• 제목/요약/키워드: NATM터널

검색결과 242건 처리시간 0.022초

터널 시공이음부에서의 방수재 역할에 대한 실험연구 (An Experimental Study on Performance of neater Stops at Construction joints in Tunnel)

  • 백송훈
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.217-223
    • /
    • 1999
  • Mostly, water leakage took place in construction joints. In case of cable tunnels constructed by open-cut method, waterstops have been used to prevent the water leakage. But, we haven't any experience to install the waterstops in NATM cable tunnels. So, it is necessary to develope the waterstops and test the performance of it in laboratory. We manufactured cable tunnel lining quarter scale model by pouring concrete, and installed the waterstops. After filling the inside of concrete lining about two-third with water, we put the air pressure on the water, In addition, it is also carried out water leakage test for concrete lining model without waterstops. As a result, we confirmed the performance of waterstops and its adaptability. It is also tested that the performance of rubber gaskets used in concrete segments of Shield tunnelling. In addition, we determined the allowable infiltration rate for cable tunnel with non-drainage system.

  • PDF

도심지 지하철 터널의 지반보강공법 시공사례 연구 (A Case Study on the Reinforcement Method of Subway Tunnel)

  • 천병식;여유현;최현석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.201-208
    • /
    • 1999
  • The NATM(New Austrian Tunnelling Method) has been used for tunnelling since 1980's. But Collapses of tunnel under construction take place frequently, especially at urban areas because of adjacent buildings, underground conduits and traffic loads. This paper is a case study on the reinforcement method of subway tunnel at urban areas. In this study, ground inspection, geological investigation, laboratory test and numerical analysis by means of FDM program were carried out. The tunnel excavation was stopped because of over excessive brake of tunnel crown and shotcrete was installed to prevent deformation of adjacent ground as the temporary method. From the result of field survey and geological investigation, it is found that the soft weathered soil was distributed to the ground of tunnel invert unlike original investigation. The results of the analysis and the study show that the SGR(Space Grouting Rocket) method and Umbrella method can be applied for the stability of tunnel excavation and in addition the reinforcement of concrete lining is required for long-term stability of tunnel.

  • PDF

주거지역 터널공사에서의 발파진동 저감사례 (A Case of Blasting Vibration Reduction in the Tunnel Construction under a Residential Area)

  • 강진욱;이현구;이명철
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 춘계학술대회논문집
    • /
    • pp.175-180
    • /
    • 2007
  • This paper presents a case study on blasting vibration reduction in NATM(New Australian Tunnelling Method) tunnel construction carried out under a congested residential area. In NATM tunnel constructions, blasting is an essential process, thus vibration phenomenon is inevitable. Therefore, the vibration reduction was tried to avoid expected complaints from the public living in the area. Test blastings were performed to get the constants for an estimation formula of vibration velocity. Then the influence area was approximated using the estimation formula, and construction methods for the vibration reduction were sought based on the results.

  • PDF

NATM 터널의 대심도 풍화대층에서의 지반거동 및 보강방법 (Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone)

  • 성화돈;안정환;천병식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1782-1788
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analysis of failure rate and vertical stress ratio show that the tunnel for which the height of the cover(H) was higher than four times the diameter, it can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods were showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than where using Ring-cut split method. In addition the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

  • PDF

변형연화모델을 이용한 미고결 지반의 터널변형 (Tunnel Deformation in Shallow Unconsolidated Ground by Using Strain-Softening Model)

  • 서인식;김병탁
    • 한국산업융합학회 논문집
    • /
    • 제10권2호
    • /
    • pp.81-88
    • /
    • 2007
  • In case of an urban tunnel, the displacement of ground base controls the tunnel design because it is built on shallow and unconsolidated ground many times. There are more insufficiency to describe the ground movement which coincides in the measured result of the situ because the design of an urban tunnel is dependent on the method of numerical analysis used to the existing elastic and elasto-plastic models. We studied about the prediction for the ground movement of a shallow tunnel in unconsolidated ground, mechanism of collapse, and settlement. Also this paper shows comparison with the existing elastic and elasto-plastic model using the unlinear analysis of the strain-softening model. We can model the real ground movement as the increasement of ground surface inclination or occurrence of shear band by using strain-softening model for the result of ground movement of an urban NATM tunnel.

  • PDF

터널굴착 중 발생하는 변위 및 응력의 변화양상에 대한 기초적인 연구 (A Basic Study on Change Aspect of Displacement and Stress in NATM Tunnel Excavation)

  • 정인철;박종관;이준석;이승도
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.860-865
    • /
    • 2005
  • In Korea, NATM (New Austrian Tunneling Method) has widely been used in order for constructing tunnels. The major support materials of the method are the shotcrete and rock bolt together with the arch-shaped tunnel section, which ensure the inherent strength of the rock masses. One of the most important features of the method is the feedback system between tunnel analyses and measurements, such as tunnel displacement and support stresses. This study, therefore, attempts to examine the difference in displacement and stresses between numerical results. and measurements in order for more practical design and construction of tunnels.

