• Title/Summary/Keyword: Modular

Search Result 2,294, Processing Time 0.029 seconds

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

BIM Application Method for the Quality Management of Modular Houses (모듈러주택 품질관리를 위한 BIM 적용 방안)

  • Lee, Dong Gun;Kim, Jin Won;Sohn, Jeong Rak
    • Land and Housing Review
    • /
    • v.10 no.2
    • /
    • pp.59-67
    • /
    • 2019
  • The recent paradigm shift in the construction industry has led to a growing demand for industrial construction. In particular, interest in modular housing, one of the areas of industrialization architecture, is soaring. Modular housing is a construction method for completing a building by transporting factory-built modules to the site and assembling them. However, modular housing in Korea has various problems such as errors in design books, lack of factory drawings, and lack of on-site construction plans. BIM is a tool for accumulating, producing and managing various information through 3D models and is a solution to solve various problems of modular housing. In this study, problems of modular housing and BIM utilization of modular housing were presented as ways to ensure the quality of modular housing. Therefore, this study analyzed the problems that are occurring in the construction process of modular housing. And, to address the problem of modular housing, BIM utilization measures were proposed for each modular process step. However, the application of BIM in domestic modular project is currently being carried out in pilot research project. Because of this, the BIM utilize method for modular housing is limited based on the BIM use for general projects and the examples for some modular pilot projects.

3/5-Modular Hadamard-Jacket Symmetric Matrices (3/5-Modular Hadamard-Jacket 대칭 행렬)

  • Park, Ju Yong;Kim, Jeong Su;Szollosi, Ference;Lee, Moon Ho
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.5
    • /
    • pp.9-17
    • /
    • 2013
  • In this paper we introduce modular symmetric designs and use them to study the existence of Hadamard-Jacket matrices modulo 3/5. We prove that there exist 5-modular Hadamard-Jacket matrices of order n if and only if n≢3.7 (mod 10) and n≢6,11. In particular, this solves the 5-modular version of the Hadamard conjecture.

MODULAR POLYNOMIALS FOR MODULAR CURVES X0+(N)

  • Choi, SoYoung
    • Journal of the Chungcheong Mathematical Society
    • /
    • v.24 no.3
    • /
    • pp.529-531
    • /
    • 2011
  • We show that for all $N{\geq}1$, the modular function field $K(X_0^+(N))$ is generated by j(z)j(Nz) and j(z) + j(Nz) over ${\mathbb{C}}$, where j(z) is the modular invariant. Moreover we derive the defining equation of the the modular function field $K(X_0^+(N))$ from the classical modular polynomial ${\Phi}_N(X, Y )$.

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

Modular Design for the Dry Pulverizing/Mixing Device (건식분말화/혼합장치의 모듈화 설계)

  • 김영환;진재현;윤지섭;정재후;홍동희
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2003.10a
    • /
    • pp.64-67
    • /
    • 2003
  • The authors have settled general modular design by analyzing related literatures, but general modular design are too massive to be applicable to all process devices. So, the common parts have to be selected, applied, and modified for the devices. We have chosen the dry pulverizing/mixing device for example. We have elected the target modules of this device such as flange, hinge, bolt, nut coupling. The remote assembling and disassembling possibilities of the selected modules have been analyzed from the viewpoints of visibility, interference, approach, weight and so on. We have presented final modular design proper to the target modules. The modular designs which have adopted the modular property been analyzed. The modular design points are comprised of common and unique points. Some points are common for several devices, such as bolt, flange and so on. Others are unique for each device, such as power transmission coupling. The experimental devices have been modified by these modular design points and the design drawings have been presented.

  • PDF

An Experimental Study on Connection System of FRP Modular Box Member (FRP 모듈형 박스 부재의 연결 시스템에 관한 실험적 연구)

  • Kwak, Kae-Hwan;Jang, Hwa-Sup;Yang, Dong-Woon;Kim, Ho-Sun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.4
    • /
    • pp.29-36
    • /
    • 2009
  • This is a basic experimental study to apply FRP modular box member to a variety of construction structures exposed to flexural strength, such as a slab and a girder. Applying FRP modular box member to a real structure requires a large section. FRP box member was made into modular systems. Tests were conducted under various conditions in order to analyze jointing performance of the developed FRP modular box member as a large section. For the methods of jointing FRP modular box member, synthetic resins connection, mechanical connection, and a combination of both were used to test both length and breadth connection. As a result of the test, using urethane + two bolts + sheets was the most efficient method of connecting FRP modular box member. It is expected that the proposed joint system in this study will contribute to the increase of failure load and synthesis behavior of FRP modular box member.

A Study on the Modular System in Contemporary Furniture (현대가구에 나타난 모듈라 시스템에 관한 연구)

  • 박영순
    • Journal of the Korean Home Economics Association
    • /
    • v.20 no.1
    • /
    • pp.79-85
    • /
    • 1982
  • The objective of this study is to apply the modular furniture system, which has been developed actively in western Europe and America since 1970's, to Korean contemporary furniture having converted into western style gradually. The factors requiring the modular furniture system in today's residential environment are as follows; 1. Population increase and urbanization 2. Development of industrial technology 3. Improvement of living condition and change of life style. As these factors increase the problem of diminishing space, multiple functional modular furniture concept has become a solution. Reviewing the current scene of the western modular furniture system, it is classified into modular seating system, mopular wall system, modular commode system and modular storage system. Korean wardrobe, which is am mixed style of traditional and contemporary furniture, should change to a closet eventually because of the grand size and unpractical use of space. Since most Korean family, however, have wardrobes already, it will be necessary to have a turning period to systemized the closet space in Korean residential interior. For the turning period, application of the modular wall system would be one answer to substitute the wardrobe.

  • PDF

Nonlinear Behavior Analysis of Connections Between Modular Units Using Connecting Steel Plate (연결 강판을 이용한 모듈러 유닛 간 접합부의 비선형 거동 해석)

  • Kim, Hyeon-Gu;Yoo, Jung-Han
    • Journal of Korean Association for Spatial Structures
    • /
    • v.23 no.2
    • /
    • pp.45-52
    • /
    • 2023
  • Modular construction is an economical and efficient construction that reduces time and costs by manufacturing units in factories and constructing them on site. Currently, the demand for modular construction is increasing not only abroad but also domestically. As the demand for modular construction increases, a lot of development and research on connections between modular units are being conducted. Connections between modular units should be quick and simple to assemble when assembling units on site, and should be in a form that allows each unit to be connected regardless of direction. In addition, it must be able to exert sufficient strength against external loads. In this study, a connection between modular units using connecting steel plates and bolts was proposed, and the nonlinear behavior of the connection to external lateral force was analyzed through finite element analysis, and resistance performance was evaluated.