• 제목/요약/키워드: Model construction

검색결과 8,602건 처리시간 0.034초

인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로 (Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project)

  • 오규호;안성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

드론 및 비전 프로세싱 기술을 활용한 디지털 건설현장 관리에 대한 연구 (Research on Digital Construction Site Management Using Drone and Vision Processing Technology)

  • 서민조;박경규;이승빈;김시욱;최원준;김치경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.239-240
    • /
    • 2023
  • Construction site management involves overseeing tasks from the construction phase to the maintenance stage, and digitalization of construction sites is necessary for digital construction site management. In this study, we aim to conduct research on object recognition at construction sites using drones. Images of construction sites captured by drones are reconstructed into BIM (Building Information Modeling) models, and objects are recognized after partially rendering the models using artificial intelligence. For the photorealistic rendering of the BIM models, both traditional filtering techniques and the generative adversarial network (GAN) model were used, while the YOLO (You Only Look Once) model was employed for object recognition. This study is expected to provide insights into the research direction of digital construction site management and help assess the potential and future value of introducing artificial intelligence in the construction industry.

  • PDF

세계화시대에서의 감리기술자제도의 국제통용성확보에 관한 연구 (Acquiring the International Availability of Construction Manager System in the Global Environment)

  • 문행규;양재수
    • 정보통신설비학회논문지
    • /
    • 제8권4호
    • /
    • pp.163-169
    • /
    • 2009
  • Recently, the concern of the FTA (Free Trade Agreement) have shifted to the promotion of the professional service's trade via the bilateral and reciprocal agreement of its professional laws. In the construction industry, this policy has intended to make the standardization of the construction manager's profession in the world. The purpose of this paper is 1) first to define the general model of professions in the U.S., UK and Japan, 2) then to declare the construction manager's model of the profession in them to apply the general model of professions, and 3) finally to analyze the identity of Korean construction managers and acquirement of its construction manager's law comparing with construction manager's model of the profession in the U.S., UK and Japan.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantity)

  • 박홍태;박찬정
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

A Comparison of Construction Cost Estimation Using Multiple Regression Analysis and Neural Network in Elementary School Project

  • Cho, Hong-Gyu;Kim, Kyong-Gon;Kim, Jang-Young;Kim, Gwang-Hee
    • 한국건축시공학회지
    • /
    • 제13권1호
    • /
    • pp.66-74
    • /
    • 2013
  • In the early stages of a construction project, the most important thing is to predict construction costs in a rational way. For this reason, many studies have been performed on the estimation of construction costs for apartment housing and office buildings at early stage using artificial intelligence, statistics, and the like. In this study, cost data held by a provincial Office of Education on elementary schools constructed from 2004 to 2007 were used to compare the multiple regression model with an artificial neural network model. A total of 96 historical data were classified into 76 historical data for constructing models and 20 historical data for comparing the constructed regression model with the artificial neural network model. The results of an analysis of predicted construction costs were that the error rate of the artificial neural network model is lower than that of the multiple regression model.

Exploring Effective BIM Workflow Among Practitioners by Technology Acceptance Model: A Case Study on the Construction of Facade

  • Guo, Jingjing;Yang, Jinze;Peng, Senlin;Mao, Chao
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.201-209
    • /
    • 2017
  • Facade structure system plays an important role in modern architecture and design. Many contractors start using Building Information Modeling (BIM) to help design and lay-out façade walls in recent years. However, there are still some users refuse to accept BIM on façade construction. Therefore, we employed Technology Acceptance Model (TAM) to assess the users acceptable of BIM work flow, with using a practical case of facade construction in Chongqing Wanda City. The factors that will affect the builder's decision of whether using BIM or not when construct façade, and the relationship among them will be found via this model. Through the analysis using TAM, this research found that the direct factors influencing the completely acceptance of BIM in façade construction is the BIM quality and Result Demonstrating, and the parameter impacting the intuition engendering is the Exterior Condition. Therefore, this paper proposes a more systemic model of BIM acceptance in curtain wall to analyze the user's acceptance. The solution can also offer a reference for future research and construct on façade structure. The acceptance model has the significance that it can help to analyze the reason why users refuse to use BIM in façade construction, thus to help users accept BIM.

  • PDF

건설사업관리자 역량 모형 개발 및 역량 요구 분석: D사(社) 사례를 중심으로 (Developing Competency Model and Analyzing Competency Needs for Construction Manager in D Co., Ltd.)

