediaries for e-trading. In this context, APEC carried out the APEC Global B2B Interoperability Project to promote e-trade and increase benefits for member countries from 2002 to 2004. Especially this project emphasizes a collaboration with e-marketplaces. It has significance in that it is a new model to help SMEs do international trade. This study analyzes the APEC project in terms of technology and business and evaluates the project as a collaborative business model.

  • PDF

Synthesis of SATE Prodrug of 6'-Fluoro-6'-methyl-5'-noradenosine Nucleoside Phosphonic Acid as a New Class of Anti-HIV Agent

  • Li, Hua;Yoo, Jin-Cheol;Baik, Young-Chan;Lee, Won-Jae;Hong, Joon-Hee
    • Bulletin of the Korean Chemical Society
    • /
    • v.31 no.9
    • /
    • pp.2514-2518
    • /
    • 2010
  • A very simple synthetic route of a novel SATE prodrug type of 6'-fluoro-6'-methyl-5'-noradeonosine carbocyclic nucleoside phosphonic acid is described. The key fluorinated alcohol intermediate 7 was prepared from the epoxide intermediate 6a via selective ring-opening of epoxide. Coupling of 7 with $N^6$-bis-Boc-adenine under a Mitsunobu reaction followed by phosphonation and deprotection afforded the carbocyclic phosphonic acid. The chemical stability of the bis(SATE) derivative 13 was measured at neutral (pH 7.2) and slightly acidic (Milli-Q water, pH 5.5) pH. The antiviral activity test of the SATE prodrug 13 and its parent nucleoside phosphonic acid 11 were evaluated against HIV-1.

A Study on Constructing Common Database for Supporting Urban Rail Transit Project

  • Lee, Young-Hoon;Lee, Jae-Chon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.11
    • /
    • pp.44-51
    • /
    • 2009
  • A variety of Urban Rail Transit (URT) systems have been operating and they have different technology bases, causing a lot of difficulties in taking measures against trouble, training, upgrading, interoperability and so on. As such, a standardization project has been carried out to solve the problems by setting up the national standards for URT systems. A common database was built to provide the integrated engineering environment to the community of URT project. This paper discusses the design of the database and how it can be utilized in the successful promotion of the project. The products of the projects are stored into the database with traceability management to be referred to by other new URT projects for reusing and sharing the acquired knowledge through cross organizations.