• 제목/요약/키워드: National Construction Project

검색결과 1,157건 처리시간 0.029초

IMPACT OF TECHNOLOGY UTILIZATION ON PROJECT OWNER SATISFACTION

  • Li-Ren Yang;Chung-Fah Huang
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.754-757
    • /
    • 2005
  • Construction firms attempt to improve project performance by adopting technology. However, the advantages gained from technology utilization are still not clear. Lack of information regarding technology benefits has resulted in industry reluctance to implement new technology. Therefore, there are needs for studies that quantify the impacts of technology utilization on project performance. An industry-wide survey was used to collect project data from 70 capital facility projects on the issue of technology usage and project owner satisfaction parameter. This paper reports on integration/automation technology usage in the Taiwanese construction industry and associated impacts on project owner satisfaction. In addition, integration and automation technology findings are presented by project phase. The analyses indicate that projects with owner satisfaction have, on average, higher levels of technology utilization than projects with owner dissatisfaction for all technology usage metrics analyzed.

  • PDF

표준$\cdot$전문$\cdot$공사시방서의 작성방법 개선방안에 관한 연구 (A Study for the Development of Writing National Standard Specifications, Owner′s Standard Specifications and Project Specifications)

  • 구재동;김태송
    • 한국건설관리학회논문집
    • /
    • 제1권3호
    • /
    • pp.81-88
    • /
    • 2000
  • 정부에서는 건설기술관리법 개정을 통해 국내 시방서의 위계를 표준시방서, 전문시방서, 공사시방서로 정하였고, 설계도서 작성시 기존의 '특별(특기)시방서'에 여러 표준시방서 등을 첨부하여 사용하던 것에서 탈피하여, 표준시방서, 전문시방서 등의 해당 내용을 발췌, 수정, 보완하여 '공사시방서'를 작성하도록 하였다. 그러나 아직도 공사시방서의 수준은 이전의 특별(특기)시방서의 수준을 벗어나지 못하고 있다. 본 연구에서는 이러한 상황에서 공사시방서 수준을 향상시키기 위하여 시방서(표준 전문공사)운영체계 개선방안 및 시방서(표준$\cdot$전문$\cdot$공사)의 일반적인 작성방법 개선방안 ,총칙 작성방법 개선방안 등을 제시하였다.

  • PDF

Measuring Performance in Egyptian Construction Firms Applying Quality Management Systems

  • Abd Elhamid, Manal S.;Ghareeb, Sahar.Sh.
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.18-27
    • /
    • 2011
  • Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies have shown. However, considering all the firm's aspects in a competitive way is a crucial process for the ECF's culture. This research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance at the organizational level, and to explore its impact on the organizations that adopt QMS. This model is based on specific elements and their related indicators which have been derived from national approaches and models of MP. This model determines the performance level (PL) of the organization that is measured by means of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the ECFs. This model has been validated using another questionnaire and the majority of surveyed experts agreed that the proposed model can be applied effectively.

CULTURAL IMPACT ON KNOWLEDGE MANAGEMENT PROCESS AFFECTING PROJECT MANAGEMENT PRACTICE

  • Eric Wai-Leung Chan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.173-183
    • /
    • 2009
  • Knowledge management (KM) is one of the useful management tools in today's project management (PM) practice, such as construction projects. Nobody can deny the importance of "useful knowledge" always helps organizations and project managers shaping a decision. Due to the trend of globalization, it is now very common that an organization may comprise employees from different countries of distinct national-cultures working together. It is also not uncommon that different projects, within an organization, may have their own organizational-cultures which influence its knowledge repository, transfer process and knowledge strategy. Therefore, it is extremely difficult to align all these cultures and consolidate them to benefit the KM process and PM practice. Organizations and project managers understand that different national-cultural and organizational-cultural factors will create impact on the philosophy of KM process which will subsequently affect PM practice. Those factors may affect interpersonal relations and exchange of knowledge between projects and amongst staff. Systematic KM process can utilize the goodness of different employees from distinct cultures which can eventually drive the organization and projects to success. The purpose of this paper, based upon a case study of a Hong Kong construction company, is to discuss how those cultural factors are linked to KM and what organization and project managers can do to improve the KM process and PM practice.

  • PDF

Assessing Indonesian Construction Regulations on Quality and Performance

  • Willar, Debby;Rumbayan, Rilya;Manueke, Selfy;Mandagi, Robert
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.481-485
    • /
    • 2015
  • Indonesian construction companies are currently facing high competition both among themselves and with global construction companies. In order to address this issue, the Government of Indonesia has enacted specific regulations and policies relating to the development and implementation of quality management systems (QMSs) ISO 9001 based in construction, acknowledging that the consistency of construction project quality requires a formal quality system as a guarantee to raise quality standards at all project stages. The research has been undertaken to examine the effectiveness of the regulations and policies against several key performance indicators (KPIs) of the ISO 9001 Indonesian construction companies. A comprehensive review of the relevant regulations and policies together with interviews with the Government and National Construction Services Development Board recommend possible additional guidelines and supporting quality system, which intends to measure contractors' project output against defined standards as well as to assess their performance among other similar service providers. The outcomes of the research contribute to the development of the Indonesian own construction industry quality measurement and assessment system.

  • PDF

Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

PROGRAM MANAGEMENT STRATEGY FOR THE MaCC PROJECT

  • Boknam Lee;Wooyoung Kim;Seokin Choi;Hyounseung Jang;Bonsang Koo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1582-1590
    • /
    • 2009
  • In 2006, Korean Government decided to relocate the several Government bodies and public institutes. They include total of 49 central Government agencies, semi-government agencies, and 17 national research institutes. The completion of the relocation program has been set to be final in 2030. The target population for the city plan is set to be 500,000. The goal of MAC is first to complete the first phase of the program by 2014 within the budget. In order to achieve the goal, considerable time has been spent to properly establish the program management system. The success of MAC's Multi-function Program Administration System is too early to determine as it is still in progressive. The success depends on the operations not the development.

  • PDF

어장·어촌과 연계한 지방어항건설사업의 평가분석 (The Evaluation Analysis of the Local Fishing Port Construction Project in Connection with Fishery and Fishing Village)

  • 신승식;박주삼
    • 수산해양교육연구
    • /
    • 제20권3호
    • /
    • pp.369-380
    • /
    • 2008
  • The government has promoted the local fishing port construction project since 1972 for conquest of the crisis of the fishing village by withering of a fishery, the improvement in fishermen's living environment and quality of life, and promotion of fisheries. In order to estimate the local fishing port construction project objective and synthetically, and to grope for the method proposal of system establishment of the project, the monitoring survey was carried out. The monitoring survey was classified into the program and the performance monitoring. The program monitoring was carried out in order to investigate the project fit for the inhabitants of a fishing village. The performance monitoring was carried out in order to investigate the development latent powers, fishery latent powers, tourism latent powers of a fishing village, rural settlement conditions, etc. using various statistical materials. Since investigating the measured value before executing a policy was not completed, the project effect was compared with the measured value of other areas. According to the local fishing port construction project, the development latent powers, fishery latent powers, and tourism latent powers of the fishing village where the project was undertaken improved greatly, and income of the fishing village increased greatly. As a result of comparing project fit in order to evaluate the project, the project fit of the local fishing port construction project area was higher than the non-project area. Desirable method proposal of monitoring survey was established and the method for raising the efficiency of monitoring survey was extracted.

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF