Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권3호
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

A Study on Development of IT System Roadmap in Construction industry

  • Xue-Quan Lee;Moon-Seo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1404-1409
    • /
    • 2009
  • These days, the extension and complication of construction project has attached greater significance to IT system for effective project management. Construction companies inside the country have established IT system, but the fact is that they are not up to the expectations of investment provision, and the absense of objective and strategy about project management information system makes its efficiency doubtful. The research, from the point view of construction company, makes an estimate of indefinite future, and presents the process of making out IT system roadmap as a long-term strategy in building IT system.

  • PDF

조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향 (Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service)

  • 이종태;윤현도
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.3-11
    • /
    • 2021
  • 건설사업관리용역사업자는 '과업내용서'에 명시된 각 시공 단계의 활동을 명확하게 수행해야한다. 본 연구에서는 업무의 빈도와 중요성을 고려하여 '설계변경'과 '준공처리'를 핵심 업무로 분류하였다. 이어서, 실제 수행된 건설 프로젝트를 분석하여 핵심 업무에 대한 과업내용을 표준화했다. 이를 통해 발주청, 건설사업관리기술인 및 시공자가 건설사업관리의 업무 영역을 명확히 이해하고 각자의 업무에 대해 책임을 다할 수 있는 기틀을 마련했다.

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

IMPLEMENTATION OF TRL TOOLS TO KOREAN NATIONAL CONSTRUCTION AND TRANSPORTATION R&D PROJECTS FOR IMPROVING PRACTICAL USE

  • Namgyun Kim;Byungho An;Jaehong Choi;Hyunseok Lee;Sanghyuk Park;Yeasang Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-615
    • /
    • 2013
  • The major countries including Korea extend the national investment on R&D and implement the business performance diffusion policy as the knowledge based competition age arrives recently. The necessity for risk management and systematic management system for R&D achievement have been appeared to prevent the failure as the R&D scale becomes larger as it was said. For this matter, the organization such as NASA and DoD in USA defines the Technology Readiness Level (TRL) as a quantitative accomplishment management index and utilize the Technology Readiness Assessment (TRA) system as a criterion. Such tool is evaluated as very effective in the R&D project purposed the practicalization. It is expected that the disadvantage of evaluation system which is oriented to the academic accomplishment in its contents of current research and to contribute greatly to the practicalization of outcomes when such technology readiness level concept is applied to Korean national construction and transportation R&D project. Accordingly, this study analyzed the concept of TRL·TRA, the characteristics and current evaluation management system of Korean national construction and transportation R&D project and suggested the construction and transportation R&D project TRL·TRA performance model to accomplish the practicalization purpose.

  • PDF

Perception Based Definition of Construction Quality in Pakistan

  • Awan, Muhammad Yousaf Sadiq;Awan, Dr Muhammad Maqbool Sadiq
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.24-34
    • /
    • 2015
  • The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

THE RESEARCH OF CONSTRUCTION PROJECT MATERIALS REQUIREMENT SYSTEM

  • Pan Nai-Hsin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.764-767
    • /
    • 2005
  • In the construction industry, materials management is one of the most important components in construction engineering life cycle. Materials management optimization is one of the research subjects in the field of construction management. In the materials management system of a construction project, the suitability of selecting procurement planning strategy will influence the result of project completion. This study conducts literature review at first and also refers the related issue in other industry's application. Associated with the characteristics of construction project in civil engineering and the concept of object oriented design applied in the materials management, this research is aimed to establish a construction materials requirement preliminary system.

  • PDF

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

TEN MANAGEMENT STRATEGIES TO AVOID CONSTRUCTION CONFLICTS

  • Nirmal Kumar Acharya;Young Dai Lee;Soo Yong Kim;Yong Duek Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.709-713
    • /
    • 2005
  • The conflict problems encountered in the construction projects led to prolonged delays in implementation, interruptions and sometimes suspension. This paper has described ten fundamental management principles to avoid conflicts in construction field and increase the productivity. They are: i) hire good (not cheap) construction professionals ii) set reasonable time and cost goals iii) recognize contractors and designers are in business to make profit iv) draft a clear contract document v) pick a suitable project delivery system vi) implement a front-end approach vii) accept construction project as a dynamic process viii) need of education and training of professionals ix) accountability and teamwork in construction site, and x) avoid negligence.

  • PDF

APPLICATION OF AHP IN IDENTIFYING CONSTRUCTION PRODUCTIVITY FACTORS

  • Ishwar Adhikari;Soo-Yong Kim;Young Dai Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.667-671
    • /
    • 2005
  • Analytical hierarchy process (AHP) is a potential decision making method in management that can be used in project management as well. Lack of productivity is perhaps the number one problem confronting in the construction industry. There are numerous factors which affect the productivity of a construction project, so it is necessary to find out the critical factors giving birth to productivity. In this paper, construction productivity is taken as example for the demonstration of the AHP application to find out the critical productivity factor in which the Level 1 is taken as selection of critical productivity factor, Level 2 as construction parties and Level 3 as productivity factors group. The outcome of this study is beneficial to the entire constructional professionals for applying the AHP.

  • PDF