  • 김대영
    • 직업교육연구
    • /
    • 제33권3호
    • /
    • pp.37-56
    • /
    • 2014
  • 이 연구의 목적은 D사(社) 건설사업관리자의 역량 모형을 개발하고, 역량 개발의 요구를 분석하는 것이다. 이를 위해 D사(社)의 우수 건설사업관리자 25명을 대상으로 델파이 방법을 활용하여 역량 모형(안)을 개발하였다. 연구 결과, D사(社) 건설사업관리자 역량 모형은 3개 역량군, 11개 역량, 60개 행동 지표로 구성되었다. 그리고 D사(社) 건설사업관리자 114명을 대상으로 설문조사를 실시하여 우수 집단과 평균 집단의 역량 수준을 비교 분석하는 동시적 구성 타당화를 통해 역량 모형을 검증하였다. 또한 각 역량의 필요 수준과 현재 수준을 조사 분석하여 역량 개발의 우선순위를 도출한 결과, 커뮤니케이션, 리스크 관리, 목표 의식, 고객 지향, 프로젝트 관리 역량에 대한 개발 요구도가 높은 것을 확인하였다. 이상의 연구 결과를 바탕으로 건설사업관리자의 역량 기반 인적자원개발에 관한 몇 가지 시사점을 제시하였다.

적응형 뉴로-퍼지(ANFIS)를 이용한 건축공사비 예측 (Prediction of Building Construction Project Costs Using Adaptive Neuro-Fuzzy Inference System(ANFIS))

  • 윤석헌;박우열
    • 한국건축시공학회지
    • /
    • 제23권1호
    • /
    • pp.103-111
    • /
    • 2023
  • 건설 프로젝트의 초기단계에서 공사비를 정확하게 예측하는 것은 프로젝트를 성공적으로 수행하기 위해 매우 중요하다. 본 연구에서는 ANFIS 모델을 활용하여 건설프로젝트의 초기단계에 건축공사비를 예측할 수 있는 모델을 제시하였다. 모델의 활용도를 높이기 위해 공개된 공사비 데이터를 활용하였으며 프로젝트 초기단계의 제한된 정보를 바탕으로 예측할 수 있는 모델을 제시하고자 하였다. ANFIS와 관련된 기존 연구를 분석하여 최근의 동향을 파악하였으며 ANFIS의 기본 구조를 고찰한 후 건축공사비 예측을 위한 ANFIS 모델을 제시하였다. ANFIS의 모델의 소속함수의 종류와 개수에 따라 달라지는 예측 성능을 분석하여 가장 성능이 우수한 모델을 제시하였으며, 대표적인 기계학습 모델의 예측 정확도와 비교분석하였다. 적용결과 ANFIS 모델을 다른 기계학습 모델과 비교한 결과 동등 이상으로 성능을 나타내 프로젝트 초기단계 공사비 예측에 적용 가능할 것으로 판단된다.

건설 의사결정지원용 정보시스템 활용특성모델 제안 (Proposal of an Application Characteristic Model of Information System for Construction Decision-making Support)

  • 이종국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.145-152
    • /
    • 2004
  • 정보기술을 통한 건설산업의 관리 체계화와 생산성 증대 및 경쟁력 제고를 위해서는 우선적으로 건설업체에서 구축 $\cdot$ 활용하고 있는 정보시스템의 활용특성에 대한 체계적인 정리가 필요하다. 특히, 건설의사결정측면에서 건설데이터를 활용한 고급분석기술인 의시결정지원기술에 대한 전략적이며 체계적인 적용모델을 적립할 필요성이 대두되고 있다. 즉, 건설업체의 정보시스템에 대한 구축 수준을 파악하고 건설의사결정지원과 관련된 문제점을 도출해 낼 수 있는 합리적인 분석틀을 통해 건설정보시스템의 전략적 활용 방안에 대한 기초적인 연구가 필요하다. 이를 위하여 기존 연구들을 바탕으로 푹적된 데이터의 부가가치를 높일 수 있는 대안으로서 의사결정을 지원하기 위한 정보시스템 활용특성 모델을 제안하고 사례연구를 통하여 그 타당성을 검증하였다. 본 연구를 통하여 건설업계의 의사결정지원기술에 대한 인식제고와 건설조직에서 활용하고 있는 정보시스템의 적극적 활용의 대안의 기초를 마련하고자 한다.

  • PDF