  • PDF

현장계측에 의한 터널주변지반의 변위연구 (Field Measurements of Ground Movements Around Tunnel)

  • 홍성완;배규진
    • 한국지반공학회지:지반
    • /
    • 제1권2호
    • /
    • pp.41-54
    • /
    • 1985
  • 비교적 얕은 깊이에서 터널을 착굴하거나 개착을 하늘 경우, 열변지반에 침하 및 수평이동 등의 변위가 발생하게 된다. 이러한 변위는 주변 구조물의 안정에 큰 영향을 미치며, 심한 경우 주변 구조물이 파괴되는 상태에 까지 이른다. 인구가 밀집된 대도시에 지하철을 시공할 경우, 주변 문화재, 고층건물, 상하수도관, 가스관 등의 안정을 지하철 설계시 고려하여야 하므로 터널굴착에 따른 지반변위의 예측과 자세한 침하의 원인이 규명되어야 할 필요가 있다. 본 연구에서는 지반 침하량 및 침하발생 영역을 예상하거나 침하요인을 파악하기 위하여 부산지하철 NATM회간의 지표면 침하, 지표면 수평변위, 지중침하, 천단침하 들에 관한 측정 분석이 이루어졌다. 그 결과, 횡방향 지표면 침하는 Gaussian normal probability curve, 종방향 지표면 심하하는 cumulative Gaussian probability curve로서 해석이 가능하다는 것과 가인버어트의 조기폐합이 침하량 감소에 큰 영향을 미친다는 것을 알 수 있었다.

  • PDF

암반 등급 변화에 따른 터널 내공 변위 거동 특설 (Characteristics of Tunnel Convergence Behaviour based on Variation of Rock Mass Rating)

  • 김광염
    • 지질공학
    • /
    • 제18권4호
    • /
    • pp.545-553
    • /
    • 2008
  • 터널 시공 중 막장관찰과 계측자료는 굴착으로 인하여 발생하는 지반 및 주변 구조물의 안정성 평가를 위한 가장 중요한 정보이다. 특히, 발파 굴착으로 이루어지는 NATM 공법에서 막장관찰과 계측은 다음 막장의 굴착 및 지보설계를 위한 핵심자료로 활용이 된다. 하지만, 국내에는 암반분류 결과와 계측결과의 관계에 대한 연구가 많이 부족하여 굴착 및 지보설계에 제대로 활용되지 못하고 있는 실정이다. 본 연구에서는 막장관찰에 의한 암반분류 중 국내외에서 가장 많이 사용되는 RMR 분류법과 내공변위 계측결과의 분석을 통해 지질상태의 변화가 터널의 거동에 미치는 영향을 살펴보고자 하였다. 내공변위의 계측위치와 계측 시점에 따른 변위 측정 편차를 변위 함수를 이용해 보정하였으며, 이를 통해 내공변위의 영향선과 지반조건의 관계를 고찰하였다. 또한 변위 함수 파라미터와 초기변위 발생비율 등 내공변위와 관련된 다양한 요소들의 지반조건에 따른 변화양상을 파악함으로써 막장관찰 및 내공변위 계측을 통한 지반 평가의 기초자료를 제시하고자 하였다.

근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석 (The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project)

  • 박태일;김경훈;신은영
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.37-43
    • /
    • 2019
  • 주당 최장 법정 근로시간을 단축하는 내용의 '근로기준법 개정안'이 통과됨에 따라 근로시간 단축에 따른 근로자 소득감소, 공사기간 연장, 공사비 증가 등 다양한 문제가 발생하고 있다. 특히 다른 산업과 비교할 때, 생산성을 중시하는 건설 프로젝트의 경우 공종에 따라 주 52시간 근무제에 따른 영향의 정도가 더 클 것으로 예상되나 이에 대한 연구는 미흡한편이다. 이에 본 연구에서는 NATM 터널 공사를 대상으로 표준품셈 기반의 표준공정과 굴착 사이클 타임 그리고 공종별 단위 공기를 제시하고, 이를 통해 주 52시간 근무 적용에 따른 실제 작업조의 변화와 이에 따른 표준 공기 및 공사비의 영향을 분석하였다. 분석결과 굴착 공기와 총 공기는 각각 20%, 8.9% 증가하였으나, 굴착공사비와 총 공사비는 오히려 각각 1.2%, 0.5% 감소하는 것으로 확인되었다.

지하철 터널 균열밀도 분석을 통한 합리적인 보수보강 방안 연구 (Study on a rational repair and reinforcement by analysis of crack density in OO subway)

  • 윤태국;신용석;안상로;이송
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.262-269
    • /
    • 2005
  • The priority order about a rational repair and reinforcement is generally decided by subjective decision of engineer. An appearance investigation by tunnel scanner that is widely used in foreign nation was carried out to decide about a rational repair and reinforcement through systematic and objective analysis in box and NATM tunnel. We have decided on the order of priority of an rational repair and reinforcement through the crack density analysis by span, distance and location with the result of tunnel scanner.

  • PDF